TSTP Solution File: ALG087+1 by Duper---1.0

View Problem - Process Solution

%------------------------------------------------------------------------------
% File     : Duper---1.0
% Problem  : ALG087+1 : TPTP v8.1.2. Released v2.7.0.
% Transfm  : none
% Format   : tptp:raw
% Command  : duper %s

% Computer : n009.cluster.edu
% Model    : x86_64 x86_64
% CPU      : Intel(R) Xeon(R) CPU E5-2620 v4 2.10GHz
% Memory   : 8042.1875MB
% OS       : Linux 3.10.0-693.el7.x86_64
% CPULimit : 300s
% WCLimit  : 300s
% DateTime : Wed Aug 30 16:11:18 EDT 2023

% Result   : Theorem 78.87s 79.03s
% Output   : Proof 79.56s
% Verified : 
% SZS Type : -

% Comments : 
%------------------------------------------------------------------------------
%----WARNING: Could not form TPTP format derivation
%------------------------------------------------------------------------------
%----ORIGINAL SYSTEM OUTPUT
% 0.03/0.12  % Problem    : ALG087+1 : TPTP v8.1.2. Released v2.7.0.
% 0.03/0.14  % Command    : duper %s
% 0.13/0.35  % Computer : n009.cluster.edu
% 0.13/0.35  % Model    : x86_64 x86_64
% 0.13/0.35  % CPU      : Intel(R) Xeon(R) CPU E5-2620 v4 @ 2.10GHz
% 0.13/0.35  % Memory   : 8042.1875MB
% 0.13/0.35  % OS       : Linux 3.10.0-693.el7.x86_64
% 0.13/0.35  % CPULimit   : 300
% 0.13/0.35  % WCLimit    : 300
% 0.13/0.35  % DateTime   : Mon Aug 28 03:06:05 EDT 2023
% 0.13/0.35  % CPUTime    : 
% 78.87/79.03  SZS status Theorem for theBenchmark.p
% 78.87/79.03  SZS output start Proof for theBenchmark.p
% 78.87/79.03  Clause #0 (by assumption #[]): Eq
% 78.87/79.03    (And
% 78.87/79.03      (And
% 78.87/79.03        (And
% 78.87/79.03          (And (And (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) (Ne e11 e13))
% 78.87/79.03            (Ne e11 e14))
% 78.87/79.03          (Ne e12 e13))
% 78.87/79.03        (Ne e12 e14))
% 78.87/79.03      (Ne e13 e14))
% 78.87/79.03    True
% 78.87/79.03  Clause #1 (by assumption #[]): Eq
% 78.87/79.03    (And
% 78.87/79.03      (And
% 78.87/79.03        (And
% 78.87/79.03          (And (And (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) (Ne e21 e23))
% 78.87/79.03            (Ne e21 e24))
% 78.87/79.03          (Ne e22 e23))
% 78.87/79.03        (Ne e22 e24))
% 78.87/79.03      (Ne e23 e24))
% 78.87/79.03    True
% 78.87/79.03  Clause #3 (by assumption #[]): Eq
% 78.87/79.03    (And
% 78.87/79.03      (And
% 78.87/79.03        (And
% 78.87/79.03          (And
% 78.87/79.03            (And
% 78.87/79.03              (And
% 78.87/79.03                (And
% 78.87/79.03                  (And
% 78.87/79.03                    (And
% 78.87/79.03                      (And
% 78.87/79.03                        (And
% 78.87/79.03                          (And
% 78.87/79.03                            (And
% 78.87/79.03                              (And
% 78.87/79.03                                (And
% 78.87/79.03                                  (And
% 78.87/79.03                                    (And
% 78.87/79.03                                      (And
% 78.87/79.03                                        (And
% 78.87/79.03                                          (And
% 78.87/79.03                                            (And
% 78.87/79.03                                              (And
% 78.87/79.03                                                (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11))
% 78.87/79.03                                                  (Eq (op1 e10 e12) e12))
% 78.87/79.03                                                (Eq (op1 e10 e13) e13))
% 78.87/79.03                                              (Eq (op1 e10 e14) e14))
% 78.87/79.03                                            (Eq (op1 e11 e10) e11))
% 78.87/79.03                                          (Eq (op1 e11 e11) e10))
% 78.87/79.03                                        (Eq (op1 e11 e12) e13))
% 78.87/79.03                                      (Eq (op1 e11 e13) e14))
% 78.87/79.03                                    (Eq (op1 e11 e14) e12))
% 78.87/79.03                                  (Eq (op1 e12 e10) e12))
% 78.87/79.03                                (Eq (op1 e12 e11) e14))
% 78.87/79.03                              (Eq (op1 e12 e12) e10))
% 78.87/79.03                            (Eq (op1 e12 e13) e11))
% 78.87/79.03                          (Eq (op1 e12 e14) e13))
% 78.87/79.03                        (Eq (op1 e13 e10) e13))
% 78.87/79.03                      (Eq (op1 e13 e11) e12))
% 78.87/79.03                    (Eq (op1 e13 e12) e14))
% 78.87/79.03                  (Eq (op1 e13 e13) e10))
% 78.87/79.03                (Eq (op1 e13 e14) e11))
% 78.87/79.03              (Eq (op1 e14 e10) e14))
% 78.87/79.03            (Eq (op1 e14 e11) e13))
% 78.87/79.03          (Eq (op1 e14 e12) e11))
% 78.87/79.03        (Eq (op1 e14 e13) e12))
% 78.87/79.03      (Eq (op1 e14 e14) e10))
% 78.87/79.03    True
% 78.87/79.03  Clause #4 (by assumption #[]): Eq
% 78.87/79.03    (And
% 78.87/79.03      (And
% 78.87/79.03        (And
% 78.87/79.03          (And
% 78.87/79.03            (And
% 78.87/79.03              (And
% 78.87/79.03                (And
% 78.87/79.03                  (And
% 78.87/79.03                    (And
% 78.87/79.03                      (And
% 78.87/79.03                        (And
% 78.87/79.03                          (And
% 78.87/79.03                            (And
% 78.87/79.03                              (And
% 78.87/79.03                                (And
% 78.87/79.03                                  (And
% 78.87/79.03                                    (And
% 78.87/79.03                                      (And
% 78.87/79.03                                        (And
% 78.87/79.03                                          (And
% 78.87/79.03                                            (And
% 78.87/79.03                                              (And
% 78.87/79.03                                                (And (And (Eq (op2 e20 e20) e20) (Eq (op2 e20 e21) e21))
% 78.87/79.03                                                  (Eq (op2 e20 e22) e22))
% 78.87/79.03                                                (Eq (op2 e20 e23) e23))
% 78.87/79.03                                              (Eq (op2 e20 e24) e24))
% 78.87/79.03                                            (Eq (op2 e21 e20) e21))
% 78.87/79.03                                          (Eq (op2 e21 e21) e20))
% 78.87/79.03                                        (Eq (op2 e21 e22) e24))
% 78.87/79.03                                      (Eq (op2 e21 e23) e22))
% 78.87/79.03                                    (Eq (op2 e21 e24) e23))
% 78.87/79.03                                  (Eq (op2 e22 e20) e22))
% 78.87/79.03                                (Eq (op2 e22 e21) e24))
% 78.87/79.03                              (Eq (op2 e22 e22) e23))
% 78.87/79.03                            (Eq (op2 e22 e23) e20))
% 78.87/79.03                          (Eq (op2 e22 e24) e21))
% 78.87/79.03                        (Eq (op2 e23 e20) e23))
% 78.89/79.07                      (Eq (op2 e23 e21) e22))
% 78.89/79.07                    (Eq (op2 e23 e22) e21))
% 78.89/79.07                  (Eq (op2 e23 e23) e24))
% 78.89/79.07                (Eq (op2 e23 e24) e20))
% 78.89/79.07              (Eq (op2 e24 e20) e24))
% 78.89/79.07            (Eq (op2 e24 e21) e23))
% 78.89/79.07          (Eq (op2 e24 e22) e20))
% 78.89/79.07        (Eq (op2 e24 e23) e21))
% 78.89/79.07      (Eq (op2 e24 e24) e22))
% 78.89/79.07    True
% 78.89/79.07  Clause #5 (by assumption #[]): Eq
% 78.89/79.07    (Not
% 78.89/79.07      (And
% 78.89/79.07          (And
% 78.89/79.07            (And
% 78.89/79.07              (And
% 78.89/79.07                (And
% 78.89/79.07                  (And
% 78.89/79.07                    (And
% 78.89/79.07                      (And
% 78.89/79.07                        (And
% 78.89/79.07                          (Or (Or (Or (Or (Eq (h e10) e20) (Eq (h e10) e21)) (Eq (h e10) e22)) (Eq (h e10) e23))
% 78.89/79.07                            (Eq (h e10) e24))
% 78.89/79.07                          (Or (Or (Or (Or (Eq (h e11) e20) (Eq (h e11) e21)) (Eq (h e11) e22)) (Eq (h e11) e23))
% 78.89/79.07                            (Eq (h e11) e24)))
% 78.89/79.07                        (Or (Or (Or (Or (Eq (h e12) e20) (Eq (h e12) e21)) (Eq (h e12) e22)) (Eq (h e12) e23))
% 78.89/79.07                          (Eq (h e12) e24)))
% 78.89/79.07                      (Or (Or (Or (Or (Eq (h e13) e20) (Eq (h e13) e21)) (Eq (h e13) e22)) (Eq (h e13) e23))
% 78.89/79.07                        (Eq (h e13) e24)))
% 78.89/79.07                    (Or (Or (Or (Or (Eq (h e14) e20) (Eq (h e14) e21)) (Eq (h e14) e22)) (Eq (h e14) e23))
% 78.89/79.07                      (Eq (h e14) e24)))
% 78.89/79.07                  (Or (Or (Or (Or (Eq (j e20) e10) (Eq (j e20) e11)) (Eq (j e20) e12)) (Eq (j e20) e13))
% 78.89/79.07                    (Eq (j e20) e14)))
% 78.89/79.07                (Or (Or (Or (Or (Eq (j e21) e10) (Eq (j e21) e11)) (Eq (j e21) e12)) (Eq (j e21) e13)) (Eq (j e21) e14)))
% 78.89/79.07              (Or (Or (Or (Or (Eq (j e22) e10) (Eq (j e22) e11)) (Eq (j e22) e12)) (Eq (j e22) e13)) (Eq (j e22) e14)))
% 78.89/79.07            (Or (Or (Or (Or (Eq (j e23) e10) (Eq (j e23) e11)) (Eq (j e23) e12)) (Eq (j e23) e13)) (Eq (j e23) e14)))
% 78.89/79.07          (Or (Or (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) (Eq (j e24) e13)) (Eq (j e24) e14)) →
% 78.89/79.07        Not
% 78.89/79.07          (And
% 78.89/79.07            (And
% 78.89/79.07              (And
% 78.89/79.07                (And
% 78.89/79.07                  (And
% 78.89/79.07                    (And
% 78.89/79.07                      (And
% 78.89/79.07                        (And
% 78.89/79.07                          (And
% 78.89/79.07                            (And
% 78.89/79.07                              (And
% 78.89/79.07                                (And
% 78.89/79.07                                  (And
% 78.89/79.07                                    (And
% 78.89/79.07                                      (And
% 78.89/79.07                                        (And
% 78.89/79.07                                          (And
% 78.89/79.07                                            (And
% 78.89/79.07                                              (And
% 78.89/79.07                                                (And
% 78.89/79.07                                                  (And
% 78.89/79.07                                                    (And
% 78.89/79.07                                                      (And
% 78.89/79.07                                                        (And
% 78.89/79.07                                                          (And
% 78.89/79.07                                                            (And
% 78.89/79.07                                                              (And
% 78.89/79.07                                                                (And
% 78.89/79.07                                                                  (And
% 78.89/79.07                                                                    (And
% 78.89/79.07                                                                      (And
% 78.89/79.07                                                                        (And
% 78.89/79.07                                                                          (And
% 78.89/79.07                                                                            (And
% 78.89/79.07                                                                              (And
% 78.89/79.07                                                                                (And
% 78.89/79.07                                                                                  (And
% 78.89/79.07                                                                                    (And
% 78.89/79.07                                                                                      (And
% 78.89/79.07                                                                                        (And
% 78.89/79.07                                                                                          (And
% 78.89/79.07                                                                                            (And
% 78.89/79.07                                                                                              (And
% 78.89/79.07                                                                                                (And
% 78.89/79.07                                                                                                  (And
% 78.89/79.07                                                                                                    (And
% 78.89/79.07                                                                                                      (And
% 78.89/79.07                                                                                                        (And
% 78.89/79.07                                                                                                          (And
% 78.89/79.07                                                                                                            (And
% 78.89/79.07                                                                                                              (And
% 78.89/79.07                                                                                                                (And
% 78.89/79.07                                                                                                                  (And
% 78.89/79.07                                                                                                                    (And
% 78.89/79.07                                                                                                                      (And
% 78.89/79.07                                                                                                                        (And
% 78.89/79.07                                                                                                                          (And
% 78.89/79.07                                                                                                                            (And
% 78.89/79.07                                                                                                                              (And
% 78.89/79.07                                                                                                                                (Eq
% 78.89/79.07                                                                                                                                  (h
% 78.89/79.07                                                                                                                                    (op1
% 78.89/79.07                                                                                                                                      e10
% 78.89/79.07                                                                                                                                      e10))
% 78.89/79.07                                                                                                                                  (op2
% 78.89/79.07                                                                                                                                    (h
% 78.89/79.07                                                                                                                                      e10)
% 78.89/79.07                                                                                                                                    (h
% 78.89/79.07                                                                                                                                      e10)))
% 78.89/79.07                                                                                                                                (Eq
% 78.89/79.07                                                                                                                                  (h
% 78.89/79.07                                                                                                                                    (op1
% 78.89/79.07                                                                                                                                      e10
% 78.89/79.07                                                                                                                                      e11))
% 78.89/79.07                                                                                                                                  (op2
% 78.89/79.07                                                                                                                                    (h
% 78.89/79.07                                                                                                                                      e10)
% 78.89/79.07                                                                                                                                    (h
% 78.89/79.07                                                                                                                                      e11))))
% 78.89/79.07                                                                                                                              (Eq
% 78.89/79.07                                                                                                                                (h
% 78.89/79.07                                                                                                                                  (op1
% 78.89/79.07                                                                                                                                    e10
% 78.89/79.07                                                                                                                                    e12))
% 78.89/79.07                                                                                                                                (op2
% 78.89/79.07                                                                                                                                  (h
% 78.89/79.07                                                                                                                                    e10)
% 78.89/79.07                                                                                                                                  (h
% 78.89/79.07                                                                                                                                    e12))))
% 78.89/79.07                                                                                                                            (Eq
% 78.89/79.07                                                                                                                              (h
% 78.89/79.07                                                                                                                                (op1
% 78.89/79.07                                                                                                                                  e10
% 78.89/79.07                                                                                                                                  e13))
% 78.89/79.07                                                                                                                              (op2
% 78.89/79.07                                                                                                                                (h
% 78.89/79.07                                                                                                                                  e10)
% 78.89/79.07                                                                                                                                (h
% 78.89/79.07                                                                                                                                  e13))))
% 78.89/79.07                                                                                                                          (Eq
% 78.89/79.07                                                                                                                            (h
% 78.89/79.07                                                                                                                              (op1
% 78.89/79.07                                                                                                                                e10
% 78.89/79.07                                                                                                                                e14))
% 78.89/79.07                                                                                                                            (op2
% 78.89/79.07                                                                                                                              (h
% 78.89/79.07                                                                                                                                e10)
% 78.89/79.07                                                                                                                              (h
% 78.89/79.07                                                                                                                                e14))))
% 78.89/79.07                                                                                                                        (Eq
% 78.89/79.07                                                                                                                          (h
% 78.89/79.07                                                                                                                            (op1
% 78.89/79.07                                                                                                                              e11
% 78.89/79.07                                                                                                                              e10))
% 78.89/79.07                                                                                                                          (op2
% 78.89/79.07                                                                                                                            (h
% 78.89/79.07                                                                                                                              e11)
% 78.89/79.07                                                                                                                            (h
% 78.89/79.07                                                                                                                              e10))))
% 78.89/79.07                                                                                                                      (Eq
% 78.89/79.07                                                                                                                        (h
% 78.89/79.07                                                                                                                          (op1
% 78.89/79.07                                                                                                                            e11
% 78.89/79.07                                                                                                                            e11))
% 78.89/79.07                                                                                                                        (op2
% 78.89/79.07                                                                                                                          (h
% 78.89/79.07                                                                                                                            e11)
% 78.89/79.07                                                                                                                          (h
% 78.89/79.07                                                                                                                            e11))))
% 78.89/79.07                                                                                                                    (Eq
% 78.89/79.07                                                                                                                      (h
% 78.89/79.07                                                                                                                        (op1
% 78.89/79.07                                                                                                                          e11
% 78.89/79.07                                                                                                                          e12))
% 78.89/79.07                                                                                                                      (op2
% 78.89/79.07                                                                                                                        (h
% 78.89/79.07                                                                                                                          e11)
% 78.89/79.07                                                                                                                        (h
% 78.89/79.07                                                                                                                          e12))))
% 78.89/79.07                                                                                                                  (Eq
% 78.89/79.07                                                                                                                    (h
% 78.89/79.07                                                                                                                      (op1
% 78.89/79.07                                                                                                                        e11
% 78.89/79.07                                                                                                                        e13))
% 78.89/79.07                                                                                                                    (op2
% 78.89/79.07                                                                                                                      (h
% 78.89/79.07                                                                                                                        e11)
% 78.89/79.07                                                                                                                      (h
% 78.89/79.07                                                                                                                        e13))))
% 78.89/79.07                                                                                                                (Eq
% 78.89/79.07                                                                                                                  (h
% 78.89/79.07                                                                                                                    (op1
% 78.89/79.07                                                                                                                      e11
% 78.89/79.07                                                                                                                      e14))
% 78.89/79.07                                                                                                                  (op2
% 78.89/79.07                                                                                                                    (h
% 78.89/79.07                                                                                                                      e11)
% 78.89/79.07                                                                                                                    (h
% 78.89/79.07                                                                                                                      e14))))
% 78.89/79.07                                                                                                              (Eq
% 78.89/79.07                                                                                                                (h
% 78.89/79.07                                                                                                                  (op1 e12
% 78.89/79.07                                                                                                                    e10))
% 78.89/79.07                                                                                                                (op2
% 78.89/79.07                                                                                                                  (h e12)
% 78.89/79.07                                                                                                                  (h
% 78.89/79.07                                                                                                                    e10))))
% 78.89/79.07                                                                                                            (Eq
% 78.89/79.07                                                                                                              (h
% 78.89/79.07                                                                                                                (op1 e12
% 78.89/79.07                                                                                                                  e11))
% 78.89/79.07                                                                                                              (op2 (h e12)
% 78.89/79.07                                                                                                                (h e11))))
% 78.89/79.07                                                                                                          (Eq
% 78.89/79.07                                                                                                            (h
% 78.89/79.07                                                                                                              (op1 e12
% 78.89/79.07                                                                                                                e12))
% 78.89/79.07                                                                                                            (op2 (h e12)
% 78.89/79.07                                                                                                              (h e12))))
% 78.89/79.07                                                                                                        (Eq
% 78.89/79.07                                                                                                          (h
% 78.89/79.07                                                                                                            (op1 e12 e13))
% 78.89/79.07                                                                                                          (op2 (h e12)
% 78.89/79.07                                                                                                            (h e13))))
% 78.89/79.07                                                                                                      (Eq
% 78.89/79.07                                                                                                        (h (op1 e12 e14))
% 78.89/79.07                                                                                                        (op2 (h e12)
% 78.89/79.07                                                                                                          (h e14))))
% 78.89/79.07                                                                                                    (Eq (h (op1 e13 e10))
% 78.89/79.07                                                                                                      (op2 (h e13)
% 78.89/79.07                                                                                                        (h e10))))
% 78.89/79.07                                                                                                  (Eq (h (op1 e13 e11))
% 78.89/79.07                                                                                                    (op2 (h e13)
% 78.89/79.07                                                                                                      (h e11))))
% 78.89/79.07                                                                                                (Eq (h (op1 e13 e12))
% 78.89/79.07                                                                                                  (op2 (h e13) (h e12))))
% 78.89/79.07                                                                                              (Eq (h (op1 e13 e13))
% 78.89/79.07                                                                                                (op2 (h e13) (h e13))))
% 78.89/79.07                                                                                            (Eq (h (op1 e13 e14))
% 78.89/79.07                                                                                              (op2 (h e13) (h e14))))
% 78.89/79.07                                                                                          (Eq (h (op1 e14 e10))
% 78.89/79.07                                                                                            (op2 (h e14) (h e10))))
% 78.89/79.07                                                                                        (Eq (h (op1 e14 e11))
% 78.89/79.07                                                                                          (op2 (h e14) (h e11))))
% 78.89/79.07                                                                                      (Eq (h (op1 e14 e12))
% 78.89/79.07                                                                                        (op2 (h e14) (h e12))))
% 78.89/79.07                                                                                    (Eq (h (op1 e14 e13))
% 78.89/79.07                                                                                      (op2 (h e14) (h e13))))
% 78.89/79.07                                                                                  (Eq (h (op1 e14 e14))
% 78.89/79.07                                                                                    (op2 (h e14) (h e14))))
% 78.89/79.08                                                                                (Eq (j (op2 e20 e20))
% 78.89/79.08                                                                                  (op1 (j e20) (j e20))))
% 78.89/79.08                                                                              (Eq (j (op2 e20 e21))
% 78.89/79.08                                                                                (op1 (j e20) (j e21))))
% 78.89/79.08                                                                            (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 78.89/79.08                                                                          (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 78.89/79.08                                                                        (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 78.89/79.08                                                                      (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 78.89/79.08                                                                    (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 78.89/79.08                                                                  (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 78.89/79.08                                                                (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 78.89/79.08                                                              (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 78.89/79.08                                                            (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 78.89/79.08                                                          (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 78.89/79.08                                                        (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 78.89/79.08                                                      (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 78.89/79.08                                                    (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 78.89/79.08                                                  (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 78.89/79.08                                                (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 78.89/79.08                                              (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 78.89/79.08                                            (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 78.89/79.08                                          (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 78.89/79.08                                        (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 78.89/79.08                                      (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 78.89/79.08                                    (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 78.89/79.08                                  (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 78.89/79.08                                (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 78.89/79.08                              (Eq (h (j e20)) e20))
% 78.89/79.08                            (Eq (h (j e21)) e21))
% 78.89/79.08                          (Eq (h (j e22)) e22))
% 78.89/79.08                        (Eq (h (j e23)) e23))
% 78.89/79.08                      (Eq (h (j e24)) e24))
% 78.89/79.08                    (Eq (j (h e10)) e10))
% 78.89/79.08                  (Eq (j (h e11)) e11))
% 78.89/79.08                (Eq (j (h e12)) e12))
% 78.89/79.08              (Eq (j (h e13)) e13))
% 78.89/79.08            (Eq (j (h e14)) e14))))
% 78.89/79.08    True
% 78.89/79.08  Clause #7 (by clausification #[1]): Eq
% 78.89/79.08    (And
% 78.89/79.08      (And
% 78.89/79.08        (And (And (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) (Ne e21 e23))
% 78.89/79.08          (Ne e21 e24))
% 78.89/79.08        (Ne e22 e23))
% 78.89/79.08      (Ne e22 e24))
% 78.89/79.08    True
% 78.89/79.08  Clause #9 (by clausification #[7]): Eq (Ne e22 e24) True
% 78.89/79.08  Clause #10 (by clausification #[7]): Eq
% 78.89/79.08    (And
% 78.89/79.08      (And (And (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) (Ne e21 e23))
% 78.89/79.08        (Ne e21 e24))
% 78.89/79.08      (Ne e22 e23))
% 78.89/79.08    True
% 78.89/79.08  Clause #11 (by clausification #[9]): Ne e22 e24
% 78.89/79.08  Clause #13 (by clausification #[10]): Eq
% 78.89/79.08    (And (And (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) (Ne e21 e23))
% 78.89/79.08      (Ne e21 e24))
% 78.89/79.08    True
% 78.89/79.08  Clause #16 (by clausification #[13]): Eq (And (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) (Ne e21 e23)) True
% 78.89/79.08  Clause #19 (by clausification #[16]): Eq (And (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) (Ne e21 e22)) True
% 78.89/79.10  Clause #22 (by clausification #[0]): Eq
% 78.89/79.10    (And
% 78.89/79.10      (And
% 78.89/79.10        (And (And (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) (Ne e11 e13))
% 78.89/79.10          (Ne e11 e14))
% 78.89/79.10        (Ne e12 e13))
% 78.89/79.10      (Ne e12 e14))
% 78.89/79.10    True
% 78.89/79.10  Clause #25 (by clausification #[19]): Eq (And (And (And (Ne e20 e21) (Ne e20 e22)) (Ne e20 e23)) (Ne e20 e24)) True
% 78.89/79.10  Clause #27 (by clausification #[25]): Eq (Ne e20 e24) True
% 78.89/79.10  Clause #29 (by clausification #[27]): Ne e20 e24
% 78.89/79.10  Clause #40 (by clausification #[22]): Eq (Ne e12 e14) True
% 78.89/79.10  Clause #41 (by clausification #[22]): Eq
% 78.89/79.10    (And
% 78.89/79.10      (And (And (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) (Ne e11 e13))
% 78.89/79.10        (Ne e11 e14))
% 78.89/79.10      (Ne e12 e13))
% 78.89/79.10    True
% 78.89/79.10  Clause #42 (by clausification #[40]): Ne e12 e14
% 78.89/79.10  Clause #44 (by clausification #[41]): Eq
% 78.89/79.10    (And (And (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) (Ne e11 e13))
% 78.89/79.10      (Ne e11 e14))
% 78.89/79.10    True
% 78.89/79.10  Clause #46 (by clausification #[44]): Eq (Ne e11 e14) True
% 78.89/79.10  Clause #47 (by clausification #[44]): Eq (And (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) (Ne e11 e13)) True
% 78.89/79.10  Clause #48 (by clausification #[46]): Ne e11 e14
% 78.89/79.10  Clause #49 (by clausification #[47]): Eq (Ne e11 e13) True
% 78.89/79.10  Clause #50 (by clausification #[47]): Eq (And (And (And (And (Ne e10 e11) (Ne e10 e12)) (Ne e10 e13)) (Ne e10 e14)) (Ne e11 e12)) True
% 78.89/79.10  Clause #51 (by clausification #[49]): Ne e11 e13
% 78.89/79.10  Clause #52 (by clausification #[50]): Eq (Ne e11 e12) True
% 78.89/79.10  Clause #54 (by clausification #[52]): Ne e11 e12
% 78.89/79.10  Clause #55 (by clausification #[3]): Eq (Eq (op1 e14 e14) e10) True
% 78.89/79.10  Clause #56 (by clausification #[3]): Eq
% 78.89/79.10    (And
% 78.89/79.10      (And
% 78.89/79.10        (And
% 78.89/79.10          (And
% 78.89/79.10            (And
% 78.89/79.10              (And
% 78.89/79.10                (And
% 78.89/79.10                  (And
% 78.89/79.10                    (And
% 78.89/79.10                      (And
% 78.89/79.10                        (And
% 78.89/79.10                          (And
% 78.89/79.10                            (And
% 78.89/79.10                              (And
% 78.89/79.10                                (And
% 78.89/79.10                                  (And
% 78.89/79.10                                    (And
% 78.89/79.10                                      (And
% 78.89/79.10                                        (And
% 78.89/79.10                                          (And
% 78.89/79.10                                            (And
% 78.89/79.10                                              (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11))
% 78.89/79.10                                                (Eq (op1 e10 e12) e12))
% 78.89/79.10                                              (Eq (op1 e10 e13) e13))
% 78.89/79.10                                            (Eq (op1 e10 e14) e14))
% 78.89/79.10                                          (Eq (op1 e11 e10) e11))
% 78.89/79.10                                        (Eq (op1 e11 e11) e10))
% 78.89/79.10                                      (Eq (op1 e11 e12) e13))
% 78.89/79.10                                    (Eq (op1 e11 e13) e14))
% 78.89/79.10                                  (Eq (op1 e11 e14) e12))
% 78.89/79.10                                (Eq (op1 e12 e10) e12))
% 78.89/79.10                              (Eq (op1 e12 e11) e14))
% 78.89/79.10                            (Eq (op1 e12 e12) e10))
% 78.89/79.10                          (Eq (op1 e12 e13) e11))
% 78.89/79.10                        (Eq (op1 e12 e14) e13))
% 78.89/79.10                      (Eq (op1 e13 e10) e13))
% 78.89/79.10                    (Eq (op1 e13 e11) e12))
% 78.89/79.10                  (Eq (op1 e13 e12) e14))
% 78.89/79.10                (Eq (op1 e13 e13) e10))
% 78.89/79.10              (Eq (op1 e13 e14) e11))
% 78.89/79.10            (Eq (op1 e14 e10) e14))
% 78.89/79.10          (Eq (op1 e14 e11) e13))
% 78.89/79.10        (Eq (op1 e14 e12) e11))
% 78.89/79.10      (Eq (op1 e14 e13) e12))
% 78.89/79.10    True
% 78.89/79.10  Clause #57 (by clausification #[55]): Eq (op1 e14 e14) e10
% 78.89/79.10  Clause #71 (by clausification #[4]): Eq (Eq (op2 e24 e24) e22) True
% 78.89/79.10  Clause #72 (by clausification #[4]): Eq
% 78.89/79.10    (And
% 78.89/79.10      (And
% 78.89/79.10        (And
% 78.89/79.10          (And
% 78.89/79.10            (And
% 78.89/79.10              (And
% 78.89/79.10                (And
% 78.89/79.10                  (And
% 78.89/79.10                    (And
% 78.89/79.10                      (And
% 78.89/79.10                        (And
% 78.89/79.10                          (And
% 78.89/79.10                            (And
% 78.89/79.10                              (And
% 78.89/79.10                                (And
% 78.89/79.10                                  (And
% 78.89/79.10                                    (And
% 78.96/79.14                                      (And
% 78.96/79.14                                        (And
% 78.96/79.14                                          (And
% 78.96/79.14                                            (And
% 78.96/79.14                                              (And (And (Eq (op2 e20 e20) e20) (Eq (op2 e20 e21) e21))
% 78.96/79.14                                                (Eq (op2 e20 e22) e22))
% 78.96/79.14                                              (Eq (op2 e20 e23) e23))
% 78.96/79.14                                            (Eq (op2 e20 e24) e24))
% 78.96/79.14                                          (Eq (op2 e21 e20) e21))
% 78.96/79.14                                        (Eq (op2 e21 e21) e20))
% 78.96/79.14                                      (Eq (op2 e21 e22) e24))
% 78.96/79.14                                    (Eq (op2 e21 e23) e22))
% 78.96/79.14                                  (Eq (op2 e21 e24) e23))
% 78.96/79.14                                (Eq (op2 e22 e20) e22))
% 78.96/79.14                              (Eq (op2 e22 e21) e24))
% 78.96/79.14                            (Eq (op2 e22 e22) e23))
% 78.96/79.14                          (Eq (op2 e22 e23) e20))
% 78.96/79.14                        (Eq (op2 e22 e24) e21))
% 78.96/79.14                      (Eq (op2 e23 e20) e23))
% 78.96/79.14                    (Eq (op2 e23 e21) e22))
% 78.96/79.14                  (Eq (op2 e23 e22) e21))
% 78.96/79.14                (Eq (op2 e23 e23) e24))
% 78.96/79.14              (Eq (op2 e23 e24) e20))
% 78.96/79.14            (Eq (op2 e24 e20) e24))
% 78.96/79.14          (Eq (op2 e24 e21) e23))
% 78.96/79.14        (Eq (op2 e24 e22) e20))
% 78.96/79.14      (Eq (op2 e24 e23) e21))
% 78.96/79.14    True
% 78.96/79.14  Clause #73 (by clausification #[71]): Eq (op2 e24 e24) e22
% 78.96/79.14  Clause #89 (by clausification #[5]): Eq
% 78.96/79.14    (And
% 78.96/79.14        (And
% 78.96/79.14          (And
% 78.96/79.14            (And
% 78.96/79.14              (And
% 78.96/79.14                (And
% 78.96/79.14                  (And
% 78.96/79.14                    (And
% 78.96/79.14                      (And
% 78.96/79.14                        (Or (Or (Or (Or (Eq (h e10) e20) (Eq (h e10) e21)) (Eq (h e10) e22)) (Eq (h e10) e23))
% 78.96/79.14                          (Eq (h e10) e24))
% 78.96/79.14                        (Or (Or (Or (Or (Eq (h e11) e20) (Eq (h e11) e21)) (Eq (h e11) e22)) (Eq (h e11) e23))
% 78.96/79.14                          (Eq (h e11) e24)))
% 78.96/79.14                      (Or (Or (Or (Or (Eq (h e12) e20) (Eq (h e12) e21)) (Eq (h e12) e22)) (Eq (h e12) e23))
% 78.96/79.14                        (Eq (h e12) e24)))
% 78.96/79.14                    (Or (Or (Or (Or (Eq (h e13) e20) (Eq (h e13) e21)) (Eq (h e13) e22)) (Eq (h e13) e23))
% 78.96/79.14                      (Eq (h e13) e24)))
% 78.96/79.14                  (Or (Or (Or (Or (Eq (h e14) e20) (Eq (h e14) e21)) (Eq (h e14) e22)) (Eq (h e14) e23))
% 78.96/79.14                    (Eq (h e14) e24)))
% 78.96/79.14                (Or (Or (Or (Or (Eq (j e20) e10) (Eq (j e20) e11)) (Eq (j e20) e12)) (Eq (j e20) e13)) (Eq (j e20) e14)))
% 78.96/79.14              (Or (Or (Or (Or (Eq (j e21) e10) (Eq (j e21) e11)) (Eq (j e21) e12)) (Eq (j e21) e13)) (Eq (j e21) e14)))
% 78.96/79.14            (Or (Or (Or (Or (Eq (j e22) e10) (Eq (j e22) e11)) (Eq (j e22) e12)) (Eq (j e22) e13)) (Eq (j e22) e14)))
% 78.96/79.14          (Or (Or (Or (Or (Eq (j e23) e10) (Eq (j e23) e11)) (Eq (j e23) e12)) (Eq (j e23) e13)) (Eq (j e23) e14)))
% 78.96/79.14        (Or (Or (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) (Eq (j e24) e13)) (Eq (j e24) e14)) →
% 78.96/79.14      Not
% 78.96/79.14        (And
% 78.96/79.14          (And
% 78.96/79.14            (And
% 78.96/79.14              (And
% 78.96/79.14                (And
% 78.96/79.14                  (And
% 78.96/79.14                    (And
% 78.96/79.14                      (And
% 78.96/79.14                        (And
% 78.96/79.14                          (And
% 78.96/79.14                            (And
% 78.96/79.14                              (And
% 78.96/79.14                                (And
% 78.96/79.14                                  (And
% 78.96/79.14                                    (And
% 78.96/79.14                                      (And
% 78.96/79.14                                        (And
% 78.96/79.14                                          (And
% 78.96/79.14                                            (And
% 78.96/79.14                                              (And
% 78.96/79.14                                                (And
% 78.96/79.14                                                  (And
% 78.96/79.14                                                    (And
% 78.96/79.14                                                      (And
% 78.96/79.14                                                        (And
% 78.96/79.14                                                          (And
% 78.96/79.14                                                            (And
% 78.96/79.14                                                              (And
% 78.96/79.14                                                                (And
% 78.96/79.14                                                                  (And
% 78.96/79.14                                                                    (And
% 78.96/79.14                                                                      (And
% 78.96/79.14                                                                        (And
% 78.96/79.14                                                                          (And
% 78.96/79.14                                                                            (And
% 78.96/79.14                                                                              (And
% 78.96/79.14                                                                                (And
% 78.96/79.14                                                                                  (And
% 78.96/79.14                                                                                    (And
% 78.96/79.14                                                                                      (And
% 78.96/79.14                                                                                        (And
% 78.96/79.14                                                                                          (And
% 78.96/79.14                                                                                            (And
% 78.96/79.14                                                                                              (And
% 78.96/79.14                                                                                                (And
% 78.96/79.14                                                                                                  (And
% 78.96/79.14                                                                                                    (And
% 78.96/79.14                                                                                                      (And
% 78.96/79.14                                                                                                        (And
% 78.96/79.14                                                                                                          (And
% 78.96/79.14                                                                                                            (And
% 78.96/79.14                                                                                                              (And
% 78.96/79.14                                                                                                                (And
% 78.96/79.14                                                                                                                  (And
% 78.96/79.14                                                                                                                    (And
% 78.96/79.14                                                                                                                      (And
% 78.96/79.14                                                                                                                        (And
% 78.96/79.14                                                                                                                          (And
% 78.96/79.14                                                                                                                            (And
% 78.96/79.14                                                                                                                              (Eq
% 78.96/79.14                                                                                                                                (h
% 78.96/79.14                                                                                                                                  (op1
% 78.96/79.14                                                                                                                                    e10
% 78.96/79.14                                                                                                                                    e10))
% 78.96/79.14                                                                                                                                (op2
% 78.96/79.14                                                                                                                                  (h
% 78.96/79.14                                                                                                                                    e10)
% 78.96/79.14                                                                                                                                  (h
% 78.96/79.14                                                                                                                                    e10)))
% 78.96/79.14                                                                                                                              (Eq
% 78.96/79.14                                                                                                                                (h
% 78.96/79.14                                                                                                                                  (op1
% 78.96/79.14                                                                                                                                    e10
% 78.96/79.14                                                                                                                                    e11))
% 78.96/79.14                                                                                                                                (op2
% 78.96/79.14                                                                                                                                  (h
% 78.96/79.14                                                                                                                                    e10)
% 78.96/79.14                                                                                                                                  (h
% 78.96/79.14                                                                                                                                    e11))))
% 78.96/79.14                                                                                                                            (Eq
% 78.96/79.14                                                                                                                              (h
% 78.96/79.14                                                                                                                                (op1
% 78.96/79.14                                                                                                                                  e10
% 78.96/79.14                                                                                                                                  e12))
% 78.96/79.14                                                                                                                              (op2
% 78.96/79.14                                                                                                                                (h
% 78.96/79.14                                                                                                                                  e10)
% 78.96/79.14                                                                                                                                (h
% 78.96/79.14                                                                                                                                  e12))))
% 78.96/79.14                                                                                                                          (Eq
% 78.96/79.14                                                                                                                            (h
% 78.96/79.14                                                                                                                              (op1
% 78.96/79.14                                                                                                                                e10
% 78.96/79.14                                                                                                                                e13))
% 78.96/79.14                                                                                                                            (op2
% 78.96/79.14                                                                                                                              (h
% 78.96/79.14                                                                                                                                e10)
% 78.96/79.14                                                                                                                              (h
% 78.96/79.14                                                                                                                                e13))))
% 78.96/79.14                                                                                                                        (Eq
% 78.96/79.14                                                                                                                          (h
% 78.96/79.14                                                                                                                            (op1
% 78.96/79.14                                                                                                                              e10
% 78.96/79.14                                                                                                                              e14))
% 78.96/79.14                                                                                                                          (op2
% 78.96/79.14                                                                                                                            (h
% 78.96/79.14                                                                                                                              e10)
% 78.96/79.14                                                                                                                            (h
% 78.96/79.14                                                                                                                              e14))))
% 78.96/79.14                                                                                                                      (Eq
% 78.96/79.14                                                                                                                        (h
% 78.96/79.14                                                                                                                          (op1
% 78.96/79.14                                                                                                                            e11
% 78.96/79.14                                                                                                                            e10))
% 78.96/79.14                                                                                                                        (op2
% 78.96/79.14                                                                                                                          (h
% 78.96/79.14                                                                                                                            e11)
% 78.96/79.14                                                                                                                          (h
% 78.96/79.14                                                                                                                            e10))))
% 78.96/79.14                                                                                                                    (Eq
% 78.96/79.14                                                                                                                      (h
% 78.96/79.14                                                                                                                        (op1
% 78.96/79.14                                                                                                                          e11
% 78.96/79.14                                                                                                                          e11))
% 78.96/79.14                                                                                                                      (op2
% 78.96/79.14                                                                                                                        (h
% 78.96/79.14                                                                                                                          e11)
% 78.96/79.14                                                                                                                        (h
% 78.96/79.14                                                                                                                          e11))))
% 78.96/79.14                                                                                                                  (Eq
% 78.96/79.14                                                                                                                    (h
% 78.96/79.14                                                                                                                      (op1
% 78.96/79.14                                                                                                                        e11
% 78.96/79.14                                                                                                                        e12))
% 78.96/79.14                                                                                                                    (op2
% 78.96/79.14                                                                                                                      (h
% 78.96/79.14                                                                                                                        e11)
% 78.96/79.14                                                                                                                      (h
% 78.96/79.14                                                                                                                        e12))))
% 78.96/79.14                                                                                                                (Eq
% 78.96/79.14                                                                                                                  (h
% 78.96/79.14                                                                                                                    (op1
% 78.96/79.14                                                                                                                      e11
% 78.96/79.14                                                                                                                      e13))
% 78.96/79.14                                                                                                                  (op2
% 78.96/79.14                                                                                                                    (h
% 78.96/79.14                                                                                                                      e11)
% 78.96/79.14                                                                                                                    (h
% 78.96/79.14                                                                                                                      e13))))
% 78.96/79.14                                                                                                              (Eq
% 78.96/79.14                                                                                                                (h
% 78.96/79.14                                                                                                                  (op1 e11
% 78.96/79.14                                                                                                                    e14))
% 78.96/79.14                                                                                                                (op2
% 78.96/79.14                                                                                                                  (h e11)
% 78.96/79.14                                                                                                                  (h
% 78.96/79.14                                                                                                                    e14))))
% 78.96/79.14                                                                                                            (Eq
% 78.96/79.14                                                                                                              (h
% 78.96/79.14                                                                                                                (op1 e12
% 78.96/79.14                                                                                                                  e10))
% 78.96/79.14                                                                                                              (op2 (h e12)
% 78.96/79.14                                                                                                                (h e10))))
% 78.96/79.14                                                                                                          (Eq
% 78.96/79.14                                                                                                            (h
% 78.96/79.14                                                                                                              (op1 e12
% 78.96/79.14                                                                                                                e11))
% 78.96/79.14                                                                                                            (op2 (h e12)
% 78.96/79.14                                                                                                              (h e11))))
% 78.96/79.14                                                                                                        (Eq
% 78.96/79.14                                                                                                          (h
% 78.96/79.14                                                                                                            (op1 e12 e12))
% 78.96/79.14                                                                                                          (op2 (h e12)
% 78.96/79.14                                                                                                            (h e12))))
% 78.96/79.14                                                                                                      (Eq
% 78.96/79.14                                                                                                        (h (op1 e12 e13))
% 78.96/79.14                                                                                                        (op2 (h e12)
% 78.96/79.14                                                                                                          (h e13))))
% 78.96/79.14                                                                                                    (Eq (h (op1 e12 e14))
% 78.96/79.14                                                                                                      (op2 (h e12)
% 78.96/79.14                                                                                                        (h e14))))
% 78.96/79.14                                                                                                  (Eq (h (op1 e13 e10))
% 78.96/79.14                                                                                                    (op2 (h e13)
% 78.96/79.14                                                                                                      (h e10))))
% 78.96/79.14                                                                                                (Eq (h (op1 e13 e11))
% 78.96/79.14                                                                                                  (op2 (h e13) (h e11))))
% 78.96/79.14                                                                                              (Eq (h (op1 e13 e12))
% 78.96/79.14                                                                                                (op2 (h e13) (h e12))))
% 78.96/79.14                                                                                            (Eq (h (op1 e13 e13))
% 78.96/79.14                                                                                              (op2 (h e13) (h e13))))
% 78.96/79.14                                                                                          (Eq (h (op1 e13 e14))
% 78.96/79.14                                                                                            (op2 (h e13) (h e14))))
% 78.96/79.14                                                                                        (Eq (h (op1 e14 e10))
% 78.96/79.14                                                                                          (op2 (h e14) (h e10))))
% 78.96/79.14                                                                                      (Eq (h (op1 e14 e11))
% 78.96/79.14                                                                                        (op2 (h e14) (h e11))))
% 78.96/79.14                                                                                    (Eq (h (op1 e14 e12))
% 78.96/79.14                                                                                      (op2 (h e14) (h e12))))
% 78.96/79.14                                                                                  (Eq (h (op1 e14 e13))
% 78.96/79.14                                                                                    (op2 (h e14) (h e13))))
% 78.96/79.14                                                                                (Eq (h (op1 e14 e14))
% 78.96/79.14                                                                                  (op2 (h e14) (h e14))))
% 78.96/79.14                                                                              (Eq (j (op2 e20 e20))
% 78.96/79.14                                                                                (op1 (j e20) (j e20))))
% 78.96/79.15                                                                            (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 78.96/79.15                                                                          (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 78.96/79.15                                                                        (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 78.96/79.15                                                                      (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 78.96/79.15                                                                    (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 78.96/79.15                                                                  (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 78.96/79.15                                                                (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 78.96/79.15                                                              (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 78.96/79.15                                                            (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 78.96/79.15                                                          (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 78.96/79.15                                                        (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 78.96/79.15                                                      (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 78.96/79.15                                                    (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 78.96/79.15                                                  (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 78.96/79.15                                                (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 78.96/79.15                                              (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 78.96/79.15                                            (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 78.96/79.15                                          (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 78.96/79.15                                        (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 78.96/79.15                                      (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 78.96/79.15                                    (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 78.96/79.15                                  (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 78.96/79.15                                (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 78.96/79.15                              (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 78.96/79.15                            (Eq (h (j e20)) e20))
% 78.96/79.15                          (Eq (h (j e21)) e21))
% 78.96/79.15                        (Eq (h (j e22)) e22))
% 78.96/79.15                      (Eq (h (j e23)) e23))
% 78.96/79.15                    (Eq (h (j e24)) e24))
% 78.96/79.15                  (Eq (j (h e10)) e10))
% 78.96/79.15                (Eq (j (h e11)) e11))
% 78.96/79.15              (Eq (j (h e12)) e12))
% 78.96/79.15            (Eq (j (h e13)) e13))
% 78.96/79.15          (Eq (j (h e14)) e14)))
% 78.96/79.15    False
% 78.96/79.15  Clause #90 (by clausification #[89]): Eq
% 78.96/79.15    (And
% 78.96/79.15      (And
% 78.96/79.15        (And
% 78.96/79.15          (And
% 78.96/79.15            (And
% 78.96/79.15              (And
% 78.96/79.15                (And
% 78.96/79.15                  (And
% 78.96/79.15                    (And
% 78.96/79.15                      (Or (Or (Or (Or (Eq (h e10) e20) (Eq (h e10) e21)) (Eq (h e10) e22)) (Eq (h e10) e23))
% 78.96/79.15                        (Eq (h e10) e24))
% 78.96/79.15                      (Or (Or (Or (Or (Eq (h e11) e20) (Eq (h e11) e21)) (Eq (h e11) e22)) (Eq (h e11) e23))
% 78.96/79.15                        (Eq (h e11) e24)))
% 78.96/79.15                    (Or (Or (Or (Or (Eq (h e12) e20) (Eq (h e12) e21)) (Eq (h e12) e22)) (Eq (h e12) e23))
% 78.96/79.15                      (Eq (h e12) e24)))
% 78.96/79.15                  (Or (Or (Or (Or (Eq (h e13) e20) (Eq (h e13) e21)) (Eq (h e13) e22)) (Eq (h e13) e23))
% 78.96/79.15                    (Eq (h e13) e24)))
% 78.96/79.15                (Or (Or (Or (Or (Eq (h e14) e20) (Eq (h e14) e21)) (Eq (h e14) e22)) (Eq (h e14) e23)) (Eq (h e14) e24)))
% 78.96/79.15              (Or (Or (Or (Or (Eq (j e20) e10) (Eq (j e20) e11)) (Eq (j e20) e12)) (Eq (j e20) e13)) (Eq (j e20) e14)))
% 78.96/79.15            (Or (Or (Or (Or (Eq (j e21) e10) (Eq (j e21) e11)) (Eq (j e21) e12)) (Eq (j e21) e13)) (Eq (j e21) e14)))
% 78.96/79.15          (Or (Or (Or (Or (Eq (j e22) e10) (Eq (j e22) e11)) (Eq (j e22) e12)) (Eq (j e22) e13)) (Eq (j e22) e14)))
% 78.96/79.15        (Or (Or (Or (Or (Eq (j e23) e10) (Eq (j e23) e11)) (Eq (j e23) e12)) (Eq (j e23) e13)) (Eq (j e23) e14)))
% 78.96/79.15      (Or (Or (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) (Eq (j e24) e13)) (Eq (j e24) e14)))
% 78.96/79.18    True
% 78.96/79.18  Clause #91 (by clausification #[89]): Eq
% 78.96/79.18    (Not
% 78.96/79.18      (And
% 78.96/79.18        (And
% 78.96/79.18          (And
% 78.96/79.18            (And
% 78.96/79.18              (And
% 78.96/79.18                (And
% 78.96/79.18                  (And
% 78.96/79.18                    (And
% 78.96/79.18                      (And
% 78.96/79.18                        (And
% 78.96/79.18                          (And
% 78.96/79.18                            (And
% 78.96/79.18                              (And
% 78.96/79.18                                (And
% 78.96/79.18                                  (And
% 78.96/79.18                                    (And
% 78.96/79.18                                      (And
% 78.96/79.18                                        (And
% 78.96/79.18                                          (And
% 78.96/79.18                                            (And
% 78.96/79.18                                              (And
% 78.96/79.18                                                (And
% 78.96/79.18                                                  (And
% 78.96/79.18                                                    (And
% 78.96/79.18                                                      (And
% 78.96/79.18                                                        (And
% 78.96/79.18                                                          (And
% 78.96/79.18                                                            (And
% 78.96/79.18                                                              (And
% 78.96/79.18                                                                (And
% 78.96/79.18                                                                  (And
% 78.96/79.18                                                                    (And
% 78.96/79.18                                                                      (And
% 78.96/79.18                                                                        (And
% 78.96/79.18                                                                          (And
% 78.96/79.18                                                                            (And
% 78.96/79.18                                                                              (And
% 78.96/79.18                                                                                (And
% 78.96/79.18                                                                                  (And
% 78.96/79.18                                                                                    (And
% 78.96/79.18                                                                                      (And
% 78.96/79.18                                                                                        (And
% 78.96/79.18                                                                                          (And
% 78.96/79.18                                                                                            (And
% 78.96/79.18                                                                                              (And
% 78.96/79.18                                                                                                (And
% 78.96/79.18                                                                                                  (And
% 78.96/79.18                                                                                                    (And
% 78.96/79.18                                                                                                      (And
% 78.96/79.18                                                                                                        (And
% 78.96/79.18                                                                                                          (And
% 78.96/79.18                                                                                                            (And
% 78.96/79.18                                                                                                              (And
% 78.96/79.18                                                                                                                (And
% 78.96/79.18                                                                                                                  (And
% 78.96/79.18                                                                                                                    (And
% 78.96/79.18                                                                                                                      (And
% 78.96/79.18                                                                                                                        (And
% 78.96/79.18                                                                                                                          (And
% 78.96/79.18                                                                                                                            (Eq
% 78.96/79.18                                                                                                                              (h
% 78.96/79.18                                                                                                                                (op1
% 78.96/79.18                                                                                                                                  e10
% 78.96/79.18                                                                                                                                  e10))
% 78.96/79.18                                                                                                                              (op2
% 78.96/79.18                                                                                                                                (h
% 78.96/79.18                                                                                                                                  e10)
% 78.96/79.18                                                                                                                                (h
% 78.96/79.18                                                                                                                                  e10)))
% 78.96/79.18                                                                                                                            (Eq
% 78.96/79.18                                                                                                                              (h
% 78.96/79.18                                                                                                                                (op1
% 78.96/79.18                                                                                                                                  e10
% 78.96/79.18                                                                                                                                  e11))
% 78.96/79.18                                                                                                                              (op2
% 78.96/79.18                                                                                                                                (h
% 78.96/79.18                                                                                                                                  e10)
% 78.96/79.18                                                                                                                                (h
% 78.96/79.18                                                                                                                                  e11))))
% 78.96/79.18                                                                                                                          (Eq
% 78.96/79.18                                                                                                                            (h
% 78.96/79.18                                                                                                                              (op1
% 78.96/79.18                                                                                                                                e10
% 78.96/79.18                                                                                                                                e12))
% 78.96/79.18                                                                                                                            (op2
% 78.96/79.18                                                                                                                              (h
% 78.96/79.18                                                                                                                                e10)
% 78.96/79.18                                                                                                                              (h
% 78.96/79.18                                                                                                                                e12))))
% 78.96/79.18                                                                                                                        (Eq
% 78.96/79.18                                                                                                                          (h
% 78.96/79.18                                                                                                                            (op1
% 78.96/79.18                                                                                                                              e10
% 78.96/79.18                                                                                                                              e13))
% 78.96/79.18                                                                                                                          (op2
% 78.96/79.18                                                                                                                            (h
% 78.96/79.18                                                                                                                              e10)
% 78.96/79.18                                                                                                                            (h
% 78.96/79.18                                                                                                                              e13))))
% 78.96/79.18                                                                                                                      (Eq
% 78.96/79.18                                                                                                                        (h
% 78.96/79.18                                                                                                                          (op1
% 78.96/79.18                                                                                                                            e10
% 78.96/79.18                                                                                                                            e14))
% 78.96/79.18                                                                                                                        (op2
% 78.96/79.18                                                                                                                          (h
% 78.96/79.18                                                                                                                            e10)
% 78.96/79.18                                                                                                                          (h
% 78.96/79.18                                                                                                                            e14))))
% 78.96/79.18                                                                                                                    (Eq
% 78.96/79.18                                                                                                                      (h
% 78.96/79.18                                                                                                                        (op1
% 78.96/79.18                                                                                                                          e11
% 78.96/79.18                                                                                                                          e10))
% 78.96/79.18                                                                                                                      (op2
% 78.96/79.18                                                                                                                        (h
% 78.96/79.18                                                                                                                          e11)
% 78.96/79.18                                                                                                                        (h
% 78.96/79.18                                                                                                                          e10))))
% 78.96/79.18                                                                                                                  (Eq
% 78.96/79.18                                                                                                                    (h
% 78.96/79.18                                                                                                                      (op1
% 78.96/79.18                                                                                                                        e11
% 78.96/79.18                                                                                                                        e11))
% 78.96/79.18                                                                                                                    (op2
% 78.96/79.18                                                                                                                      (h
% 78.96/79.18                                                                                                                        e11)
% 78.96/79.18                                                                                                                      (h
% 78.96/79.18                                                                                                                        e11))))
% 78.96/79.18                                                                                                                (Eq
% 78.96/79.18                                                                                                                  (h
% 78.96/79.18                                                                                                                    (op1
% 78.96/79.18                                                                                                                      e11
% 78.96/79.18                                                                                                                      e12))
% 78.96/79.18                                                                                                                  (op2
% 78.96/79.18                                                                                                                    (h
% 78.96/79.18                                                                                                                      e11)
% 78.96/79.18                                                                                                                    (h
% 78.96/79.18                                                                                                                      e12))))
% 78.96/79.18                                                                                                              (Eq
% 78.96/79.18                                                                                                                (h
% 78.96/79.18                                                                                                                  (op1 e11
% 78.96/79.18                                                                                                                    e13))
% 78.96/79.18                                                                                                                (op2
% 78.96/79.18                                                                                                                  (h e11)
% 78.96/79.18                                                                                                                  (h
% 78.96/79.18                                                                                                                    e13))))
% 78.96/79.18                                                                                                            (Eq
% 78.96/79.18                                                                                                              (h
% 78.96/79.18                                                                                                                (op1 e11
% 78.96/79.18                                                                                                                  e14))
% 78.96/79.18                                                                                                              (op2 (h e11)
% 78.96/79.18                                                                                                                (h e14))))
% 78.96/79.18                                                                                                          (Eq
% 78.96/79.18                                                                                                            (h
% 78.96/79.18                                                                                                              (op1 e12
% 78.96/79.18                                                                                                                e10))
% 78.96/79.18                                                                                                            (op2 (h e12)
% 78.96/79.18                                                                                                              (h e10))))
% 78.96/79.18                                                                                                        (Eq
% 78.96/79.18                                                                                                          (h
% 78.96/79.18                                                                                                            (op1 e12 e11))
% 78.96/79.18                                                                                                          (op2 (h e12)
% 78.96/79.18                                                                                                            (h e11))))
% 78.96/79.18                                                                                                      (Eq
% 78.96/79.18                                                                                                        (h (op1 e12 e12))
% 78.96/79.18                                                                                                        (op2 (h e12)
% 78.96/79.18                                                                                                          (h e12))))
% 78.96/79.18                                                                                                    (Eq (h (op1 e12 e13))
% 78.96/79.18                                                                                                      (op2 (h e12)
% 78.96/79.18                                                                                                        (h e13))))
% 78.96/79.18                                                                                                  (Eq (h (op1 e12 e14))
% 78.96/79.18                                                                                                    (op2 (h e12)
% 78.96/79.18                                                                                                      (h e14))))
% 78.96/79.18                                                                                                (Eq (h (op1 e13 e10))
% 78.96/79.18                                                                                                  (op2 (h e13) (h e10))))
% 78.96/79.18                                                                                              (Eq (h (op1 e13 e11))
% 78.96/79.18                                                                                                (op2 (h e13) (h e11))))
% 78.96/79.18                                                                                            (Eq (h (op1 e13 e12))
% 78.96/79.18                                                                                              (op2 (h e13) (h e12))))
% 78.96/79.18                                                                                          (Eq (h (op1 e13 e13))
% 78.96/79.18                                                                                            (op2 (h e13) (h e13))))
% 78.96/79.18                                                                                        (Eq (h (op1 e13 e14))
% 78.96/79.18                                                                                          (op2 (h e13) (h e14))))
% 78.96/79.18                                                                                      (Eq (h (op1 e14 e10))
% 78.96/79.18                                                                                        (op2 (h e14) (h e10))))
% 78.96/79.18                                                                                    (Eq (h (op1 e14 e11))
% 78.96/79.18                                                                                      (op2 (h e14) (h e11))))
% 78.96/79.18                                                                                  (Eq (h (op1 e14 e12))
% 78.96/79.18                                                                                    (op2 (h e14) (h e12))))
% 78.96/79.18                                                                                (Eq (h (op1 e14 e13))
% 78.96/79.18                                                                                  (op2 (h e14) (h e13))))
% 78.96/79.18                                                                              (Eq (h (op1 e14 e14))
% 78.96/79.18                                                                                (op2 (h e14) (h e14))))
% 78.96/79.18                                                                            (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 78.96/79.18                                                                          (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.03/79.19                                                                        (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.03/79.19                                                                      (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.03/79.19                                                                    (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.03/79.19                                                                  (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.03/79.19                                                                (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.03/79.19                                                              (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.03/79.19                                                            (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.03/79.19                                                          (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.03/79.19                                                        (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.03/79.19                                                      (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.03/79.19                                                    (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.03/79.19                                                  (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.03/79.19                                                (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.03/79.19                                              (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.03/79.19                                            (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.03/79.19                                          (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.03/79.19                                        (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.03/79.19                                      (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.03/79.19                                    (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.03/79.19                                  (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.03/79.19                                (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.03/79.19                              (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.03/79.19                            (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.03/79.19                          (Eq (h (j e20)) e20))
% 79.03/79.19                        (Eq (h (j e21)) e21))
% 79.03/79.19                      (Eq (h (j e22)) e22))
% 79.03/79.19                    (Eq (h (j e23)) e23))
% 79.03/79.19                  (Eq (h (j e24)) e24))
% 79.03/79.19                (Eq (j (h e10)) e10))
% 79.03/79.19              (Eq (j (h e11)) e11))
% 79.03/79.19            (Eq (j (h e12)) e12))
% 79.03/79.19          (Eq (j (h e13)) e13))
% 79.03/79.19        (Eq (j (h e14)) e14)))
% 79.03/79.19    False
% 79.03/79.19  Clause #92 (by clausification #[90]): Eq (Or (Or (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) (Eq (j e24) e13)) (Eq (j e24) e14)) True
% 79.03/79.19  Clause #94 (by clausification #[92]): Or (Eq (Or (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) (Eq (j e24) e13)) True)
% 79.03/79.19    (Eq (Eq (j e24) e14) True)
% 79.03/79.19  Clause #95 (by clausification #[94]): Or (Eq (Eq (j e24) e14) True)
% 79.03/79.19    (Or (Eq (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) True) (Eq (Eq (j e24) e13) True))
% 79.03/79.19  Clause #96 (by clausification #[95]): Or (Eq (Or (Or (Eq (j e24) e10) (Eq (j e24) e11)) (Eq (j e24) e12)) True)
% 79.03/79.19    (Or (Eq (Eq (j e24) e13) True) (Eq (j e24) e14))
% 79.03/79.19  Clause #97 (by clausification #[96]): Or (Eq (Eq (j e24) e13) True)
% 79.03/79.19    (Or (Eq (j e24) e14) (Or (Eq (Or (Eq (j e24) e10) (Eq (j e24) e11)) True) (Eq (Eq (j e24) e12) True)))
% 79.03/79.19  Clause #98 (by clausification #[97]): Or (Eq (j e24) e14)
% 79.03/79.19    (Or (Eq (Or (Eq (j e24) e10) (Eq (j e24) e11)) True) (Or (Eq (Eq (j e24) e12) True) (Eq (j e24) e13)))
% 79.03/79.19  Clause #99 (by clausification #[98]): Or (Eq (j e24) e14)
% 79.03/79.19    (Or (Eq (Eq (j e24) e12) True) (Or (Eq (j e24) e13) (Or (Eq (Eq (j e24) e10) True) (Eq (Eq (j e24) e11) True))))
% 79.03/79.19  Clause #100 (by clausification #[99]): Or (Eq (j e24) e14)
% 79.03/79.19    (Or (Eq (j e24) e13) (Or (Eq (Eq (j e24) e10) True) (Or (Eq (Eq (j e24) e11) True) (Eq (j e24) e12))))
% 79.03/79.19  Clause #101 (by clausification #[100]): Or (Eq (j e24) e14) (Or (Eq (j e24) e13) (Or (Eq (Eq (j e24) e11) True) (Or (Eq (j e24) e12) (Eq (j e24) e10))))
% 79.03/79.23  Clause #102 (by clausification #[101]): Or (Eq (j e24) e14) (Or (Eq (j e24) e13) (Or (Eq (j e24) e12) (Or (Eq (j e24) e10) (Eq (j e24) e11))))
% 79.03/79.23  Clause #111 (by clausification #[56]): Eq
% 79.03/79.23    (And
% 79.03/79.23      (And
% 79.03/79.23        (And
% 79.03/79.23          (And
% 79.03/79.23            (And
% 79.03/79.23              (And
% 79.03/79.23                (And
% 79.03/79.23                  (And
% 79.03/79.23                    (And
% 79.03/79.23                      (And
% 79.03/79.23                        (And
% 79.03/79.23                          (And
% 79.03/79.23                            (And
% 79.03/79.23                              (And
% 79.03/79.23                                (And
% 79.03/79.23                                  (And
% 79.03/79.23                                    (And
% 79.03/79.23                                      (And
% 79.03/79.23                                        (And
% 79.03/79.23                                          (And
% 79.03/79.23                                            (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11))
% 79.03/79.23                                              (Eq (op1 e10 e12) e12))
% 79.03/79.23                                            (Eq (op1 e10 e13) e13))
% 79.03/79.23                                          (Eq (op1 e10 e14) e14))
% 79.03/79.23                                        (Eq (op1 e11 e10) e11))
% 79.03/79.23                                      (Eq (op1 e11 e11) e10))
% 79.03/79.23                                    (Eq (op1 e11 e12) e13))
% 79.03/79.23                                  (Eq (op1 e11 e13) e14))
% 79.03/79.23                                (Eq (op1 e11 e14) e12))
% 79.03/79.23                              (Eq (op1 e12 e10) e12))
% 79.03/79.23                            (Eq (op1 e12 e11) e14))
% 79.03/79.23                          (Eq (op1 e12 e12) e10))
% 79.03/79.23                        (Eq (op1 e12 e13) e11))
% 79.03/79.23                      (Eq (op1 e12 e14) e13))
% 79.03/79.23                    (Eq (op1 e13 e10) e13))
% 79.03/79.23                  (Eq (op1 e13 e11) e12))
% 79.03/79.23                (Eq (op1 e13 e12) e14))
% 79.03/79.23              (Eq (op1 e13 e13) e10))
% 79.03/79.23            (Eq (op1 e13 e14) e11))
% 79.03/79.23          (Eq (op1 e14 e10) e14))
% 79.03/79.23        (Eq (op1 e14 e11) e13))
% 79.03/79.23      (Eq (op1 e14 e12) e11))
% 79.03/79.23    True
% 79.03/79.23  Clause #129 (by clausification #[72]): Eq
% 79.03/79.23    (And
% 79.03/79.23      (And
% 79.03/79.23        (And
% 79.03/79.23          (And
% 79.03/79.23            (And
% 79.03/79.23              (And
% 79.03/79.23                (And
% 79.03/79.23                  (And
% 79.03/79.23                    (And
% 79.03/79.23                      (And
% 79.03/79.23                        (And
% 79.03/79.23                          (And
% 79.03/79.23                            (And
% 79.03/79.23                              (And
% 79.03/79.23                                (And
% 79.03/79.23                                  (And
% 79.03/79.23                                    (And
% 79.03/79.23                                      (And
% 79.03/79.23                                        (And
% 79.03/79.23                                          (And
% 79.03/79.23                                            (And (And (Eq (op2 e20 e20) e20) (Eq (op2 e20 e21) e21))
% 79.03/79.23                                              (Eq (op2 e20 e22) e22))
% 79.03/79.23                                            (Eq (op2 e20 e23) e23))
% 79.03/79.23                                          (Eq (op2 e20 e24) e24))
% 79.03/79.23                                        (Eq (op2 e21 e20) e21))
% 79.03/79.23                                      (Eq (op2 e21 e21) e20))
% 79.03/79.23                                    (Eq (op2 e21 e22) e24))
% 79.03/79.23                                  (Eq (op2 e21 e23) e22))
% 79.03/79.23                                (Eq (op2 e21 e24) e23))
% 79.03/79.23                              (Eq (op2 e22 e20) e22))
% 79.03/79.23                            (Eq (op2 e22 e21) e24))
% 79.03/79.23                          (Eq (op2 e22 e22) e23))
% 79.03/79.23                        (Eq (op2 e22 e23) e20))
% 79.03/79.23                      (Eq (op2 e22 e24) e21))
% 79.03/79.23                    (Eq (op2 e23 e20) e23))
% 79.03/79.23                  (Eq (op2 e23 e21) e22))
% 79.03/79.23                (Eq (op2 e23 e22) e21))
% 79.03/79.23              (Eq (op2 e23 e23) e24))
% 79.03/79.23            (Eq (op2 e23 e24) e20))
% 79.03/79.23          (Eq (op2 e24 e20) e24))
% 79.03/79.23        (Eq (op2 e24 e21) e23))
% 79.03/79.23      (Eq (op2 e24 e22) e20))
% 79.03/79.23    True
% 79.03/79.23  Clause #146 (by clausification #[91]): Eq
% 79.03/79.23    (And
% 79.03/79.23      (And
% 79.03/79.23        (And
% 79.03/79.23          (And
% 79.03/79.23            (And
% 79.03/79.23              (And
% 79.03/79.23                (And
% 79.03/79.23                  (And
% 79.03/79.23                    (And
% 79.03/79.23                      (And
% 79.03/79.23                        (And
% 79.03/79.23                          (And
% 79.03/79.23                            (And
% 79.03/79.23                              (And
% 79.03/79.23                                (And
% 79.03/79.23                                  (And
% 79.03/79.23                                    (And
% 79.03/79.23                                      (And
% 79.03/79.23                                        (And
% 79.03/79.23                                          (And
% 79.03/79.23                                            (And
% 79.03/79.23                                              (And
% 79.03/79.23                                                (And
% 79.03/79.23                                                  (And
% 79.03/79.23                                                    (And
% 79.03/79.23                                                      (And
% 79.03/79.23                                                        (And
% 79.03/79.23                                                          (And
% 79.03/79.23                                                            (And
% 79.03/79.23                                                              (And
% 79.03/79.23                                                                (And
% 79.03/79.23                                                                  (And
% 79.03/79.23                                                                    (And
% 79.03/79.23                                                                      (And
% 79.03/79.23                                                                        (And
% 79.03/79.23                                                                          (And
% 79.03/79.23                                                                            (And
% 79.03/79.23                                                                              (And
% 79.03/79.23                                                                                (And
% 79.03/79.23                                                                                  (And
% 79.03/79.23                                                                                    (And
% 79.03/79.23                                                                                      (And
% 79.03/79.23                                                                                        (And
% 79.03/79.23                                                                                          (And
% 79.03/79.23                                                                                            (And
% 79.03/79.23                                                                                              (And
% 79.03/79.23                                                                                                (And
% 79.03/79.23                                                                                                  (And
% 79.03/79.23                                                                                                    (And
% 79.03/79.23                                                                                                      (And
% 79.03/79.23                                                                                                        (And
% 79.03/79.23                                                                                                          (And
% 79.03/79.23                                                                                                            (And
% 79.03/79.23                                                                                                              (And
% 79.03/79.23                                                                                                                (And
% 79.03/79.23                                                                                                                  (And
% 79.03/79.23                                                                                                                    (And
% 79.03/79.23                                                                                                                      (And
% 79.03/79.23                                                                                                                        (And
% 79.03/79.23                                                                                                                          (Eq
% 79.03/79.23                                                                                                                            (h
% 79.03/79.23                                                                                                                              (op1
% 79.03/79.23                                                                                                                                e10
% 79.03/79.23                                                                                                                                e10))
% 79.03/79.23                                                                                                                            (op2
% 79.03/79.23                                                                                                                              (h
% 79.03/79.23                                                                                                                                e10)
% 79.03/79.23                                                                                                                              (h
% 79.03/79.23                                                                                                                                e10)))
% 79.03/79.23                                                                                                                          (Eq
% 79.03/79.23                                                                                                                            (h
% 79.03/79.23                                                                                                                              (op1
% 79.03/79.23                                                                                                                                e10
% 79.03/79.23                                                                                                                                e11))
% 79.03/79.23                                                                                                                            (op2
% 79.03/79.23                                                                                                                              (h
% 79.03/79.23                                                                                                                                e10)
% 79.03/79.23                                                                                                                              (h
% 79.03/79.23                                                                                                                                e11))))
% 79.03/79.23                                                                                                                        (Eq
% 79.03/79.23                                                                                                                          (h
% 79.03/79.23                                                                                                                            (op1
% 79.03/79.23                                                                                                                              e10
% 79.03/79.23                                                                                                                              e12))
% 79.03/79.23                                                                                                                          (op2
% 79.03/79.23                                                                                                                            (h
% 79.03/79.23                                                                                                                              e10)
% 79.03/79.23                                                                                                                            (h
% 79.03/79.23                                                                                                                              e12))))
% 79.03/79.23                                                                                                                      (Eq
% 79.03/79.23                                                                                                                        (h
% 79.03/79.23                                                                                                                          (op1
% 79.03/79.23                                                                                                                            e10
% 79.03/79.23                                                                                                                            e13))
% 79.03/79.23                                                                                                                        (op2
% 79.03/79.23                                                                                                                          (h
% 79.03/79.23                                                                                                                            e10)
% 79.03/79.23                                                                                                                          (h
% 79.03/79.23                                                                                                                            e13))))
% 79.03/79.23                                                                                                                    (Eq
% 79.03/79.23                                                                                                                      (h
% 79.03/79.23                                                                                                                        (op1
% 79.03/79.23                                                                                                                          e10
% 79.03/79.23                                                                                                                          e14))
% 79.03/79.23                                                                                                                      (op2
% 79.03/79.23                                                                                                                        (h
% 79.03/79.23                                                                                                                          e10)
% 79.03/79.23                                                                                                                        (h
% 79.03/79.23                                                                                                                          e14))))
% 79.03/79.23                                                                                                                  (Eq
% 79.03/79.23                                                                                                                    (h
% 79.03/79.23                                                                                                                      (op1
% 79.03/79.23                                                                                                                        e11
% 79.03/79.23                                                                                                                        e10))
% 79.03/79.23                                                                                                                    (op2
% 79.03/79.23                                                                                                                      (h
% 79.03/79.23                                                                                                                        e11)
% 79.03/79.23                                                                                                                      (h
% 79.03/79.23                                                                                                                        e10))))
% 79.03/79.23                                                                                                                (Eq
% 79.03/79.23                                                                                                                  (h
% 79.03/79.23                                                                                                                    (op1
% 79.03/79.23                                                                                                                      e11
% 79.03/79.23                                                                                                                      e11))
% 79.03/79.23                                                                                                                  (op2
% 79.03/79.23                                                                                                                    (h
% 79.03/79.23                                                                                                                      e11)
% 79.03/79.23                                                                                                                    (h
% 79.03/79.23                                                                                                                      e11))))
% 79.03/79.23                                                                                                              (Eq
% 79.03/79.23                                                                                                                (h
% 79.03/79.23                                                                                                                  (op1 e11
% 79.03/79.23                                                                                                                    e12))
% 79.03/79.23                                                                                                                (op2
% 79.03/79.23                                                                                                                  (h e11)
% 79.03/79.23                                                                                                                  (h
% 79.03/79.23                                                                                                                    e12))))
% 79.03/79.23                                                                                                            (Eq
% 79.03/79.23                                                                                                              (h
% 79.03/79.23                                                                                                                (op1 e11
% 79.03/79.23                                                                                                                  e13))
% 79.03/79.23                                                                                                              (op2 (h e11)
% 79.03/79.23                                                                                                                (h e13))))
% 79.03/79.23                                                                                                          (Eq
% 79.03/79.23                                                                                                            (h
% 79.03/79.23                                                                                                              (op1 e11
% 79.03/79.23                                                                                                                e14))
% 79.03/79.23                                                                                                            (op2 (h e11)
% 79.03/79.23                                                                                                              (h e14))))
% 79.03/79.23                                                                                                        (Eq
% 79.03/79.23                                                                                                          (h
% 79.03/79.23                                                                                                            (op1 e12 e10))
% 79.03/79.23                                                                                                          (op2 (h e12)
% 79.03/79.23                                                                                                            (h e10))))
% 79.03/79.23                                                                                                      (Eq
% 79.03/79.23                                                                                                        (h (op1 e12 e11))
% 79.03/79.23                                                                                                        (op2 (h e12)
% 79.03/79.23                                                                                                          (h e11))))
% 79.03/79.23                                                                                                    (Eq (h (op1 e12 e12))
% 79.03/79.23                                                                                                      (op2 (h e12)
% 79.03/79.23                                                                                                        (h e12))))
% 79.03/79.23                                                                                                  (Eq (h (op1 e12 e13))
% 79.03/79.23                                                                                                    (op2 (h e12)
% 79.03/79.23                                                                                                      (h e13))))
% 79.03/79.23                                                                                                (Eq (h (op1 e12 e14))
% 79.03/79.23                                                                                                  (op2 (h e12) (h e14))))
% 79.03/79.23                                                                                              (Eq (h (op1 e13 e10))
% 79.03/79.24                                                                                                (op2 (h e13) (h e10))))
% 79.03/79.24                                                                                            (Eq (h (op1 e13 e11))
% 79.03/79.24                                                                                              (op2 (h e13) (h e11))))
% 79.03/79.24                                                                                          (Eq (h (op1 e13 e12))
% 79.03/79.24                                                                                            (op2 (h e13) (h e12))))
% 79.03/79.24                                                                                        (Eq (h (op1 e13 e13))
% 79.03/79.24                                                                                          (op2 (h e13) (h e13))))
% 79.03/79.24                                                                                      (Eq (h (op1 e13 e14))
% 79.03/79.24                                                                                        (op2 (h e13) (h e14))))
% 79.03/79.24                                                                                    (Eq (h (op1 e14 e10))
% 79.03/79.24                                                                                      (op2 (h e14) (h e10))))
% 79.03/79.24                                                                                  (Eq (h (op1 e14 e11))
% 79.03/79.24                                                                                    (op2 (h e14) (h e11))))
% 79.03/79.24                                                                                (Eq (h (op1 e14 e12))
% 79.03/79.24                                                                                  (op2 (h e14) (h e12))))
% 79.03/79.24                                                                              (Eq (h (op1 e14 e13))
% 79.03/79.24                                                                                (op2 (h e14) (h e13))))
% 79.03/79.24                                                                            (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.03/79.24                                                                          (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.03/79.24                                                                        (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.03/79.24                                                                      (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.03/79.24                                                                    (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.03/79.24                                                                  (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.03/79.24                                                                (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.03/79.24                                                              (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.03/79.24                                                            (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.03/79.24                                                          (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.03/79.24                                                        (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.03/79.24                                                      (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.03/79.24                                                    (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.03/79.24                                                  (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.03/79.24                                                (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.03/79.24                                              (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.03/79.24                                            (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.03/79.24                                          (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.03/79.24                                        (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.03/79.24                                      (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.03/79.24                                    (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.03/79.24                                  (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.03/79.24                                (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.03/79.24                              (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.03/79.26                            (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.03/79.26                          (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.03/79.26                        (Eq (h (j e20)) e20))
% 79.03/79.26                      (Eq (h (j e21)) e21))
% 79.03/79.26                    (Eq (h (j e22)) e22))
% 79.03/79.26                  (Eq (h (j e23)) e23))
% 79.03/79.26                (Eq (h (j e24)) e24))
% 79.03/79.26              (Eq (j (h e10)) e10))
% 79.03/79.26            (Eq (j (h e11)) e11))
% 79.03/79.26          (Eq (j (h e12)) e12))
% 79.03/79.26        (Eq (j (h e13)) e13))
% 79.03/79.26      (Eq (j (h e14)) e14))
% 79.03/79.26    True
% 79.03/79.26  Clause #147 (by clausification #[146]): Eq (Eq (j (h e14)) e14) True
% 79.03/79.26  Clause #148 (by clausification #[146]): Eq
% 79.03/79.26    (And
% 79.03/79.26      (And
% 79.03/79.26        (And
% 79.03/79.26          (And
% 79.03/79.26            (And
% 79.03/79.26              (And
% 79.03/79.26                (And
% 79.03/79.26                  (And
% 79.03/79.26                    (And
% 79.03/79.26                      (And
% 79.03/79.26                        (And
% 79.03/79.26                          (And
% 79.03/79.26                            (And
% 79.03/79.26                              (And
% 79.03/79.26                                (And
% 79.03/79.26                                  (And
% 79.03/79.26                                    (And
% 79.03/79.26                                      (And
% 79.03/79.26                                        (And
% 79.03/79.26                                          (And
% 79.03/79.26                                            (And
% 79.03/79.26                                              (And
% 79.03/79.26                                                (And
% 79.03/79.26                                                  (And
% 79.03/79.26                                                    (And
% 79.03/79.26                                                      (And
% 79.03/79.26                                                        (And
% 79.03/79.26                                                          (And
% 79.03/79.26                                                            (And
% 79.03/79.26                                                              (And
% 79.03/79.26                                                                (And
% 79.03/79.26                                                                  (And
% 79.03/79.26                                                                    (And
% 79.03/79.26                                                                      (And
% 79.03/79.26                                                                        (And
% 79.03/79.26                                                                          (And
% 79.03/79.26                                                                            (And
% 79.03/79.26                                                                              (And
% 79.03/79.26                                                                                (And
% 79.03/79.26                                                                                  (And
% 79.03/79.26                                                                                    (And
% 79.03/79.26                                                                                      (And
% 79.03/79.26                                                                                        (And
% 79.03/79.26                                                                                          (And
% 79.03/79.26                                                                                            (And
% 79.03/79.26                                                                                              (And
% 79.03/79.26                                                                                                (And
% 79.03/79.26                                                                                                  (And
% 79.03/79.26                                                                                                    (And
% 79.03/79.26                                                                                                      (And
% 79.03/79.26                                                                                                        (And
% 79.03/79.26                                                                                                          (And
% 79.03/79.26                                                                                                            (And
% 79.03/79.26                                                                                                              (And
% 79.03/79.26                                                                                                                (And
% 79.03/79.26                                                                                                                  (And
% 79.03/79.26                                                                                                                    (And
% 79.03/79.26                                                                                                                      (And
% 79.03/79.26                                                                                                                        (Eq
% 79.03/79.26                                                                                                                          (h
% 79.03/79.26                                                                                                                            (op1
% 79.03/79.26                                                                                                                              e10
% 79.03/79.26                                                                                                                              e10))
% 79.03/79.26                                                                                                                          (op2
% 79.03/79.26                                                                                                                            (h
% 79.03/79.26                                                                                                                              e10)
% 79.03/79.26                                                                                                                            (h
% 79.03/79.26                                                                                                                              e10)))
% 79.03/79.26                                                                                                                        (Eq
% 79.03/79.26                                                                                                                          (h
% 79.03/79.26                                                                                                                            (op1
% 79.03/79.26                                                                                                                              e10
% 79.03/79.26                                                                                                                              e11))
% 79.03/79.26                                                                                                                          (op2
% 79.03/79.26                                                                                                                            (h
% 79.03/79.26                                                                                                                              e10)
% 79.03/79.26                                                                                                                            (h
% 79.03/79.26                                                                                                                              e11))))
% 79.03/79.26                                                                                                                      (Eq
% 79.03/79.26                                                                                                                        (h
% 79.03/79.26                                                                                                                          (op1
% 79.03/79.26                                                                                                                            e10
% 79.03/79.26                                                                                                                            e12))
% 79.03/79.26                                                                                                                        (op2
% 79.03/79.26                                                                                                                          (h
% 79.03/79.26                                                                                                                            e10)
% 79.03/79.26                                                                                                                          (h
% 79.03/79.26                                                                                                                            e12))))
% 79.03/79.26                                                                                                                    (Eq
% 79.03/79.26                                                                                                                      (h
% 79.03/79.26                                                                                                                        (op1
% 79.03/79.26                                                                                                                          e10
% 79.03/79.26                                                                                                                          e13))
% 79.03/79.26                                                                                                                      (op2
% 79.03/79.26                                                                                                                        (h
% 79.03/79.26                                                                                                                          e10)
% 79.03/79.26                                                                                                                        (h
% 79.03/79.26                                                                                                                          e13))))
% 79.03/79.26                                                                                                                  (Eq
% 79.03/79.26                                                                                                                    (h
% 79.03/79.26                                                                                                                      (op1
% 79.03/79.26                                                                                                                        e10
% 79.03/79.26                                                                                                                        e14))
% 79.03/79.26                                                                                                                    (op2
% 79.03/79.26                                                                                                                      (h
% 79.03/79.26                                                                                                                        e10)
% 79.03/79.26                                                                                                                      (h
% 79.03/79.26                                                                                                                        e14))))
% 79.03/79.26                                                                                                                (Eq
% 79.03/79.26                                                                                                                  (h
% 79.03/79.26                                                                                                                    (op1
% 79.03/79.26                                                                                                                      e11
% 79.03/79.26                                                                                                                      e10))
% 79.03/79.26                                                                                                                  (op2
% 79.03/79.26                                                                                                                    (h
% 79.03/79.26                                                                                                                      e11)
% 79.03/79.26                                                                                                                    (h
% 79.03/79.26                                                                                                                      e10))))
% 79.03/79.26                                                                                                              (Eq
% 79.03/79.26                                                                                                                (h
% 79.03/79.26                                                                                                                  (op1 e11
% 79.03/79.26                                                                                                                    e11))
% 79.03/79.26                                                                                                                (op2
% 79.03/79.26                                                                                                                  (h e11)
% 79.03/79.26                                                                                                                  (h
% 79.03/79.26                                                                                                                    e11))))
% 79.03/79.26                                                                                                            (Eq
% 79.03/79.26                                                                                                              (h
% 79.03/79.26                                                                                                                (op1 e11
% 79.03/79.26                                                                                                                  e12))
% 79.03/79.26                                                                                                              (op2 (h e11)
% 79.03/79.26                                                                                                                (h e12))))
% 79.03/79.26                                                                                                          (Eq
% 79.03/79.26                                                                                                            (h
% 79.03/79.26                                                                                                              (op1 e11
% 79.03/79.26                                                                                                                e13))
% 79.03/79.26                                                                                                            (op2 (h e11)
% 79.03/79.26                                                                                                              (h e13))))
% 79.03/79.26                                                                                                        (Eq
% 79.03/79.26                                                                                                          (h
% 79.03/79.26                                                                                                            (op1 e11 e14))
% 79.03/79.26                                                                                                          (op2 (h e11)
% 79.03/79.26                                                                                                            (h e14))))
% 79.03/79.26                                                                                                      (Eq
% 79.03/79.26                                                                                                        (h (op1 e12 e10))
% 79.03/79.26                                                                                                        (op2 (h e12)
% 79.03/79.26                                                                                                          (h e10))))
% 79.03/79.26                                                                                                    (Eq (h (op1 e12 e11))
% 79.03/79.26                                                                                                      (op2 (h e12)
% 79.03/79.26                                                                                                        (h e11))))
% 79.03/79.26                                                                                                  (Eq (h (op1 e12 e12))
% 79.03/79.26                                                                                                    (op2 (h e12)
% 79.03/79.26                                                                                                      (h e12))))
% 79.03/79.26                                                                                                (Eq (h (op1 e12 e13))
% 79.03/79.26                                                                                                  (op2 (h e12) (h e13))))
% 79.03/79.26                                                                                              (Eq (h (op1 e12 e14))
% 79.03/79.26                                                                                                (op2 (h e12) (h e14))))
% 79.03/79.26                                                                                            (Eq (h (op1 e13 e10))
% 79.03/79.26                                                                                              (op2 (h e13) (h e10))))
% 79.03/79.26                                                                                          (Eq (h (op1 e13 e11))
% 79.03/79.26                                                                                            (op2 (h e13) (h e11))))
% 79.03/79.26                                                                                        (Eq (h (op1 e13 e12))
% 79.03/79.26                                                                                          (op2 (h e13) (h e12))))
% 79.03/79.26                                                                                      (Eq (h (op1 e13 e13))
% 79.03/79.26                                                                                        (op2 (h e13) (h e13))))
% 79.03/79.26                                                                                    (Eq (h (op1 e13 e14))
% 79.03/79.26                                                                                      (op2 (h e13) (h e14))))
% 79.03/79.26                                                                                  (Eq (h (op1 e14 e10))
% 79.03/79.26                                                                                    (op2 (h e14) (h e10))))
% 79.03/79.26                                                                                (Eq (h (op1 e14 e11))
% 79.03/79.26                                                                                  (op2 (h e14) (h e11))))
% 79.03/79.26                                                                              (Eq (h (op1 e14 e12))
% 79.03/79.26                                                                                (op2 (h e14) (h e12))))
% 79.03/79.26                                                                            (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.03/79.26                                                                          (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.03/79.26                                                                        (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.03/79.26                                                                      (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.03/79.26                                                                    (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.03/79.26                                                                  (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.03/79.26                                                                (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.03/79.26                                                              (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.03/79.26                                                            (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.03/79.26                                                          (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.03/79.26                                                        (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.03/79.26                                                      (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.03/79.26                                                    (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.03/79.26                                                  (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.03/79.26                                                (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.03/79.26                                              (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.03/79.26                                            (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.03/79.26                                          (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.03/79.26                                        (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.03/79.26                                      (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.03/79.26                                    (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.03/79.26                                  (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.03/79.26                                (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.03/79.26                              (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.03/79.26                            (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.03/79.26                          (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.03/79.26                        (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.11/79.28                      (Eq (h (j e20)) e20))
% 79.11/79.28                    (Eq (h (j e21)) e21))
% 79.11/79.28                  (Eq (h (j e22)) e22))
% 79.11/79.28                (Eq (h (j e23)) e23))
% 79.11/79.28              (Eq (h (j e24)) e24))
% 79.11/79.28            (Eq (j (h e10)) e10))
% 79.11/79.28          (Eq (j (h e11)) e11))
% 79.11/79.28        (Eq (j (h e12)) e12))
% 79.11/79.28      (Eq (j (h e13)) e13))
% 79.11/79.28    True
% 79.11/79.28  Clause #149 (by clausification #[147]): Eq (j (h e14)) e14
% 79.11/79.28  Clause #185 (by clausification #[111]): Eq
% 79.11/79.28    (And
% 79.11/79.28      (And
% 79.11/79.28        (And
% 79.11/79.28          (And
% 79.11/79.28            (And
% 79.11/79.28              (And
% 79.11/79.28                (And
% 79.11/79.28                  (And
% 79.11/79.28                    (And
% 79.11/79.28                      (And
% 79.11/79.28                        (And
% 79.11/79.28                          (And
% 79.11/79.28                            (And
% 79.11/79.28                              (And
% 79.11/79.28                                (And
% 79.11/79.28                                  (And
% 79.11/79.28                                    (And
% 79.11/79.28                                      (And
% 79.11/79.28                                        (And
% 79.11/79.28                                          (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.11/79.28                                          (Eq (op1 e10 e13) e13))
% 79.11/79.28                                        (Eq (op1 e10 e14) e14))
% 79.11/79.28                                      (Eq (op1 e11 e10) e11))
% 79.11/79.28                                    (Eq (op1 e11 e11) e10))
% 79.11/79.28                                  (Eq (op1 e11 e12) e13))
% 79.11/79.28                                (Eq (op1 e11 e13) e14))
% 79.11/79.28                              (Eq (op1 e11 e14) e12))
% 79.11/79.28                            (Eq (op1 e12 e10) e12))
% 79.11/79.28                          (Eq (op1 e12 e11) e14))
% 79.11/79.28                        (Eq (op1 e12 e12) e10))
% 79.11/79.28                      (Eq (op1 e12 e13) e11))
% 79.11/79.28                    (Eq (op1 e12 e14) e13))
% 79.11/79.28                  (Eq (op1 e13 e10) e13))
% 79.11/79.28                (Eq (op1 e13 e11) e12))
% 79.11/79.28              (Eq (op1 e13 e12) e14))
% 79.11/79.28            (Eq (op1 e13 e13) e10))
% 79.11/79.28          (Eq (op1 e13 e14) e11))
% 79.11/79.28        (Eq (op1 e14 e10) e14))
% 79.11/79.28      (Eq (op1 e14 e11) e13))
% 79.11/79.28    True
% 79.11/79.28  Clause #188 (by clausification #[185]): Eq
% 79.11/79.28    (And
% 79.11/79.28      (And
% 79.11/79.28        (And
% 79.11/79.28          (And
% 79.11/79.28            (And
% 79.11/79.28              (And
% 79.11/79.28                (And
% 79.11/79.28                  (And
% 79.11/79.28                    (And
% 79.11/79.28                      (And
% 79.11/79.28                        (And
% 79.11/79.28                          (And
% 79.11/79.28                            (And
% 79.11/79.28                              (And
% 79.11/79.28                                (And
% 79.11/79.28                                  (And
% 79.11/79.28                                    (And
% 79.11/79.28                                      (And
% 79.11/79.28                                        (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.11/79.28                                        (Eq (op1 e10 e13) e13))
% 79.11/79.28                                      (Eq (op1 e10 e14) e14))
% 79.11/79.28                                    (Eq (op1 e11 e10) e11))
% 79.11/79.28                                  (Eq (op1 e11 e11) e10))
% 79.11/79.28                                (Eq (op1 e11 e12) e13))
% 79.11/79.28                              (Eq (op1 e11 e13) e14))
% 79.11/79.28                            (Eq (op1 e11 e14) e12))
% 79.11/79.28                          (Eq (op1 e12 e10) e12))
% 79.11/79.28                        (Eq (op1 e12 e11) e14))
% 79.11/79.28                      (Eq (op1 e12 e12) e10))
% 79.11/79.28                    (Eq (op1 e12 e13) e11))
% 79.11/79.28                  (Eq (op1 e12 e14) e13))
% 79.11/79.28                (Eq (op1 e13 e10) e13))
% 79.11/79.28              (Eq (op1 e13 e11) e12))
% 79.11/79.28            (Eq (op1 e13 e12) e14))
% 79.11/79.28          (Eq (op1 e13 e13) e10))
% 79.11/79.28        (Eq (op1 e13 e14) e11))
% 79.11/79.28      (Eq (op1 e14 e10) e14))
% 79.11/79.28    True
% 79.11/79.28  Clause #190 (by clausification #[188]): Eq (Eq (op1 e14 e10) e14) True
% 79.11/79.28  Clause #191 (by clausification #[188]): Eq
% 79.11/79.28    (And
% 79.11/79.28      (And
% 79.11/79.28        (And
% 79.11/79.28          (And
% 79.11/79.28            (And
% 79.11/79.28              (And
% 79.11/79.28                (And
% 79.11/79.28                  (And
% 79.11/79.28                    (And
% 79.11/79.28                      (And
% 79.11/79.28                        (And
% 79.11/79.28                          (And
% 79.11/79.28                            (And
% 79.11/79.28                              (And
% 79.11/79.28                                (And
% 79.11/79.28                                  (And
% 79.11/79.28                                    (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.11/79.28                                      (Eq (op1 e10 e13) e13))
% 79.11/79.28                                    (Eq (op1 e10 e14) e14))
% 79.11/79.28                                  (Eq (op1 e11 e10) e11))
% 79.13/79.29                                (Eq (op1 e11 e11) e10))
% 79.13/79.29                              (Eq (op1 e11 e12) e13))
% 79.13/79.29                            (Eq (op1 e11 e13) e14))
% 79.13/79.29                          (Eq (op1 e11 e14) e12))
% 79.13/79.29                        (Eq (op1 e12 e10) e12))
% 79.13/79.29                      (Eq (op1 e12 e11) e14))
% 79.13/79.29                    (Eq (op1 e12 e12) e10))
% 79.13/79.29                  (Eq (op1 e12 e13) e11))
% 79.13/79.29                (Eq (op1 e12 e14) e13))
% 79.13/79.29              (Eq (op1 e13 e10) e13))
% 79.13/79.29            (Eq (op1 e13 e11) e12))
% 79.13/79.29          (Eq (op1 e13 e12) e14))
% 79.13/79.29        (Eq (op1 e13 e13) e10))
% 79.13/79.29      (Eq (op1 e13 e14) e11))
% 79.13/79.29    True
% 79.13/79.29  Clause #192 (by clausification #[190]): Eq (op1 e14 e10) e14
% 79.13/79.29  Clause #194 (by clausification #[191]): Eq
% 79.13/79.29    (And
% 79.13/79.29      (And
% 79.13/79.29        (And
% 79.13/79.29          (And
% 79.13/79.29            (And
% 79.13/79.29              (And
% 79.13/79.29                (And
% 79.13/79.29                  (And
% 79.13/79.29                    (And
% 79.13/79.29                      (And
% 79.13/79.29                        (And
% 79.13/79.29                          (And
% 79.13/79.29                            (And
% 79.13/79.29                              (And
% 79.13/79.29                                (And
% 79.13/79.29                                  (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.13/79.29                                    (Eq (op1 e10 e13) e13))
% 79.13/79.29                                  (Eq (op1 e10 e14) e14))
% 79.13/79.29                                (Eq (op1 e11 e10) e11))
% 79.13/79.29                              (Eq (op1 e11 e11) e10))
% 79.13/79.29                            (Eq (op1 e11 e12) e13))
% 79.13/79.29                          (Eq (op1 e11 e13) e14))
% 79.13/79.29                        (Eq (op1 e11 e14) e12))
% 79.13/79.29                      (Eq (op1 e12 e10) e12))
% 79.13/79.29                    (Eq (op1 e12 e11) e14))
% 79.13/79.29                  (Eq (op1 e12 e12) e10))
% 79.13/79.29                (Eq (op1 e12 e13) e11))
% 79.13/79.29              (Eq (op1 e12 e14) e13))
% 79.13/79.29            (Eq (op1 e13 e10) e13))
% 79.13/79.29          (Eq (op1 e13 e11) e12))
% 79.13/79.29        (Eq (op1 e13 e12) e14))
% 79.13/79.29      (Eq (op1 e13 e13) e10))
% 79.13/79.29    True
% 79.13/79.29  Clause #196 (by clausification #[194]): Eq (Eq (op1 e13 e13) e10) True
% 79.13/79.29  Clause #197 (by clausification #[194]): Eq
% 79.13/79.29    (And
% 79.13/79.29      (And
% 79.13/79.29        (And
% 79.13/79.29          (And
% 79.13/79.29            (And
% 79.13/79.29              (And
% 79.13/79.29                (And
% 79.13/79.29                  (And
% 79.13/79.29                    (And
% 79.13/79.29                      (And
% 79.13/79.29                        (And
% 79.13/79.29                          (And
% 79.13/79.29                            (And
% 79.13/79.29                              (And
% 79.13/79.29                                (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.13/79.29                                  (Eq (op1 e10 e13) e13))
% 79.13/79.29                                (Eq (op1 e10 e14) e14))
% 79.13/79.29                              (Eq (op1 e11 e10) e11))
% 79.13/79.29                            (Eq (op1 e11 e11) e10))
% 79.13/79.29                          (Eq (op1 e11 e12) e13))
% 79.13/79.29                        (Eq (op1 e11 e13) e14))
% 79.13/79.29                      (Eq (op1 e11 e14) e12))
% 79.13/79.29                    (Eq (op1 e12 e10) e12))
% 79.13/79.29                  (Eq (op1 e12 e11) e14))
% 79.13/79.29                (Eq (op1 e12 e12) e10))
% 79.13/79.29              (Eq (op1 e12 e13) e11))
% 79.13/79.29            (Eq (op1 e12 e14) e13))
% 79.13/79.29          (Eq (op1 e13 e10) e13))
% 79.13/79.29        (Eq (op1 e13 e11) e12))
% 79.13/79.29      (Eq (op1 e13 e12) e14))
% 79.13/79.29    True
% 79.13/79.29  Clause #198 (by clausification #[196]): Eq (op1 e13 e13) e10
% 79.13/79.29  Clause #199 (by clausification #[129]): Eq (Eq (op2 e24 e22) e20) True
% 79.13/79.29  Clause #201 (by clausification #[199]): Eq (op2 e24 e22) e20
% 79.13/79.29  Clause #203 (by clausification #[197]): Eq
% 79.13/79.29    (And
% 79.13/79.29      (And
% 79.13/79.29        (And
% 79.13/79.29          (And
% 79.13/79.29            (And
% 79.13/79.29              (And
% 79.13/79.29                (And
% 79.13/79.29                  (And
% 79.13/79.29                    (And
% 79.13/79.29                      (And
% 79.13/79.29                        (And
% 79.13/79.29                          (And
% 79.13/79.29                            (And
% 79.13/79.29                              (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.13/79.29                                (Eq (op1 e10 e13) e13))
% 79.13/79.29                              (Eq (op1 e10 e14) e14))
% 79.13/79.29                            (Eq (op1 e11 e10) e11))
% 79.13/79.29                          (Eq (op1 e11 e11) e10))
% 79.13/79.29                        (Eq (op1 e11 e12) e13))
% 79.13/79.29                      (Eq (op1 e11 e13) e14))
% 79.13/79.29                    (Eq (op1 e11 e14) e12))
% 79.13/79.29                  (Eq (op1 e12 e10) e12))
% 79.13/79.29                (Eq (op1 e12 e11) e14))
% 79.13/79.29              (Eq (op1 e12 e12) e10))
% 79.13/79.29            (Eq (op1 e12 e13) e11))
% 79.13/79.29          (Eq (op1 e12 e14) e13))
% 79.17/79.34        (Eq (op1 e13 e10) e13))
% 79.17/79.34      (Eq (op1 e13 e11) e12))
% 79.17/79.34    True
% 79.17/79.34  Clause #206 (by clausification #[203]): Eq
% 79.17/79.34    (And
% 79.17/79.34      (And
% 79.17/79.34        (And
% 79.17/79.34          (And
% 79.17/79.34            (And
% 79.17/79.34              (And
% 79.17/79.34                (And
% 79.17/79.34                  (And
% 79.17/79.34                    (And
% 79.17/79.34                      (And
% 79.17/79.34                        (And
% 79.17/79.34                          (And
% 79.17/79.34                            (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.34                              (Eq (op1 e10 e13) e13))
% 79.17/79.34                            (Eq (op1 e10 e14) e14))
% 79.17/79.34                          (Eq (op1 e11 e10) e11))
% 79.17/79.34                        (Eq (op1 e11 e11) e10))
% 79.17/79.34                      (Eq (op1 e11 e12) e13))
% 79.17/79.34                    (Eq (op1 e11 e13) e14))
% 79.17/79.34                  (Eq (op1 e11 e14) e12))
% 79.17/79.34                (Eq (op1 e12 e10) e12))
% 79.17/79.34              (Eq (op1 e12 e11) e14))
% 79.17/79.34            (Eq (op1 e12 e12) e10))
% 79.17/79.34          (Eq (op1 e12 e13) e11))
% 79.17/79.34        (Eq (op1 e12 e14) e13))
% 79.17/79.34      (Eq (op1 e13 e10) e13))
% 79.17/79.34    True
% 79.17/79.34  Clause #208 (by clausification #[206]): Eq (Eq (op1 e13 e10) e13) True
% 79.17/79.34  Clause #209 (by clausification #[206]): Eq
% 79.17/79.34    (And
% 79.17/79.34      (And
% 79.17/79.34        (And
% 79.17/79.34          (And
% 79.17/79.34            (And
% 79.17/79.34              (And
% 79.17/79.34                (And
% 79.17/79.34                  (And
% 79.17/79.34                    (And
% 79.17/79.34                      (And
% 79.17/79.34                        (And
% 79.17/79.34                          (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.34                            (Eq (op1 e10 e13) e13))
% 79.17/79.34                          (Eq (op1 e10 e14) e14))
% 79.17/79.34                        (Eq (op1 e11 e10) e11))
% 79.17/79.34                      (Eq (op1 e11 e11) e10))
% 79.17/79.34                    (Eq (op1 e11 e12) e13))
% 79.17/79.34                  (Eq (op1 e11 e13) e14))
% 79.17/79.34                (Eq (op1 e11 e14) e12))
% 79.17/79.34              (Eq (op1 e12 e10) e12))
% 79.17/79.34            (Eq (op1 e12 e11) e14))
% 79.17/79.34          (Eq (op1 e12 e12) e10))
% 79.17/79.34        (Eq (op1 e12 e13) e11))
% 79.17/79.34      (Eq (op1 e12 e14) e13))
% 79.17/79.34    True
% 79.17/79.34  Clause #210 (by clausification #[208]): Eq (op1 e13 e10) e13
% 79.17/79.34  Clause #212 (by clausification #[209]): Eq
% 79.17/79.34    (And
% 79.17/79.34      (And
% 79.17/79.34        (And
% 79.17/79.34          (And
% 79.17/79.34            (And
% 79.17/79.34              (And
% 79.17/79.34                (And
% 79.17/79.34                  (And
% 79.17/79.34                    (And
% 79.17/79.34                      (And
% 79.17/79.34                        (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.34                          (Eq (op1 e10 e13) e13))
% 79.17/79.34                        (Eq (op1 e10 e14) e14))
% 79.17/79.34                      (Eq (op1 e11 e10) e11))
% 79.17/79.34                    (Eq (op1 e11 e11) e10))
% 79.17/79.34                  (Eq (op1 e11 e12) e13))
% 79.17/79.34                (Eq (op1 e11 e13) e14))
% 79.17/79.34              (Eq (op1 e11 e14) e12))
% 79.17/79.34            (Eq (op1 e12 e10) e12))
% 79.17/79.34          (Eq (op1 e12 e11) e14))
% 79.17/79.34        (Eq (op1 e12 e12) e10))
% 79.17/79.34      (Eq (op1 e12 e13) e11))
% 79.17/79.34    True
% 79.17/79.34  Clause #215 (by clausification #[212]): Eq
% 79.17/79.34    (And
% 79.17/79.34      (And
% 79.17/79.34        (And
% 79.17/79.34          (And
% 79.17/79.34            (And
% 79.17/79.34              (And
% 79.17/79.34                (And
% 79.17/79.34                  (And
% 79.17/79.34                    (And
% 79.17/79.34                      (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.34                        (Eq (op1 e10 e13) e13))
% 79.17/79.34                      (Eq (op1 e10 e14) e14))
% 79.17/79.34                    (Eq (op1 e11 e10) e11))
% 79.17/79.34                  (Eq (op1 e11 e11) e10))
% 79.17/79.34                (Eq (op1 e11 e12) e13))
% 79.17/79.34              (Eq (op1 e11 e13) e14))
% 79.17/79.34            (Eq (op1 e11 e14) e12))
% 79.17/79.34          (Eq (op1 e12 e10) e12))
% 79.17/79.34        (Eq (op1 e12 e11) e14))
% 79.17/79.34      (Eq (op1 e12 e12) e10))
% 79.17/79.34    True
% 79.17/79.34  Clause #217 (by clausification #[148]): Eq (Eq (j (h e13)) e13) True
% 79.17/79.34  Clause #218 (by clausification #[148]): Eq
% 79.17/79.34    (And
% 79.17/79.34      (And
% 79.17/79.34        (And
% 79.17/79.34          (And
% 79.17/79.34            (And
% 79.17/79.34              (And
% 79.17/79.34                (And
% 79.17/79.34                  (And
% 79.17/79.34                    (And
% 79.17/79.34                      (And
% 79.17/79.34                        (And
% 79.17/79.34                          (And
% 79.17/79.34                            (And
% 79.17/79.34                              (And
% 79.17/79.34                                (And
% 79.17/79.34                                  (And
% 79.17/79.34                                    (And
% 79.17/79.34                                      (And
% 79.17/79.34                                        (And
% 79.17/79.34                                          (And
% 79.17/79.34                                            (And
% 79.17/79.34                                              (And
% 79.17/79.34                                                (And
% 79.17/79.34                                                  (And
% 79.17/79.34                                                    (And
% 79.17/79.34                                                      (And
% 79.17/79.34                                                        (And
% 79.17/79.34                                                          (And
% 79.17/79.34                                                            (And
% 79.17/79.34                                                              (And
% 79.17/79.34                                                                (And
% 79.17/79.34                                                                  (And
% 79.17/79.34                                                                    (And
% 79.17/79.34                                                                      (And
% 79.17/79.34                                                                        (And
% 79.17/79.34                                                                          (And
% 79.17/79.34                                                                            (And
% 79.17/79.34                                                                              (And
% 79.17/79.34                                                                                (And
% 79.17/79.34                                                                                  (And
% 79.17/79.34                                                                                    (And
% 79.17/79.34                                                                                      (And
% 79.17/79.34                                                                                        (And
% 79.17/79.34                                                                                          (And
% 79.17/79.34                                                                                            (And
% 79.17/79.34                                                                                              (And
% 79.17/79.34                                                                                                (And
% 79.17/79.34                                                                                                  (And
% 79.17/79.34                                                                                                    (And
% 79.17/79.34                                                                                                      (And
% 79.17/79.34                                                                                                        (And
% 79.17/79.34                                                                                                          (And
% 79.17/79.34                                                                                                            (And
% 79.17/79.34                                                                                                              (And
% 79.17/79.34                                                                                                                (And
% 79.17/79.34                                                                                                                  (And
% 79.17/79.34                                                                                                                    (And
% 79.17/79.34                                                                                                                      (Eq
% 79.17/79.34                                                                                                                        (h
% 79.17/79.34                                                                                                                          (op1
% 79.17/79.34                                                                                                                            e10
% 79.17/79.34                                                                                                                            e10))
% 79.17/79.34                                                                                                                        (op2
% 79.17/79.34                                                                                                                          (h
% 79.17/79.34                                                                                                                            e10)
% 79.17/79.34                                                                                                                          (h
% 79.17/79.34                                                                                                                            e10)))
% 79.17/79.34                                                                                                                      (Eq
% 79.17/79.34                                                                                                                        (h
% 79.17/79.34                                                                                                                          (op1
% 79.17/79.34                                                                                                                            e10
% 79.17/79.34                                                                                                                            e11))
% 79.17/79.34                                                                                                                        (op2
% 79.17/79.34                                                                                                                          (h
% 79.17/79.34                                                                                                                            e10)
% 79.17/79.34                                                                                                                          (h
% 79.17/79.34                                                                                                                            e11))))
% 79.17/79.34                                                                                                                    (Eq
% 79.17/79.34                                                                                                                      (h
% 79.17/79.34                                                                                                                        (op1
% 79.17/79.34                                                                                                                          e10
% 79.17/79.34                                                                                                                          e12))
% 79.17/79.34                                                                                                                      (op2
% 79.17/79.34                                                                                                                        (h
% 79.17/79.34                                                                                                                          e10)
% 79.17/79.34                                                                                                                        (h
% 79.17/79.34                                                                                                                          e12))))
% 79.17/79.34                                                                                                                  (Eq
% 79.17/79.34                                                                                                                    (h
% 79.17/79.34                                                                                                                      (op1
% 79.17/79.34                                                                                                                        e10
% 79.17/79.34                                                                                                                        e13))
% 79.17/79.34                                                                                                                    (op2
% 79.17/79.34                                                                                                                      (h
% 79.17/79.34                                                                                                                        e10)
% 79.17/79.34                                                                                                                      (h
% 79.17/79.34                                                                                                                        e13))))
% 79.17/79.34                                                                                                                (Eq
% 79.17/79.34                                                                                                                  (h
% 79.17/79.34                                                                                                                    (op1
% 79.17/79.34                                                                                                                      e10
% 79.17/79.34                                                                                                                      e14))
% 79.17/79.34                                                                                                                  (op2
% 79.17/79.34                                                                                                                    (h
% 79.17/79.34                                                                                                                      e10)
% 79.17/79.34                                                                                                                    (h
% 79.17/79.34                                                                                                                      e14))))
% 79.17/79.34                                                                                                              (Eq
% 79.17/79.34                                                                                                                (h
% 79.17/79.34                                                                                                                  (op1 e11
% 79.17/79.34                                                                                                                    e10))
% 79.17/79.34                                                                                                                (op2
% 79.17/79.34                                                                                                                  (h e11)
% 79.17/79.34                                                                                                                  (h
% 79.17/79.34                                                                                                                    e10))))
% 79.17/79.34                                                                                                            (Eq
% 79.17/79.34                                                                                                              (h
% 79.17/79.34                                                                                                                (op1 e11
% 79.17/79.34                                                                                                                  e11))
% 79.17/79.34                                                                                                              (op2 (h e11)
% 79.17/79.34                                                                                                                (h e11))))
% 79.17/79.34                                                                                                          (Eq
% 79.17/79.34                                                                                                            (h
% 79.17/79.34                                                                                                              (op1 e11
% 79.17/79.34                                                                                                                e12))
% 79.17/79.34                                                                                                            (op2 (h e11)
% 79.17/79.34                                                                                                              (h e12))))
% 79.17/79.34                                                                                                        (Eq
% 79.17/79.34                                                                                                          (h
% 79.17/79.34                                                                                                            (op1 e11 e13))
% 79.17/79.34                                                                                                          (op2 (h e11)
% 79.17/79.34                                                                                                            (h e13))))
% 79.17/79.34                                                                                                      (Eq
% 79.17/79.34                                                                                                        (h (op1 e11 e14))
% 79.17/79.34                                                                                                        (op2 (h e11)
% 79.17/79.34                                                                                                          (h e14))))
% 79.17/79.34                                                                                                    (Eq (h (op1 e12 e10))
% 79.17/79.34                                                                                                      (op2 (h e12)
% 79.17/79.34                                                                                                        (h e10))))
% 79.17/79.34                                                                                                  (Eq (h (op1 e12 e11))
% 79.17/79.34                                                                                                    (op2 (h e12)
% 79.17/79.34                                                                                                      (h e11))))
% 79.17/79.34                                                                                                (Eq (h (op1 e12 e12))
% 79.17/79.34                                                                                                  (op2 (h e12) (h e12))))
% 79.17/79.34                                                                                              (Eq (h (op1 e12 e13))
% 79.17/79.34                                                                                                (op2 (h e12) (h e13))))
% 79.17/79.34                                                                                            (Eq (h (op1 e12 e14))
% 79.17/79.34                                                                                              (op2 (h e12) (h e14))))
% 79.17/79.34                                                                                          (Eq (h (op1 e13 e10))
% 79.17/79.34                                                                                            (op2 (h e13) (h e10))))
% 79.17/79.34                                                                                        (Eq (h (op1 e13 e11))
% 79.17/79.34                                                                                          (op2 (h e13) (h e11))))
% 79.17/79.34                                                                                      (Eq (h (op1 e13 e12))
% 79.17/79.34                                                                                        (op2 (h e13) (h e12))))
% 79.17/79.34                                                                                    (Eq (h (op1 e13 e13))
% 79.17/79.34                                                                                      (op2 (h e13) (h e13))))
% 79.17/79.34                                                                                  (Eq (h (op1 e13 e14))
% 79.17/79.34                                                                                    (op2 (h e13) (h e14))))
% 79.17/79.34                                                                                (Eq (h (op1 e14 e10))
% 79.17/79.34                                                                                  (op2 (h e14) (h e10))))
% 79.17/79.34                                                                              (Eq (h (op1 e14 e11))
% 79.17/79.34                                                                                (op2 (h e14) (h e11))))
% 79.17/79.34                                                                            (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.17/79.34                                                                          (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.17/79.34                                                                        (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.17/79.34                                                                      (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.17/79.34                                                                    (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.17/79.34                                                                  (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.17/79.34                                                                (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.17/79.34                                                              (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.17/79.34                                                            (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.17/79.34                                                          (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.17/79.34                                                        (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.17/79.35                                                      (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.17/79.35                                                    (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.17/79.35                                                  (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.17/79.35                                                (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.17/79.35                                              (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.17/79.35                                            (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.17/79.35                                          (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.17/79.35                                        (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.17/79.35                                      (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.17/79.35                                    (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.17/79.35                                  (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.17/79.35                                (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.17/79.35                              (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.17/79.35                            (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.17/79.35                          (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.17/79.35                        (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.17/79.35                      (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.17/79.35                    (Eq (h (j e20)) e20))
% 79.17/79.35                  (Eq (h (j e21)) e21))
% 79.17/79.35                (Eq (h (j e22)) e22))
% 79.17/79.35              (Eq (h (j e23)) e23))
% 79.17/79.35            (Eq (h (j e24)) e24))
% 79.17/79.35          (Eq (j (h e10)) e10))
% 79.17/79.35        (Eq (j (h e11)) e11))
% 79.17/79.35      (Eq (j (h e12)) e12))
% 79.17/79.35    True
% 79.17/79.35  Clause #219 (by clausification #[217]): Eq (j (h e13)) e13
% 79.17/79.35  Clause #220 (by clausification #[215]): Eq (Eq (op1 e12 e12) e10) True
% 79.17/79.35  Clause #221 (by clausification #[215]): Eq
% 79.17/79.35    (And
% 79.17/79.35      (And
% 79.17/79.35        (And
% 79.17/79.35          (And
% 79.17/79.35            (And
% 79.17/79.35              (And
% 79.17/79.35                (And
% 79.17/79.35                  (And
% 79.17/79.35                    (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.35                      (Eq (op1 e10 e13) e13))
% 79.17/79.35                    (Eq (op1 e10 e14) e14))
% 79.17/79.35                  (Eq (op1 e11 e10) e11))
% 79.17/79.35                (Eq (op1 e11 e11) e10))
% 79.17/79.35              (Eq (op1 e11 e12) e13))
% 79.17/79.35            (Eq (op1 e11 e13) e14))
% 79.17/79.35          (Eq (op1 e11 e14) e12))
% 79.17/79.35        (Eq (op1 e12 e10) e12))
% 79.17/79.35      (Eq (op1 e12 e11) e14))
% 79.17/79.35    True
% 79.17/79.35  Clause #222 (by clausification #[220]): Eq (op1 e12 e12) e10
% 79.17/79.35  Clause #224 (by clausification #[221]): Eq
% 79.17/79.35    (And
% 79.17/79.35      (And
% 79.17/79.35        (And
% 79.17/79.35          (And
% 79.17/79.35            (And
% 79.17/79.35              (And
% 79.17/79.35                (And
% 79.17/79.35                  (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.35                    (Eq (op1 e10 e13) e13))
% 79.17/79.35                  (Eq (op1 e10 e14) e14))
% 79.17/79.35                (Eq (op1 e11 e10) e11))
% 79.17/79.35              (Eq (op1 e11 e11) e10))
% 79.17/79.35            (Eq (op1 e11 e12) e13))
% 79.17/79.35          (Eq (op1 e11 e13) e14))
% 79.17/79.35        (Eq (op1 e11 e14) e12))
% 79.17/79.35      (Eq (op1 e12 e10) e12))
% 79.17/79.35    True
% 79.17/79.35  Clause #226 (by clausification #[224]): Eq (Eq (op1 e12 e10) e12) True
% 79.17/79.35  Clause #227 (by clausification #[224]): Eq
% 79.17/79.35    (And
% 79.17/79.35      (And
% 79.17/79.35        (And
% 79.17/79.35          (And
% 79.17/79.35            (And
% 79.17/79.35              (And
% 79.17/79.35                (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.35                  (Eq (op1 e10 e13) e13))
% 79.17/79.35                (Eq (op1 e10 e14) e14))
% 79.17/79.35              (Eq (op1 e11 e10) e11))
% 79.17/79.35            (Eq (op1 e11 e11) e10))
% 79.17/79.35          (Eq (op1 e11 e12) e13))
% 79.17/79.35        (Eq (op1 e11 e13) e14))
% 79.17/79.35      (Eq (op1 e11 e14) e12))
% 79.17/79.35    True
% 79.17/79.35  Clause #228 (by clausification #[226]): Eq (op1 e12 e10) e12
% 79.17/79.35  Clause #230 (by clausification #[227]): Eq
% 79.17/79.35    (And
% 79.17/79.35      (And
% 79.17/79.35        (And
% 79.17/79.35          (And
% 79.17/79.35            (And
% 79.17/79.35              (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12))
% 79.17/79.35                (Eq (op1 e10 e13) e13))
% 79.17/79.35              (Eq (op1 e10 e14) e14))
% 79.17/79.35            (Eq (op1 e11 e10) e11))
% 79.17/79.35          (Eq (op1 e11 e11) e10))
% 79.17/79.35        (Eq (op1 e11 e12) e13))
% 79.17/79.35      (Eq (op1 e11 e13) e14))
% 79.17/79.35    True
% 79.17/79.35  Clause #233 (by clausification #[230]): Eq
% 79.17/79.35    (And
% 79.17/79.35      (And
% 79.17/79.35        (And
% 79.17/79.39          (And
% 79.17/79.39            (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) (Eq (op1 e10 e13) e13))
% 79.17/79.39            (Eq (op1 e10 e14) e14))
% 79.17/79.39          (Eq (op1 e11 e10) e11))
% 79.17/79.39        (Eq (op1 e11 e11) e10))
% 79.17/79.39      (Eq (op1 e11 e12) e13))
% 79.17/79.39    True
% 79.17/79.39  Clause #251 (by clausification #[233]): Eq
% 79.17/79.39    (And
% 79.17/79.39      (And
% 79.17/79.39        (And (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) (Eq (op1 e10 e13) e13))
% 79.17/79.39          (Eq (op1 e10 e14) e14))
% 79.17/79.39        (Eq (op1 e11 e10) e11))
% 79.17/79.39      (Eq (op1 e11 e11) e10))
% 79.17/79.39    True
% 79.17/79.39  Clause #256 (by clausification #[251]): Eq (Eq (op1 e11 e11) e10) True
% 79.17/79.39  Clause #257 (by clausification #[251]): Eq
% 79.17/79.39    (And
% 79.17/79.39      (And (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) (Eq (op1 e10 e13) e13))
% 79.17/79.39        (Eq (op1 e10 e14) e14))
% 79.17/79.39      (Eq (op1 e11 e10) e11))
% 79.17/79.39    True
% 79.17/79.39  Clause #258 (by clausification #[256]): Eq (op1 e11 e11) e10
% 79.17/79.39  Clause #259 (by clausification #[257]): Eq (Eq (op1 e11 e10) e11) True
% 79.17/79.39  Clause #260 (by clausification #[257]): Eq
% 79.17/79.39    (And (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) (Eq (op1 e10 e13) e13))
% 79.17/79.39      (Eq (op1 e10 e14) e14))
% 79.17/79.39    True
% 79.17/79.39  Clause #261 (by clausification #[259]): Eq (op1 e11 e10) e11
% 79.17/79.39  Clause #263 (by clausification #[260]): Eq (And (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) (Eq (op1 e10 e13) e13)) True
% 79.17/79.39  Clause #266 (by clausification #[263]): Eq (And (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) (Eq (op1 e10 e12) e12)) True
% 79.17/79.39  Clause #269 (by clausification #[266]): Eq (And (Eq (op1 e10 e10) e10) (Eq (op1 e10 e11) e11)) True
% 79.17/79.39  Clause #271 (by clausification #[218]): Eq (Eq (j (h e12)) e12) True
% 79.17/79.39  Clause #272 (by clausification #[218]): Eq
% 79.17/79.39    (And
% 79.17/79.39      (And
% 79.17/79.39        (And
% 79.17/79.39          (And
% 79.17/79.39            (And
% 79.17/79.39              (And
% 79.17/79.39                (And
% 79.17/79.39                  (And
% 79.17/79.39                    (And
% 79.17/79.39                      (And
% 79.17/79.39                        (And
% 79.17/79.39                          (And
% 79.17/79.39                            (And
% 79.17/79.39                              (And
% 79.17/79.39                                (And
% 79.17/79.39                                  (And
% 79.17/79.39                                    (And
% 79.17/79.39                                      (And
% 79.17/79.39                                        (And
% 79.17/79.39                                          (And
% 79.17/79.39                                            (And
% 79.17/79.39                                              (And
% 79.17/79.39                                                (And
% 79.17/79.39                                                  (And
% 79.17/79.39                                                    (And
% 79.17/79.39                                                      (And
% 79.17/79.39                                                        (And
% 79.17/79.39                                                          (And
% 79.17/79.39                                                            (And
% 79.17/79.39                                                              (And
% 79.17/79.39                                                                (And
% 79.17/79.39                                                                  (And
% 79.17/79.39                                                                    (And
% 79.17/79.39                                                                      (And
% 79.17/79.39                                                                        (And
% 79.17/79.39                                                                          (And
% 79.17/79.39                                                                            (And
% 79.17/79.39                                                                              (And
% 79.17/79.39                                                                                (And
% 79.17/79.39                                                                                  (And
% 79.17/79.39                                                                                    (And
% 79.17/79.39                                                                                      (And
% 79.17/79.39                                                                                        (And
% 79.17/79.39                                                                                          (And
% 79.17/79.39                                                                                            (And
% 79.17/79.39                                                                                              (And
% 79.17/79.39                                                                                                (And
% 79.17/79.39                                                                                                  (And
% 79.17/79.39                                                                                                    (And
% 79.17/79.39                                                                                                      (And
% 79.17/79.39                                                                                                        (And
% 79.17/79.39                                                                                                          (And
% 79.17/79.39                                                                                                            (And
% 79.17/79.39                                                                                                              (And
% 79.17/79.39                                                                                                                (And
% 79.17/79.39                                                                                                                  (And
% 79.17/79.39                                                                                                                    (Eq
% 79.17/79.39                                                                                                                      (h
% 79.17/79.39                                                                                                                        (op1
% 79.17/79.39                                                                                                                          e10
% 79.17/79.39                                                                                                                          e10))
% 79.17/79.39                                                                                                                      (op2
% 79.17/79.39                                                                                                                        (h
% 79.17/79.39                                                                                                                          e10)
% 79.17/79.39                                                                                                                        (h
% 79.17/79.39                                                                                                                          e10)))
% 79.17/79.39                                                                                                                    (Eq
% 79.17/79.39                                                                                                                      (h
% 79.17/79.39                                                                                                                        (op1
% 79.17/79.39                                                                                                                          e10
% 79.17/79.39                                                                                                                          e11))
% 79.17/79.39                                                                                                                      (op2
% 79.17/79.39                                                                                                                        (h
% 79.17/79.39                                                                                                                          e10)
% 79.17/79.39                                                                                                                        (h
% 79.17/79.39                                                                                                                          e11))))
% 79.17/79.39                                                                                                                  (Eq
% 79.17/79.39                                                                                                                    (h
% 79.17/79.39                                                                                                                      (op1
% 79.17/79.39                                                                                                                        e10
% 79.17/79.39                                                                                                                        e12))
% 79.17/79.39                                                                                                                    (op2
% 79.17/79.39                                                                                                                      (h
% 79.17/79.39                                                                                                                        e10)
% 79.17/79.39                                                                                                                      (h
% 79.17/79.39                                                                                                                        e12))))
% 79.17/79.39                                                                                                                (Eq
% 79.17/79.39                                                                                                                  (h
% 79.17/79.39                                                                                                                    (op1
% 79.17/79.39                                                                                                                      e10
% 79.17/79.39                                                                                                                      e13))
% 79.17/79.39                                                                                                                  (op2
% 79.17/79.39                                                                                                                    (h
% 79.17/79.39                                                                                                                      e10)
% 79.17/79.39                                                                                                                    (h
% 79.17/79.39                                                                                                                      e13))))
% 79.17/79.39                                                                                                              (Eq
% 79.17/79.39                                                                                                                (h
% 79.17/79.39                                                                                                                  (op1 e10
% 79.17/79.39                                                                                                                    e14))
% 79.17/79.39                                                                                                                (op2
% 79.17/79.39                                                                                                                  (h e10)
% 79.17/79.39                                                                                                                  (h
% 79.17/79.39                                                                                                                    e14))))
% 79.17/79.39                                                                                                            (Eq
% 79.17/79.39                                                                                                              (h
% 79.17/79.39                                                                                                                (op1 e11
% 79.17/79.39                                                                                                                  e10))
% 79.17/79.39                                                                                                              (op2 (h e11)
% 79.17/79.39                                                                                                                (h e10))))
% 79.17/79.39                                                                                                          (Eq
% 79.17/79.39                                                                                                            (h
% 79.17/79.39                                                                                                              (op1 e11
% 79.17/79.39                                                                                                                e11))
% 79.17/79.39                                                                                                            (op2 (h e11)
% 79.17/79.39                                                                                                              (h e11))))
% 79.17/79.39                                                                                                        (Eq
% 79.17/79.39                                                                                                          (h
% 79.17/79.39                                                                                                            (op1 e11 e12))
% 79.17/79.39                                                                                                          (op2 (h e11)
% 79.17/79.39                                                                                                            (h e12))))
% 79.17/79.39                                                                                                      (Eq
% 79.17/79.39                                                                                                        (h (op1 e11 e13))
% 79.17/79.39                                                                                                        (op2 (h e11)
% 79.17/79.39                                                                                                          (h e13))))
% 79.17/79.39                                                                                                    (Eq (h (op1 e11 e14))
% 79.17/79.39                                                                                                      (op2 (h e11)
% 79.17/79.39                                                                                                        (h e14))))
% 79.17/79.39                                                                                                  (Eq (h (op1 e12 e10))
% 79.17/79.39                                                                                                    (op2 (h e12)
% 79.17/79.39                                                                                                      (h e10))))
% 79.17/79.39                                                                                                (Eq (h (op1 e12 e11))
% 79.17/79.39                                                                                                  (op2 (h e12) (h e11))))
% 79.17/79.39                                                                                              (Eq (h (op1 e12 e12))
% 79.17/79.39                                                                                                (op2 (h e12) (h e12))))
% 79.17/79.39                                                                                            (Eq (h (op1 e12 e13))
% 79.17/79.39                                                                                              (op2 (h e12) (h e13))))
% 79.17/79.39                                                                                          (Eq (h (op1 e12 e14))
% 79.17/79.39                                                                                            (op2 (h e12) (h e14))))
% 79.17/79.39                                                                                        (Eq (h (op1 e13 e10))
% 79.17/79.39                                                                                          (op2 (h e13) (h e10))))
% 79.17/79.39                                                                                      (Eq (h (op1 e13 e11))
% 79.17/79.39                                                                                        (op2 (h e13) (h e11))))
% 79.17/79.39                                                                                    (Eq (h (op1 e13 e12))
% 79.17/79.39                                                                                      (op2 (h e13) (h e12))))
% 79.17/79.39                                                                                  (Eq (h (op1 e13 e13))
% 79.17/79.39                                                                                    (op2 (h e13) (h e13))))
% 79.17/79.39                                                                                (Eq (h (op1 e13 e14))
% 79.17/79.39                                                                                  (op2 (h e13) (h e14))))
% 79.17/79.39                                                                              (Eq (h (op1 e14 e10))
% 79.17/79.39                                                                                (op2 (h e14) (h e10))))
% 79.17/79.39                                                                            (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.17/79.39                                                                          (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.25/79.42                                                                        (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.25/79.42                                                                      (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.25/79.42                                                                    (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.25/79.42                                                                  (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.25/79.42                                                                (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.25/79.42                                                              (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.25/79.42                                                            (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.25/79.42                                                          (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.25/79.42                                                        (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.25/79.42                                                      (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.25/79.42                                                    (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.25/79.42                                                  (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.25/79.42                                                (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.25/79.42                                              (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.25/79.42                                            (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.25/79.42                                          (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.25/79.42                                        (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.25/79.42                                      (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.25/79.42                                    (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.25/79.42                                  (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.25/79.42                                (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.25/79.42                              (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.25/79.42                            (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.25/79.42                          (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.25/79.42                        (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.25/79.42                      (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.25/79.42                    (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.25/79.42                  (Eq (h (j e20)) e20))
% 79.25/79.42                (Eq (h (j e21)) e21))
% 79.25/79.42              (Eq (h (j e22)) e22))
% 79.25/79.42            (Eq (h (j e23)) e23))
% 79.25/79.42          (Eq (h (j e24)) e24))
% 79.25/79.42        (Eq (j (h e10)) e10))
% 79.25/79.42      (Eq (j (h e11)) e11))
% 79.25/79.42    True
% 79.25/79.42  Clause #273 (by clausification #[271]): Eq (j (h e12)) e12
% 79.25/79.42  Clause #275 (by clausification #[269]): Eq (Eq (op1 e10 e10) e10) True
% 79.25/79.42  Clause #277 (by clausification #[275]): Eq (op1 e10 e10) e10
% 79.25/79.42  Clause #305 (by clausification #[272]): Eq (Eq (j (h e11)) e11) True
% 79.25/79.42  Clause #306 (by clausification #[272]): Eq
% 79.25/79.42    (And
% 79.25/79.42      (And
% 79.25/79.42        (And
% 79.25/79.42          (And
% 79.25/79.42            (And
% 79.25/79.42              (And
% 79.25/79.42                (And
% 79.25/79.42                  (And
% 79.25/79.42                    (And
% 79.25/79.42                      (And
% 79.25/79.42                        (And
% 79.25/79.42                          (And
% 79.25/79.42                            (And
% 79.25/79.42                              (And
% 79.25/79.42                                (And
% 79.25/79.42                                  (And
% 79.25/79.42                                    (And
% 79.25/79.42                                      (And
% 79.25/79.42                                        (And
% 79.25/79.42                                          (And
% 79.25/79.42                                            (And
% 79.25/79.42                                              (And
% 79.25/79.42                                                (And
% 79.25/79.42                                                  (And
% 79.25/79.42                                                    (And
% 79.25/79.42                                                      (And
% 79.25/79.42                                                        (And
% 79.25/79.42                                                          (And
% 79.25/79.42                                                            (And
% 79.25/79.42                                                              (And
% 79.25/79.42                                                                (And
% 79.25/79.42                                                                  (And
% 79.25/79.42                                                                    (And
% 79.25/79.42                                                                      (And
% 79.25/79.42                                                                        (And
% 79.25/79.42                                                                          (And
% 79.25/79.42                                                                            (And
% 79.25/79.42                                                                              (And
% 79.25/79.42                                                                                (And
% 79.25/79.42                                                                                  (And
% 79.25/79.42                                                                                    (And
% 79.25/79.42                                                                                      (And
% 79.25/79.42                                                                                        (And
% 79.25/79.42                                                                                          (And
% 79.25/79.42                                                                                            (And
% 79.25/79.42                                                                                              (And
% 79.25/79.42                                                                                                (And
% 79.25/79.42                                                                                                  (And
% 79.25/79.42                                                                                                    (And
% 79.25/79.42                                                                                                      (And
% 79.25/79.42                                                                                                        (And
% 79.25/79.42                                                                                                          (And
% 79.25/79.42                                                                                                            (And
% 79.25/79.42                                                                                                              (And
% 79.25/79.42                                                                                                                (And
% 79.25/79.42                                                                                                                  (Eq
% 79.25/79.42                                                                                                                    (h
% 79.25/79.42                                                                                                                      (op1
% 79.25/79.42                                                                                                                        e10
% 79.25/79.42                                                                                                                        e10))
% 79.25/79.42                                                                                                                    (op2
% 79.25/79.42                                                                                                                      (h
% 79.25/79.42                                                                                                                        e10)
% 79.25/79.42                                                                                                                      (h
% 79.25/79.42                                                                                                                        e10)))
% 79.25/79.42                                                                                                                  (Eq
% 79.25/79.42                                                                                                                    (h
% 79.25/79.42                                                                                                                      (op1
% 79.25/79.42                                                                                                                        e10
% 79.25/79.42                                                                                                                        e11))
% 79.25/79.42                                                                                                                    (op2
% 79.25/79.42                                                                                                                      (h
% 79.25/79.42                                                                                                                        e10)
% 79.25/79.42                                                                                                                      (h
% 79.25/79.42                                                                                                                        e11))))
% 79.25/79.42                                                                                                                (Eq
% 79.25/79.42                                                                                                                  (h
% 79.25/79.42                                                                                                                    (op1
% 79.25/79.42                                                                                                                      e10
% 79.25/79.42                                                                                                                      e12))
% 79.25/79.42                                                                                                                  (op2
% 79.25/79.42                                                                                                                    (h
% 79.25/79.42                                                                                                                      e10)
% 79.25/79.42                                                                                                                    (h
% 79.25/79.42                                                                                                                      e12))))
% 79.25/79.42                                                                                                              (Eq
% 79.25/79.42                                                                                                                (h
% 79.25/79.42                                                                                                                  (op1 e10
% 79.25/79.42                                                                                                                    e13))
% 79.25/79.42                                                                                                                (op2
% 79.25/79.42                                                                                                                  (h e10)
% 79.25/79.42                                                                                                                  (h
% 79.25/79.42                                                                                                                    e13))))
% 79.25/79.42                                                                                                            (Eq
% 79.25/79.42                                                                                                              (h
% 79.25/79.42                                                                                                                (op1 e10
% 79.25/79.42                                                                                                                  e14))
% 79.25/79.42                                                                                                              (op2 (h e10)
% 79.25/79.42                                                                                                                (h e14))))
% 79.25/79.42                                                                                                          (Eq
% 79.25/79.42                                                                                                            (h
% 79.25/79.42                                                                                                              (op1 e11
% 79.25/79.42                                                                                                                e10))
% 79.25/79.42                                                                                                            (op2 (h e11)
% 79.25/79.42                                                                                                              (h e10))))
% 79.25/79.42                                                                                                        (Eq
% 79.25/79.42                                                                                                          (h
% 79.25/79.42                                                                                                            (op1 e11 e11))
% 79.25/79.42                                                                                                          (op2 (h e11)
% 79.25/79.42                                                                                                            (h e11))))
% 79.25/79.42                                                                                                      (Eq
% 79.25/79.42                                                                                                        (h (op1 e11 e12))
% 79.25/79.42                                                                                                        (op2 (h e11)
% 79.25/79.42                                                                                                          (h e12))))
% 79.25/79.42                                                                                                    (Eq (h (op1 e11 e13))
% 79.25/79.42                                                                                                      (op2 (h e11)
% 79.25/79.42                                                                                                        (h e13))))
% 79.25/79.42                                                                                                  (Eq (h (op1 e11 e14))
% 79.25/79.42                                                                                                    (op2 (h e11)
% 79.25/79.42                                                                                                      (h e14))))
% 79.25/79.42                                                                                                (Eq (h (op1 e12 e10))
% 79.25/79.42                                                                                                  (op2 (h e12) (h e10))))
% 79.25/79.42                                                                                              (Eq (h (op1 e12 e11))
% 79.25/79.42                                                                                                (op2 (h e12) (h e11))))
% 79.25/79.42                                                                                            (Eq (h (op1 e12 e12))
% 79.25/79.42                                                                                              (op2 (h e12) (h e12))))
% 79.25/79.42                                                                                          (Eq (h (op1 e12 e13))
% 79.25/79.42                                                                                            (op2 (h e12) (h e13))))
% 79.25/79.42                                                                                        (Eq (h (op1 e12 e14))
% 79.25/79.42                                                                                          (op2 (h e12) (h e14))))
% 79.25/79.42                                                                                      (Eq (h (op1 e13 e10))
% 79.25/79.42                                                                                        (op2 (h e13) (h e10))))
% 79.25/79.42                                                                                    (Eq (h (op1 e13 e11))
% 79.25/79.42                                                                                      (op2 (h e13) (h e11))))
% 79.25/79.42                                                                                  (Eq (h (op1 e13 e12))
% 79.25/79.42                                                                                    (op2 (h e13) (h e12))))
% 79.25/79.42                                                                                (Eq (h (op1 e13 e13))
% 79.25/79.42                                                                                  (op2 (h e13) (h e13))))
% 79.25/79.42                                                                              (Eq (h (op1 e13 e14))
% 79.25/79.42                                                                                (op2 (h e13) (h e14))))
% 79.25/79.42                                                                            (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.25/79.42                                                                          (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.25/79.44                                                                        (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.25/79.44                                                                      (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.25/79.44                                                                    (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.25/79.44                                                                  (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.25/79.44                                                                (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.25/79.44                                                              (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.25/79.44                                                            (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.25/79.44                                                          (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.25/79.44                                                        (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.25/79.44                                                      (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.25/79.44                                                    (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.25/79.44                                                  (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.25/79.44                                                (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.25/79.44                                              (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.25/79.44                                            (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.25/79.44                                          (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.25/79.44                                        (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.25/79.44                                      (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.25/79.44                                    (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.25/79.44                                  (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.25/79.44                                (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.25/79.44                              (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.25/79.44                            (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.25/79.44                          (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.25/79.44                        (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.25/79.44                      (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.25/79.44                    (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.25/79.44                  (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.25/79.44                (Eq (h (j e20)) e20))
% 79.25/79.44              (Eq (h (j e21)) e21))
% 79.25/79.44            (Eq (h (j e22)) e22))
% 79.25/79.44          (Eq (h (j e23)) e23))
% 79.25/79.44        (Eq (h (j e24)) e24))
% 79.25/79.44      (Eq (j (h e10)) e10))
% 79.25/79.44    True
% 79.25/79.44  Clause #307 (by clausification #[305]): Eq (j (h e11)) e11
% 79.25/79.44  Clause #341 (by clausification #[306]): Eq (Eq (j (h e10)) e10) True
% 79.25/79.44  Clause #342 (by clausification #[306]): Eq
% 79.25/79.44    (And
% 79.25/79.44      (And
% 79.25/79.44        (And
% 79.25/79.44          (And
% 79.25/79.44            (And
% 79.25/79.44              (And
% 79.25/79.44                (And
% 79.25/79.44                  (And
% 79.25/79.44                    (And
% 79.25/79.44                      (And
% 79.25/79.44                        (And
% 79.25/79.44                          (And
% 79.25/79.44                            (And
% 79.25/79.44                              (And
% 79.25/79.44                                (And
% 79.25/79.44                                  (And
% 79.25/79.44                                    (And
% 79.25/79.44                                      (And
% 79.25/79.44                                        (And
% 79.25/79.44                                          (And
% 79.25/79.44                                            (And
% 79.25/79.44                                              (And
% 79.25/79.44                                                (And
% 79.25/79.44                                                  (And
% 79.25/79.44                                                    (And
% 79.25/79.44                                                      (And
% 79.25/79.44                                                        (And
% 79.25/79.44                                                          (And
% 79.25/79.44                                                            (And
% 79.25/79.44                                                              (And
% 79.25/79.44                                                                (And
% 79.25/79.44                                                                  (And
% 79.25/79.44                                                                    (And
% 79.25/79.44                                                                      (And
% 79.25/79.44                                                                        (And
% 79.25/79.44                                                                          (And
% 79.25/79.44                                                                            (And
% 79.25/79.44                                                                              (And
% 79.25/79.44                                                                                (And
% 79.25/79.44                                                                                  (And
% 79.25/79.44                                                                                    (And
% 79.25/79.44                                                                                      (And
% 79.25/79.44                                                                                        (And
% 79.25/79.44                                                                                          (And
% 79.25/79.44                                                                                            (And
% 79.25/79.44                                                                                              (And
% 79.25/79.44                                                                                                (And
% 79.25/79.44                                                                                                  (And
% 79.25/79.44                                                                                                    (And
% 79.25/79.44                                                                                                      (And
% 79.25/79.44                                                                                                        (And
% 79.25/79.44                                                                                                          (And
% 79.25/79.44                                                                                                            (And
% 79.25/79.44                                                                                                              (And
% 79.25/79.44                                                                                                                (Eq
% 79.25/79.44                                                                                                                  (h
% 79.25/79.44                                                                                                                    (op1
% 79.25/79.44                                                                                                                      e10
% 79.25/79.44                                                                                                                      e10))
% 79.25/79.44                                                                                                                  (op2
% 79.25/79.44                                                                                                                    (h
% 79.25/79.44                                                                                                                      e10)
% 79.25/79.44                                                                                                                    (h
% 79.25/79.44                                                                                                                      e10)))
% 79.25/79.44                                                                                                                (Eq
% 79.25/79.44                                                                                                                  (h
% 79.25/79.44                                                                                                                    (op1
% 79.25/79.44                                                                                                                      e10
% 79.25/79.44                                                                                                                      e11))
% 79.25/79.44                                                                                                                  (op2
% 79.25/79.44                                                                                                                    (h
% 79.25/79.44                                                                                                                      e10)
% 79.25/79.44                                                                                                                    (h
% 79.25/79.44                                                                                                                      e11))))
% 79.25/79.44                                                                                                              (Eq
% 79.25/79.44                                                                                                                (h
% 79.25/79.44                                                                                                                  (op1 e10
% 79.25/79.44                                                                                                                    e12))
% 79.25/79.44                                                                                                                (op2
% 79.25/79.44                                                                                                                  (h e10)
% 79.25/79.44                                                                                                                  (h
% 79.25/79.44                                                                                                                    e12))))
% 79.25/79.44                                                                                                            (Eq
% 79.25/79.44                                                                                                              (h
% 79.25/79.44                                                                                                                (op1 e10
% 79.25/79.44                                                                                                                  e13))
% 79.25/79.44                                                                                                              (op2 (h e10)
% 79.25/79.44                                                                                                                (h e13))))
% 79.25/79.44                                                                                                          (Eq
% 79.25/79.44                                                                                                            (h
% 79.25/79.44                                                                                                              (op1 e10
% 79.25/79.44                                                                                                                e14))
% 79.25/79.44                                                                                                            (op2 (h e10)
% 79.25/79.44                                                                                                              (h e14))))
% 79.25/79.44                                                                                                        (Eq
% 79.25/79.44                                                                                                          (h
% 79.25/79.44                                                                                                            (op1 e11 e10))
% 79.25/79.44                                                                                                          (op2 (h e11)
% 79.25/79.44                                                                                                            (h e10))))
% 79.25/79.44                                                                                                      (Eq
% 79.25/79.44                                                                                                        (h (op1 e11 e11))
% 79.25/79.44                                                                                                        (op2 (h e11)
% 79.25/79.44                                                                                                          (h e11))))
% 79.25/79.44                                                                                                    (Eq (h (op1 e11 e12))
% 79.25/79.44                                                                                                      (op2 (h e11)
% 79.25/79.44                                                                                                        (h e12))))
% 79.25/79.44                                                                                                  (Eq (h (op1 e11 e13))
% 79.25/79.44                                                                                                    (op2 (h e11)
% 79.25/79.44                                                                                                      (h e13))))
% 79.25/79.44                                                                                                (Eq (h (op1 e11 e14))
% 79.25/79.44                                                                                                  (op2 (h e11) (h e14))))
% 79.25/79.44                                                                                              (Eq (h (op1 e12 e10))
% 79.25/79.44                                                                                                (op2 (h e12) (h e10))))
% 79.25/79.44                                                                                            (Eq (h (op1 e12 e11))
% 79.25/79.44                                                                                              (op2 (h e12) (h e11))))
% 79.25/79.44                                                                                          (Eq (h (op1 e12 e12))
% 79.25/79.45                                                                                            (op2 (h e12) (h e12))))
% 79.25/79.45                                                                                        (Eq (h (op1 e12 e13))
% 79.25/79.45                                                                                          (op2 (h e12) (h e13))))
% 79.25/79.45                                                                                      (Eq (h (op1 e12 e14))
% 79.25/79.45                                                                                        (op2 (h e12) (h e14))))
% 79.25/79.45                                                                                    (Eq (h (op1 e13 e10))
% 79.25/79.45                                                                                      (op2 (h e13) (h e10))))
% 79.25/79.45                                                                                  (Eq (h (op1 e13 e11))
% 79.25/79.45                                                                                    (op2 (h e13) (h e11))))
% 79.25/79.45                                                                                (Eq (h (op1 e13 e12))
% 79.25/79.45                                                                                  (op2 (h e13) (h e12))))
% 79.25/79.45                                                                              (Eq (h (op1 e13 e13))
% 79.25/79.45                                                                                (op2 (h e13) (h e13))))
% 79.25/79.45                                                                            (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.25/79.45                                                                          (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.25/79.45                                                                        (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.25/79.45                                                                      (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.25/79.45                                                                    (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.25/79.45                                                                  (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.25/79.45                                                                (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.25/79.45                                                              (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.25/79.45                                                            (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.25/79.45                                                          (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.25/79.45                                                        (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.25/79.45                                                      (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.25/79.45                                                    (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.25/79.45                                                  (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.25/79.45                                                (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.25/79.45                                              (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.32/79.47                                            (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.32/79.47                                          (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.32/79.47                                        (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.32/79.47                                      (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.32/79.47                                    (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.32/79.47                                  (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.32/79.47                                (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.32/79.47                              (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.32/79.47                            (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.32/79.47                          (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.32/79.47                        (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.32/79.47                      (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.32/79.47                    (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.32/79.47                  (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.32/79.47                (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.32/79.47              (Eq (h (j e20)) e20))
% 79.32/79.47            (Eq (h (j e21)) e21))
% 79.32/79.47          (Eq (h (j e22)) e22))
% 79.32/79.47        (Eq (h (j e23)) e23))
% 79.32/79.47      (Eq (h (j e24)) e24))
% 79.32/79.47    True
% 79.32/79.47  Clause #343 (by clausification #[341]): Eq (j (h e10)) e10
% 79.32/79.47  Clause #375 (by clausification #[342]): Eq (Eq (h (j e24)) e24) True
% 79.32/79.47  Clause #376 (by clausification #[342]): Eq
% 79.32/79.47    (And
% 79.32/79.47      (And
% 79.32/79.47        (And
% 79.32/79.47          (And
% 79.32/79.47            (And
% 79.32/79.47              (And
% 79.32/79.47                (And
% 79.32/79.47                  (And
% 79.32/79.47                    (And
% 79.32/79.47                      (And
% 79.32/79.47                        (And
% 79.32/79.47                          (And
% 79.32/79.47                            (And
% 79.32/79.47                              (And
% 79.32/79.47                                (And
% 79.32/79.47                                  (And
% 79.32/79.47                                    (And
% 79.32/79.47                                      (And
% 79.32/79.47                                        (And
% 79.32/79.47                                          (And
% 79.32/79.47                                            (And
% 79.32/79.47                                              (And
% 79.32/79.47                                                (And
% 79.32/79.47                                                  (And
% 79.32/79.47                                                    (And
% 79.32/79.47                                                      (And
% 79.32/79.47                                                        (And
% 79.32/79.47                                                          (And
% 79.32/79.47                                                            (And
% 79.32/79.47                                                              (And
% 79.32/79.47                                                                (And
% 79.32/79.47                                                                  (And
% 79.32/79.47                                                                    (And
% 79.32/79.47                                                                      (And
% 79.32/79.47                                                                        (And
% 79.32/79.47                                                                          (And
% 79.32/79.47                                                                            (And
% 79.32/79.47                                                                              (And
% 79.32/79.47                                                                                (And
% 79.32/79.47                                                                                  (And
% 79.32/79.47                                                                                    (And
% 79.32/79.47                                                                                      (And
% 79.32/79.47                                                                                        (And
% 79.32/79.47                                                                                          (And
% 79.32/79.47                                                                                            (And
% 79.32/79.47                                                                                              (And
% 79.32/79.47                                                                                                (And
% 79.32/79.47                                                                                                  (And
% 79.32/79.47                                                                                                    (And
% 79.32/79.47                                                                                                      (And
% 79.32/79.47                                                                                                        (And
% 79.32/79.47                                                                                                          (And
% 79.32/79.47                                                                                                            (And
% 79.32/79.47                                                                                                              (Eq
% 79.32/79.47                                                                                                                (h
% 79.32/79.47                                                                                                                  (op1 e10
% 79.32/79.47                                                                                                                    e10))
% 79.32/79.47                                                                                                                (op2
% 79.32/79.47                                                                                                                  (h e10)
% 79.32/79.47                                                                                                                  (h
% 79.32/79.47                                                                                                                    e10)))
% 79.32/79.47                                                                                                              (Eq
% 79.32/79.47                                                                                                                (h
% 79.32/79.47                                                                                                                  (op1 e10
% 79.32/79.47                                                                                                                    e11))
% 79.32/79.47                                                                                                                (op2
% 79.32/79.47                                                                                                                  (h e10)
% 79.32/79.47                                                                                                                  (h
% 79.32/79.47                                                                                                                    e11))))
% 79.32/79.47                                                                                                            (Eq
% 79.32/79.47                                                                                                              (h
% 79.32/79.47                                                                                                                (op1 e10
% 79.32/79.47                                                                                                                  e12))
% 79.32/79.47                                                                                                              (op2 (h e10)
% 79.32/79.47                                                                                                                (h e12))))
% 79.32/79.47                                                                                                          (Eq
% 79.32/79.47                                                                                                            (h
% 79.32/79.47                                                                                                              (op1 e10
% 79.32/79.47                                                                                                                e13))
% 79.32/79.47                                                                                                            (op2 (h e10)
% 79.32/79.47                                                                                                              (h e13))))
% 79.32/79.47                                                                                                        (Eq
% 79.32/79.47                                                                                                          (h
% 79.32/79.47                                                                                                            (op1 e10 e14))
% 79.32/79.47                                                                                                          (op2 (h e10)
% 79.32/79.47                                                                                                            (h e14))))
% 79.32/79.47                                                                                                      (Eq
% 79.32/79.47                                                                                                        (h (op1 e11 e10))
% 79.32/79.47                                                                                                        (op2 (h e11)
% 79.32/79.47                                                                                                          (h e10))))
% 79.32/79.47                                                                                                    (Eq (h (op1 e11 e11))
% 79.32/79.47                                                                                                      (op2 (h e11)
% 79.32/79.47                                                                                                        (h e11))))
% 79.32/79.47                                                                                                  (Eq (h (op1 e11 e12))
% 79.32/79.47                                                                                                    (op2 (h e11)
% 79.32/79.47                                                                                                      (h e12))))
% 79.32/79.47                                                                                                (Eq (h (op1 e11 e13))
% 79.32/79.47                                                                                                  (op2 (h e11) (h e13))))
% 79.32/79.47                                                                                              (Eq (h (op1 e11 e14))
% 79.32/79.47                                                                                                (op2 (h e11) (h e14))))
% 79.32/79.47                                                                                            (Eq (h (op1 e12 e10))
% 79.32/79.47                                                                                              (op2 (h e12) (h e10))))
% 79.32/79.47                                                                                          (Eq (h (op1 e12 e11))
% 79.32/79.47                                                                                            (op2 (h e12) (h e11))))
% 79.32/79.47                                                                                        (Eq (h (op1 e12 e12))
% 79.32/79.47                                                                                          (op2 (h e12) (h e12))))
% 79.32/79.47                                                                                      (Eq (h (op1 e12 e13))
% 79.32/79.47                                                                                        (op2 (h e12) (h e13))))
% 79.32/79.47                                                                                    (Eq (h (op1 e12 e14))
% 79.32/79.47                                                                                      (op2 (h e12) (h e14))))
% 79.32/79.47                                                                                  (Eq (h (op1 e13 e10))
% 79.32/79.47                                                                                    (op2 (h e13) (h e10))))
% 79.32/79.47                                                                                (Eq (h (op1 e13 e11))
% 79.32/79.47                                                                                  (op2 (h e13) (h e11))))
% 79.32/79.47                                                                              (Eq (h (op1 e13 e12))
% 79.32/79.47                                                                                (op2 (h e13) (h e12))))
% 79.32/79.47                                                                            (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.32/79.47                                                                          (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.32/79.47                                                                        (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.32/79.47                                                                      (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.32/79.47                                                                    (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.32/79.50                                                                  (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.32/79.50                                                                (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.32/79.50                                                              (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.32/79.50                                                            (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.32/79.50                                                          (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.32/79.50                                                        (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.32/79.50                                                      (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.32/79.50                                                    (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.32/79.50                                                  (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.32/79.50                                                (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.32/79.50                                              (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.32/79.50                                            (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.32/79.50                                          (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.32/79.50                                        (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.32/79.50                                      (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.32/79.50                                    (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.32/79.50                                  (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.32/79.50                                (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.32/79.50                              (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.32/79.50                            (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.32/79.50                          (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.32/79.50                        (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.32/79.50                      (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.32/79.50                    (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.32/79.50                  (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.32/79.50                (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.32/79.50              (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.32/79.50            (Eq (h (j e20)) e20))
% 79.32/79.50          (Eq (h (j e21)) e21))
% 79.32/79.50        (Eq (h (j e22)) e22))
% 79.32/79.50      (Eq (h (j e23)) e23))
% 79.32/79.50    True
% 79.32/79.50  Clause #377 (by clausification #[375]): Eq (h (j e24)) e24
% 79.32/79.50  Clause #378 (by superposition #[377, 102]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e10) (Or (Eq (j e24) e11) (Eq (h e13) e24))))
% 79.32/79.50  Clause #379 (by superposition #[378, 377]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e10) e24))))
% 79.32/79.50  Clause #383 (by superposition #[379, 377]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e24) (Eq (h e12) e24))))
% 79.32/79.50  Clause #410 (by clausification #[376]): Eq
% 79.32/79.50    (And
% 79.32/79.50      (And
% 79.32/79.50        (And
% 79.32/79.50          (And
% 79.32/79.50            (And
% 79.32/79.50              (And
% 79.32/79.50                (And
% 79.32/79.50                  (And
% 79.32/79.50                    (And
% 79.32/79.50                      (And
% 79.32/79.50                        (And
% 79.32/79.50                          (And
% 79.32/79.50                            (And
% 79.32/79.50                              (And
% 79.32/79.50                                (And
% 79.32/79.50                                  (And
% 79.32/79.50                                    (And
% 79.32/79.50                                      (And
% 79.32/79.50                                        (And
% 79.32/79.50                                          (And
% 79.32/79.50                                            (And
% 79.32/79.50                                              (And
% 79.32/79.50                                                (And
% 79.32/79.50                                                  (And
% 79.32/79.50                                                    (And
% 79.32/79.50                                                      (And
% 79.32/79.50                                                        (And
% 79.32/79.50                                                          (And
% 79.32/79.50                                                            (And
% 79.32/79.50                                                              (And
% 79.32/79.50                                                                (And
% 79.32/79.50                                                                  (And
% 79.32/79.50                                                                    (And
% 79.32/79.50                                                                      (And
% 79.32/79.50                                                                        (And
% 79.32/79.50                                                                          (And
% 79.32/79.50                                                                            (And
% 79.32/79.50                                                                              (And
% 79.32/79.50                                                                                (And
% 79.32/79.50                                                                                  (And
% 79.32/79.50                                                                                    (And
% 79.32/79.50                                                                                      (And
% 79.32/79.50                                                                                        (And
% 79.32/79.50                                                                                          (And
% 79.32/79.50                                                                                            (And
% 79.32/79.50                                                                                              (And
% 79.32/79.50                                                                                                (And
% 79.32/79.50                                                                                                  (And
% 79.32/79.50                                                                                                    (And
% 79.32/79.50                                                                                                      (And
% 79.32/79.50                                                                                                        (And
% 79.32/79.50                                                                                                          (And
% 79.32/79.50                                                                                                            (Eq
% 79.32/79.50                                                                                                              (h
% 79.32/79.50                                                                                                                (op1 e10
% 79.32/79.50                                                                                                                  e10))
% 79.32/79.50                                                                                                              (op2 (h e10)
% 79.32/79.50                                                                                                                (h e10)))
% 79.32/79.50                                                                                                            (Eq
% 79.32/79.50                                                                                                              (h
% 79.32/79.50                                                                                                                (op1 e10
% 79.32/79.50                                                                                                                  e11))
% 79.32/79.50                                                                                                              (op2 (h e10)
% 79.32/79.50                                                                                                                (h e11))))
% 79.32/79.50                                                                                                          (Eq
% 79.32/79.50                                                                                                            (h
% 79.32/79.50                                                                                                              (op1 e10
% 79.32/79.50                                                                                                                e12))
% 79.32/79.50                                                                                                            (op2 (h e10)
% 79.32/79.50                                                                                                              (h e12))))
% 79.32/79.50                                                                                                        (Eq
% 79.32/79.50                                                                                                          (h
% 79.32/79.50                                                                                                            (op1 e10 e13))
% 79.32/79.50                                                                                                          (op2 (h e10)
% 79.32/79.50                                                                                                            (h e13))))
% 79.32/79.50                                                                                                      (Eq
% 79.32/79.50                                                                                                        (h (op1 e10 e14))
% 79.32/79.50                                                                                                        (op2 (h e10)
% 79.32/79.50                                                                                                          (h e14))))
% 79.32/79.50                                                                                                    (Eq (h (op1 e11 e10))
% 79.32/79.50                                                                                                      (op2 (h e11)
% 79.32/79.50                                                                                                        (h e10))))
% 79.32/79.50                                                                                                  (Eq (h (op1 e11 e11))
% 79.32/79.50                                                                                                    (op2 (h e11)
% 79.32/79.50                                                                                                      (h e11))))
% 79.32/79.50                                                                                                (Eq (h (op1 e11 e12))
% 79.32/79.50                                                                                                  (op2 (h e11) (h e12))))
% 79.32/79.50                                                                                              (Eq (h (op1 e11 e13))
% 79.32/79.50                                                                                                (op2 (h e11) (h e13))))
% 79.32/79.50                                                                                            (Eq (h (op1 e11 e14))
% 79.32/79.50                                                                                              (op2 (h e11) (h e14))))
% 79.32/79.50                                                                                          (Eq (h (op1 e12 e10))
% 79.32/79.50                                                                                            (op2 (h e12) (h e10))))
% 79.32/79.50                                                                                        (Eq (h (op1 e12 e11))
% 79.32/79.50                                                                                          (op2 (h e12) (h e11))))
% 79.32/79.50                                                                                      (Eq (h (op1 e12 e12))
% 79.32/79.50                                                                                        (op2 (h e12) (h e12))))
% 79.32/79.50                                                                                    (Eq (h (op1 e12 e13))
% 79.32/79.50                                                                                      (op2 (h e12) (h e13))))
% 79.32/79.50                                                                                  (Eq (h (op1 e12 e14))
% 79.32/79.50                                                                                    (op2 (h e12) (h e14))))
% 79.32/79.50                                                                                (Eq (h (op1 e13 e10))
% 79.32/79.50                                                                                  (op2 (h e13) (h e10))))
% 79.32/79.50                                                                              (Eq (h (op1 e13 e11))
% 79.32/79.50                                                                                (op2 (h e13) (h e11))))
% 79.32/79.50                                                                            (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.32/79.50                                                                          (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.32/79.50                                                                        (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.32/79.53                                                                      (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.32/79.53                                                                    (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.32/79.53                                                                  (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.32/79.53                                                                (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.32/79.53                                                              (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.32/79.53                                                            (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.32/79.53                                                          (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.32/79.53                                                        (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.32/79.53                                                      (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.32/79.53                                                    (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.32/79.53                                                  (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.32/79.53                                                (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.32/79.53                                              (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.32/79.53                                            (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.32/79.53                                          (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.32/79.53                                        (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.32/79.53                                      (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.32/79.53                                    (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.32/79.53                                  (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.32/79.53                                (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.32/79.53                              (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.32/79.53                            (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.32/79.53                          (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.32/79.53                        (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.32/79.53                      (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.32/79.53                    (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.32/79.53                  (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.32/79.53                (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.32/79.53              (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.32/79.53            (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.32/79.53          (Eq (h (j e20)) e20))
% 79.32/79.53        (Eq (h (j e21)) e21))
% 79.32/79.53      (Eq (h (j e22)) e22))
% 79.32/79.53    True
% 79.32/79.53  Clause #465 (by clausification #[410]): Eq (Eq (h (j e22)) e22) True
% 79.32/79.53  Clause #466 (by clausification #[410]): Eq
% 79.32/79.53    (And
% 79.32/79.53      (And
% 79.32/79.53        (And
% 79.32/79.53          (And
% 79.32/79.53            (And
% 79.32/79.53              (And
% 79.32/79.53                (And
% 79.32/79.53                  (And
% 79.32/79.53                    (And
% 79.32/79.53                      (And
% 79.32/79.53                        (And
% 79.32/79.53                          (And
% 79.32/79.53                            (And
% 79.32/79.53                              (And
% 79.32/79.53                                (And
% 79.32/79.53                                  (And
% 79.32/79.53                                    (And
% 79.32/79.53                                      (And
% 79.32/79.53                                        (And
% 79.32/79.53                                          (And
% 79.32/79.53                                            (And
% 79.32/79.53                                              (And
% 79.32/79.53                                                (And
% 79.32/79.53                                                  (And
% 79.32/79.53                                                    (And
% 79.32/79.53                                                      (And
% 79.32/79.53                                                        (And
% 79.32/79.53                                                          (And
% 79.32/79.53                                                            (And
% 79.32/79.53                                                              (And
% 79.32/79.53                                                                (And
% 79.32/79.53                                                                  (And
% 79.32/79.53                                                                    (And
% 79.32/79.53                                                                      (And
% 79.32/79.53                                                                        (And
% 79.32/79.53                                                                          (And
% 79.32/79.53                                                                            (And
% 79.32/79.53                                                                              (And
% 79.32/79.53                                                                                (And
% 79.32/79.53                                                                                  (And
% 79.32/79.53                                                                                    (And
% 79.32/79.53                                                                                      (And
% 79.32/79.53                                                                                        (And
% 79.32/79.53                                                                                          (And
% 79.32/79.53                                                                                            (And
% 79.32/79.53                                                                                              (And
% 79.32/79.53                                                                                                (And
% 79.32/79.53                                                                                                  (And
% 79.32/79.53                                                                                                    (And
% 79.32/79.53                                                                                                      (And
% 79.32/79.53                                                                                                        (And
% 79.32/79.53                                                                                                          (Eq
% 79.32/79.53                                                                                                            (h
% 79.32/79.53                                                                                                              (op1 e10
% 79.32/79.53                                                                                                                e10))
% 79.32/79.53                                                                                                            (op2 (h e10)
% 79.32/79.53                                                                                                              (h e10)))
% 79.32/79.53                                                                                                          (Eq
% 79.32/79.53                                                                                                            (h
% 79.32/79.53                                                                                                              (op1 e10
% 79.32/79.53                                                                                                                e11))
% 79.32/79.53                                                                                                            (op2 (h e10)
% 79.32/79.53                                                                                                              (h e11))))
% 79.32/79.53                                                                                                        (Eq
% 79.32/79.53                                                                                                          (h
% 79.32/79.53                                                                                                            (op1 e10 e12))
% 79.32/79.53                                                                                                          (op2 (h e10)
% 79.32/79.53                                                                                                            (h e12))))
% 79.32/79.53                                                                                                      (Eq
% 79.32/79.53                                                                                                        (h (op1 e10 e13))
% 79.32/79.53                                                                                                        (op2 (h e10)
% 79.32/79.53                                                                                                          (h e13))))
% 79.32/79.53                                                                                                    (Eq (h (op1 e10 e14))
% 79.32/79.53                                                                                                      (op2 (h e10)
% 79.32/79.53                                                                                                        (h e14))))
% 79.32/79.53                                                                                                  (Eq (h (op1 e11 e10))
% 79.32/79.53                                                                                                    (op2 (h e11)
% 79.32/79.53                                                                                                      (h e10))))
% 79.32/79.53                                                                                                (Eq (h (op1 e11 e11))
% 79.32/79.53                                                                                                  (op2 (h e11) (h e11))))
% 79.32/79.53                                                                                              (Eq (h (op1 e11 e12))
% 79.32/79.53                                                                                                (op2 (h e11) (h e12))))
% 79.32/79.53                                                                                            (Eq (h (op1 e11 e13))
% 79.32/79.53                                                                                              (op2 (h e11) (h e13))))
% 79.32/79.53                                                                                          (Eq (h (op1 e11 e14))
% 79.32/79.53                                                                                            (op2 (h e11) (h e14))))
% 79.32/79.53                                                                                        (Eq (h (op1 e12 e10))
% 79.32/79.53                                                                                          (op2 (h e12) (h e10))))
% 79.32/79.53                                                                                      (Eq (h (op1 e12 e11))
% 79.32/79.53                                                                                        (op2 (h e12) (h e11))))
% 79.32/79.53                                                                                    (Eq (h (op1 e12 e12))
% 79.32/79.53                                                                                      (op2 (h e12) (h e12))))
% 79.32/79.53                                                                                  (Eq (h (op1 e12 e13))
% 79.32/79.53                                                                                    (op2 (h e12) (h e13))))
% 79.32/79.53                                                                                (Eq (h (op1 e12 e14))
% 79.32/79.53                                                                                  (op2 (h e12) (h e14))))
% 79.32/79.53                                                                              (Eq (h (op1 e13 e10))
% 79.32/79.53                                                                                (op2 (h e13) (h e10))))
% 79.32/79.53                                                                            (Eq (h (op1 e13 e11)) (op2 (h e13) (h e11))))
% 79.32/79.53                                                                          (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.32/79.53                                                                        (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.32/79.53                                                                      (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.32/79.53                                                                    (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.32/79.53                                                                  (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.32/79.53                                                                (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.32/79.53                                                              (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.32/79.53                                                            (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.32/79.53                                                          (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.32/79.53                                                        (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.32/79.53                                                      (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.32/79.55                                                    (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.32/79.55                                                  (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.32/79.55                                                (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.32/79.55                                              (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.32/79.55                                            (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.32/79.55                                          (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.32/79.55                                        (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.32/79.55                                      (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.32/79.55                                    (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.32/79.55                                  (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.32/79.55                                (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.32/79.55                              (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.32/79.55                            (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.32/79.55                          (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.32/79.55                        (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.32/79.55                      (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.32/79.55                    (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.32/79.55                  (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.32/79.55                (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.32/79.55              (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.32/79.55            (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.32/79.55          (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.32/79.55        (Eq (h (j e20)) e20))
% 79.32/79.55      (Eq (h (j e21)) e21))
% 79.32/79.55    True
% 79.32/79.55  Clause #467 (by clausification #[465]): Eq (h (j e22)) e22
% 79.32/79.55  Clause #591 (by clausification #[466]): Eq
% 79.32/79.55    (And
% 79.32/79.55      (And
% 79.32/79.55        (And
% 79.32/79.55          (And
% 79.32/79.55            (And
% 79.32/79.55              (And
% 79.32/79.55                (And
% 79.32/79.55                  (And
% 79.32/79.55                    (And
% 79.32/79.55                      (And
% 79.32/79.55                        (And
% 79.32/79.55                          (And
% 79.32/79.55                            (And
% 79.32/79.55                              (And
% 79.32/79.55                                (And
% 79.32/79.55                                  (And
% 79.32/79.55                                    (And
% 79.32/79.55                                      (And
% 79.32/79.55                                        (And
% 79.32/79.55                                          (And
% 79.32/79.55                                            (And
% 79.32/79.55                                              (And
% 79.32/79.55                                                (And
% 79.32/79.55                                                  (And
% 79.32/79.55                                                    (And
% 79.32/79.55                                                      (And
% 79.32/79.55                                                        (And
% 79.32/79.55                                                          (And
% 79.32/79.55                                                            (And
% 79.32/79.55                                                              (And
% 79.32/79.55                                                                (And
% 79.32/79.55                                                                  (And
% 79.32/79.55                                                                    (And
% 79.32/79.55                                                                      (And
% 79.32/79.55                                                                        (And
% 79.32/79.55                                                                          (And
% 79.32/79.55                                                                            (And
% 79.32/79.55                                                                              (And
% 79.32/79.55                                                                                (And
% 79.32/79.55                                                                                  (And
% 79.32/79.55                                                                                    (And
% 79.32/79.55                                                                                      (And
% 79.32/79.55                                                                                        (And
% 79.32/79.55                                                                                          (And
% 79.32/79.55                                                                                            (And
% 79.32/79.55                                                                                              (And
% 79.32/79.55                                                                                                (And
% 79.32/79.55                                                                                                  (And
% 79.32/79.55                                                                                                    (And
% 79.32/79.55                                                                                                      (And
% 79.32/79.55                                                                                                        (Eq
% 79.32/79.55                                                                                                          (h
% 79.32/79.55                                                                                                            (op1 e10 e10))
% 79.32/79.55                                                                                                          (op2 (h e10)
% 79.32/79.55                                                                                                            (h e10)))
% 79.32/79.55                                                                                                        (Eq
% 79.32/79.55                                                                                                          (h
% 79.32/79.55                                                                                                            (op1 e10 e11))
% 79.32/79.55                                                                                                          (op2 (h e10)
% 79.32/79.55                                                                                                            (h e11))))
% 79.32/79.55                                                                                                      (Eq
% 79.32/79.55                                                                                                        (h (op1 e10 e12))
% 79.32/79.55                                                                                                        (op2 (h e10)
% 79.32/79.55                                                                                                          (h e12))))
% 79.32/79.55                                                                                                    (Eq (h (op1 e10 e13))
% 79.32/79.55                                                                                                      (op2 (h e10)
% 79.32/79.55                                                                                                        (h e13))))
% 79.32/79.55                                                                                                  (Eq (h (op1 e10 e14))
% 79.32/79.55                                                                                                    (op2 (h e10)
% 79.32/79.55                                                                                                      (h e14))))
% 79.32/79.55                                                                                                (Eq (h (op1 e11 e10))
% 79.32/79.55                                                                                                  (op2 (h e11) (h e10))))
% 79.32/79.55                                                                                              (Eq (h (op1 e11 e11))
% 79.32/79.55                                                                                                (op2 (h e11) (h e11))))
% 79.32/79.55                                                                                            (Eq (h (op1 e11 e12))
% 79.32/79.55                                                                                              (op2 (h e11) (h e12))))
% 79.32/79.55                                                                                          (Eq (h (op1 e11 e13))
% 79.32/79.55                                                                                            (op2 (h e11) (h e13))))
% 79.32/79.55                                                                                        (Eq (h (op1 e11 e14))
% 79.32/79.55                                                                                          (op2 (h e11) (h e14))))
% 79.32/79.55                                                                                      (Eq (h (op1 e12 e10))
% 79.32/79.55                                                                                        (op2 (h e12) (h e10))))
% 79.41/79.58                                                                                    (Eq (h (op1 e12 e11))
% 79.41/79.58                                                                                      (op2 (h e12) (h e11))))
% 79.41/79.58                                                                                  (Eq (h (op1 e12 e12))
% 79.41/79.58                                                                                    (op2 (h e12) (h e12))))
% 79.41/79.58                                                                                (Eq (h (op1 e12 e13))
% 79.41/79.58                                                                                  (op2 (h e12) (h e13))))
% 79.41/79.58                                                                              (Eq (h (op1 e12 e14))
% 79.41/79.58                                                                                (op2 (h e12) (h e14))))
% 79.41/79.58                                                                            (Eq (h (op1 e13 e10)) (op2 (h e13) (h e10))))
% 79.41/79.58                                                                          (Eq (h (op1 e13 e11)) (op2 (h e13) (h e11))))
% 79.41/79.58                                                                        (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.41/79.58                                                                      (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.41/79.58                                                                    (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.41/79.58                                                                  (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.41/79.58                                                                (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.41/79.58                                                              (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.41/79.58                                                            (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.41/79.58                                                          (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.41/79.58                                                        (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.41/79.58                                                      (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.41/79.58                                                    (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.41/79.58                                                  (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.41/79.58                                                (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.41/79.58                                              (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.41/79.58                                            (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.41/79.58                                          (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.41/79.58                                        (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.41/79.58                                      (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.41/79.58                                    (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.41/79.58                                  (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.41/79.58                                (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.41/79.58                              (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.41/79.58                            (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.41/79.58                          (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.41/79.58                        (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.41/79.58                      (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.41/79.58                    (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.41/79.58                  (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.41/79.58                (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.41/79.58              (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.41/79.58            (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.41/79.58          (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.41/79.58        (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.41/79.58      (Eq (h (j e20)) e20))
% 79.41/79.58    True
% 79.41/79.58  Clause #900 (by clausification #[591]): Eq (Eq (h (j e20)) e20) True
% 79.41/79.58  Clause #901 (by clausification #[591]): Eq
% 79.41/79.58    (And
% 79.41/79.58      (And
% 79.41/79.58        (And
% 79.41/79.58          (And
% 79.41/79.58            (And
% 79.41/79.58              (And
% 79.41/79.58                (And
% 79.41/79.58                  (And
% 79.41/79.58                    (And
% 79.41/79.58                      (And
% 79.41/79.58                        (And
% 79.41/79.58                          (And
% 79.41/79.58                            (And
% 79.41/79.58                              (And
% 79.41/79.58                                (And
% 79.41/79.58                                  (And
% 79.41/79.58                                    (And
% 79.41/79.58                                      (And
% 79.41/79.58                                        (And
% 79.41/79.58                                          (And
% 79.41/79.58                                            (And
% 79.41/79.58                                              (And
% 79.41/79.58                                                (And
% 79.41/79.58                                                  (And
% 79.41/79.58                                                    (And
% 79.41/79.58                                                      (And
% 79.41/79.58                                                        (And
% 79.41/79.58                                                          (And
% 79.41/79.58                                                            (And
% 79.41/79.58                                                              (And
% 79.41/79.58                                                                (And
% 79.41/79.58                                                                  (And
% 79.41/79.58                                                                    (And
% 79.41/79.58                                                                      (And
% 79.41/79.58                                                                        (And
% 79.41/79.58                                                                          (And
% 79.41/79.58                                                                            (And
% 79.41/79.58                                                                              (And
% 79.41/79.58                                                                                (And
% 79.41/79.58                                                                                  (And
% 79.41/79.58                                                                                    (And
% 79.41/79.58                                                                                      (And
% 79.41/79.58                                                                                        (And
% 79.41/79.58                                                                                          (And
% 79.41/79.58                                                                                            (And
% 79.41/79.58                                                                                              (And
% 79.41/79.58                                                                                                (And
% 79.41/79.58                                                                                                  (And
% 79.41/79.58                                                                                                    (And
% 79.41/79.58                                                                                                      (Eq
% 79.41/79.58                                                                                                        (h (op1 e10 e10))
% 79.41/79.58                                                                                                        (op2 (h e10)
% 79.41/79.58                                                                                                          (h e10)))
% 79.41/79.58                                                                                                      (Eq
% 79.41/79.58                                                                                                        (h (op1 e10 e11))
% 79.41/79.58                                                                                                        (op2 (h e10)
% 79.41/79.58                                                                                                          (h e11))))
% 79.41/79.58                                                                                                    (Eq (h (op1 e10 e12))
% 79.41/79.58                                                                                                      (op2 (h e10)
% 79.41/79.58                                                                                                        (h e12))))
% 79.41/79.58                                                                                                  (Eq (h (op1 e10 e13))
% 79.41/79.58                                                                                                    (op2 (h e10)
% 79.41/79.58                                                                                                      (h e13))))
% 79.41/79.58                                                                                                (Eq (h (op1 e10 e14))
% 79.41/79.58                                                                                                  (op2 (h e10) (h e14))))
% 79.41/79.58                                                                                              (Eq (h (op1 e11 e10))
% 79.41/79.58                                                                                                (op2 (h e11) (h e10))))
% 79.41/79.58                                                                                            (Eq (h (op1 e11 e11))
% 79.41/79.58                                                                                              (op2 (h e11) (h e11))))
% 79.41/79.58                                                                                          (Eq (h (op1 e11 e12))
% 79.41/79.58                                                                                            (op2 (h e11) (h e12))))
% 79.41/79.58                                                                                        (Eq (h (op1 e11 e13))
% 79.41/79.58                                                                                          (op2 (h e11) (h e13))))
% 79.41/79.58                                                                                      (Eq (h (op1 e11 e14))
% 79.41/79.58                                                                                        (op2 (h e11) (h e14))))
% 79.41/79.58                                                                                    (Eq (h (op1 e12 e10))
% 79.41/79.58                                                                                      (op2 (h e12) (h e10))))
% 79.41/79.58                                                                                  (Eq (h (op1 e12 e11))
% 79.41/79.58                                                                                    (op2 (h e12) (h e11))))
% 79.41/79.58                                                                                (Eq (h (op1 e12 e12))
% 79.41/79.58                                                                                  (op2 (h e12) (h e12))))
% 79.41/79.58                                                                              (Eq (h (op1 e12 e13))
% 79.41/79.58                                                                                (op2 (h e12) (h e13))))
% 79.41/79.58                                                                            (Eq (h (op1 e12 e14)) (op2 (h e12) (h e14))))
% 79.41/79.58                                                                          (Eq (h (op1 e13 e10)) (op2 (h e13) (h e10))))
% 79.41/79.58                                                                        (Eq (h (op1 e13 e11)) (op2 (h e13) (h e11))))
% 79.41/79.58                                                                      (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.41/79.58                                                                    (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.41/79.58                                                                  (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.41/79.58                                                                (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.41/79.58                                                              (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.41/79.58                                                            (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.41/79.58                                                          (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.41/79.58                                                        (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.41/79.58                                                      (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.41/79.58                                                    (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.41/79.58                                                  (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.41/79.58                                                (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.41/79.58                                              (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.41/79.58                                            (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.41/79.58                                          (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.43/79.61                                        (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.43/79.61                                      (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.43/79.61                                    (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.43/79.61                                  (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.43/79.61                                (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.43/79.61                              (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.43/79.61                            (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.43/79.61                          (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.43/79.61                        (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.43/79.61                      (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.43/79.61                    (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.43/79.61                  (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.43/79.61                (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.43/79.61              (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.43/79.61            (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.43/79.61          (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.43/79.61        (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.43/79.61      (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))))
% 79.43/79.61    True
% 79.43/79.61  Clause #902 (by clausification #[900]): Eq (h (j e20)) e20
% 79.43/79.61  Clause #1925 (by clausification #[901]): Eq (Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))) True
% 79.43/79.61  Clause #1926 (by clausification #[901]): Eq
% 79.43/79.61    (And
% 79.43/79.61      (And
% 79.43/79.61        (And
% 79.43/79.61          (And
% 79.43/79.61            (And
% 79.43/79.61              (And
% 79.43/79.61                (And
% 79.43/79.61                  (And
% 79.43/79.61                    (And
% 79.43/79.61                      (And
% 79.43/79.61                        (And
% 79.43/79.61                          (And
% 79.43/79.61                            (And
% 79.43/79.61                              (And
% 79.43/79.61                                (And
% 79.43/79.61                                  (And
% 79.43/79.61                                    (And
% 79.43/79.61                                      (And
% 79.43/79.61                                        (And
% 79.43/79.61                                          (And
% 79.43/79.61                                            (And
% 79.43/79.61                                              (And
% 79.43/79.61                                                (And
% 79.43/79.61                                                  (And
% 79.43/79.61                                                    (And
% 79.43/79.61                                                      (And
% 79.43/79.61                                                        (And
% 79.43/79.61                                                          (And
% 79.43/79.61                                                            (And
% 79.43/79.61                                                              (And
% 79.43/79.61                                                                (And
% 79.43/79.61                                                                  (And
% 79.43/79.61                                                                    (And
% 79.43/79.61                                                                      (And
% 79.43/79.61                                                                        (And
% 79.43/79.61                                                                          (And
% 79.43/79.61                                                                            (And
% 79.43/79.61                                                                              (And
% 79.43/79.61                                                                                (And
% 79.43/79.61                                                                                  (And
% 79.43/79.61                                                                                    (And
% 79.43/79.61                                                                                      (And
% 79.43/79.61                                                                                        (And
% 79.43/79.61                                                                                          (And
% 79.43/79.61                                                                                            (And
% 79.43/79.61                                                                                              (And
% 79.43/79.61                                                                                                (And
% 79.43/79.61                                                                                                  (And
% 79.43/79.61                                                                                                    (Eq (h (op1 e10 e10))
% 79.43/79.61                                                                                                      (op2 (h e10)
% 79.43/79.61                                                                                                        (h e10)))
% 79.43/79.61                                                                                                    (Eq (h (op1 e10 e11))
% 79.43/79.61                                                                                                      (op2 (h e10)
% 79.43/79.61                                                                                                        (h e11))))
% 79.43/79.61                                                                                                  (Eq (h (op1 e10 e12))
% 79.43/79.61                                                                                                    (op2 (h e10)
% 79.43/79.61                                                                                                      (h e12))))
% 79.43/79.61                                                                                                (Eq (h (op1 e10 e13))
% 79.43/79.61                                                                                                  (op2 (h e10) (h e13))))
% 79.43/79.61                                                                                              (Eq (h (op1 e10 e14))
% 79.43/79.61                                                                                                (op2 (h e10) (h e14))))
% 79.43/79.61                                                                                            (Eq (h (op1 e11 e10))
% 79.43/79.61                                                                                              (op2 (h e11) (h e10))))
% 79.43/79.61                                                                                          (Eq (h (op1 e11 e11))
% 79.43/79.61                                                                                            (op2 (h e11) (h e11))))
% 79.43/79.61                                                                                        (Eq (h (op1 e11 e12))
% 79.43/79.61                                                                                          (op2 (h e11) (h e12))))
% 79.43/79.61                                                                                      (Eq (h (op1 e11 e13))
% 79.43/79.61                                                                                        (op2 (h e11) (h e13))))
% 79.43/79.61                                                                                    (Eq (h (op1 e11 e14))
% 79.43/79.61                                                                                      (op2 (h e11) (h e14))))
% 79.43/79.61                                                                                  (Eq (h (op1 e12 e10))
% 79.43/79.61                                                                                    (op2 (h e12) (h e10))))
% 79.43/79.61                                                                                (Eq (h (op1 e12 e11))
% 79.43/79.61                                                                                  (op2 (h e12) (h e11))))
% 79.43/79.61                                                                              (Eq (h (op1 e12 e12))
% 79.43/79.61                                                                                (op2 (h e12) (h e12))))
% 79.43/79.61                                                                            (Eq (h (op1 e12 e13)) (op2 (h e12) (h e13))))
% 79.43/79.61                                                                          (Eq (h (op1 e12 e14)) (op2 (h e12) (h e14))))
% 79.43/79.61                                                                        (Eq (h (op1 e13 e10)) (op2 (h e13) (h e10))))
% 79.43/79.61                                                                      (Eq (h (op1 e13 e11)) (op2 (h e13) (h e11))))
% 79.43/79.61                                                                    (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.43/79.61                                                                  (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.43/79.61                                                                (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.43/79.61                                                              (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.43/79.62                                                            (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.43/79.62                                                          (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.43/79.62                                                        (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.43/79.62                                                      (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.43/79.62                                                    (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.43/79.62                                                  (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.43/79.62                                                (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.43/79.62                                              (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.43/79.62                                            (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.43/79.62                                          (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.43/79.62                                        (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.43/79.62                                      (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.43/79.62                                    (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.43/79.62                                  (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.43/79.62                                (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.43/79.62                              (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.43/79.62                            (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.43/79.62                          (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.43/79.62                        (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.43/79.62                      (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.43/79.62                    (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.43/79.62                  (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.43/79.62                (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.43/79.62              (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.43/79.62            (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.43/79.62          (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.43/79.62        (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.43/79.62      (Eq (j (op2 e24 e23)) (op1 (j e24) (j e23))))
% 79.43/79.62    True
% 79.43/79.62  Clause #1927 (by clausification #[1925]): Eq (j (op2 e24 e24)) (op1 (j e24) (j e24))
% 79.43/79.62  Clause #1928 (by forward demodulation #[1927, 73]): Eq (j e22) (op1 (j e24) (j e24))
% 79.43/79.62  Clause #1930 (by superposition #[1928, 378]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (j e22) (op1 e10 e10)))))
% 79.43/79.62  Clause #2098 (by superposition #[1930, 277]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (j e22) e10))))
% 79.43/79.62  Clause #2099 (by superposition #[2098, 467]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e10) e22))))
% 79.43/79.62  Clause #2121 (by superposition #[2099, 1928]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) (op1 e12 e12)))))
% 79.43/79.62  Clause #2179 (by superposition #[2121, 222]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) e10))))
% 79.43/79.62  Clause #2187 (by superposition #[2179, 467]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (h e10) e22))))
% 79.43/79.62  Clause #2199 (by eliminate duplicate literals #[2187]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e10) e22)))
% 79.43/79.62  Clause #2208 (by superposition #[2199, 1928]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) (op1 e14 e14))))
% 79.43/79.62  Clause #2326 (by superposition #[2208, 57]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) e10)))
% 79.43/79.62  Clause #2327 (by superposition #[2326, 467]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (h e10) e22)))
% 79.43/79.62  Clause #2338 (by eliminate duplicate literals #[2327]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e10) e22))
% 79.43/79.62  Clause #2346 (by superposition #[2338, 1928]): Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) (op1 e11 e11)))
% 79.43/79.62  Clause #2408 (by superposition #[2346, 258]): Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (j e22) e10))
% 79.47/79.65  Clause #2409 (by superposition #[2408, 467]): Or (Eq (h e13) e24) (Or (Eq (h e10) e22) (Eq (h e10) e22))
% 79.47/79.65  Clause #2420 (by eliminate duplicate literals #[2409]): Or (Eq (h e13) e24) (Eq (h e10) e22)
% 79.47/79.65  Clause #2421 (by superposition #[2420, 219]): Or (Eq (h e10) e22) (Eq (j e24) e13)
% 79.47/79.65  Clause #2436 (by superposition #[2421, 1928]): Or (Eq (h e10) e22) (Eq (j e22) (op1 e13 e13))
% 79.47/79.65  Clause #2437 (by superposition #[2436, 198]): Or (Eq (h e10) e22) (Eq (j e22) e10)
% 79.47/79.65  Clause #2438 (by superposition #[2437, 467]): Or (Eq (h e10) e22) (Eq (h e10) e22)
% 79.47/79.65  Clause #2448 (by eliminate duplicate literals #[2438]): Eq (h e10) e22
% 79.47/79.65  Clause #2449 (by backward demodulation #[2448, 343]): Eq (j e22) e10
% 79.47/79.65  Clause #2450 (by backward demodulation #[2448, 379]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq e22 e24))))
% 79.47/79.65  Clause #2451 (by backward demodulation #[2448, 383]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq e22 e24) (Eq (h e12) e24))))
% 79.47/79.65  Clause #2633 (by forward contextual literal cutting #[2451, 11]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e12) e24)))
% 79.47/79.65  Clause #2711 (by forward contextual literal cutting #[2450, 11]): Or (Eq (j e24) e14) (Or (Eq (j e24) e12) (Or (Eq (j e24) e11) (Eq (h e13) e24)))
% 79.47/79.65  Clause #4805 (by clausification #[1926]): Eq
% 79.47/79.65    (And
% 79.47/79.65      (And
% 79.47/79.65        (And
% 79.47/79.65          (And
% 79.47/79.65            (And
% 79.47/79.65              (And
% 79.47/79.65                (And
% 79.47/79.65                  (And
% 79.47/79.65                    (And
% 79.47/79.65                      (And
% 79.47/79.65                        (And
% 79.47/79.65                          (And
% 79.47/79.65                            (And
% 79.47/79.65                              (And
% 79.47/79.65                                (And
% 79.47/79.65                                  (And
% 79.47/79.65                                    (And
% 79.47/79.65                                      (And
% 79.47/79.65                                        (And
% 79.47/79.65                                          (And
% 79.47/79.65                                            (And
% 79.47/79.65                                              (And
% 79.47/79.65                                                (And
% 79.47/79.65                                                  (And
% 79.47/79.65                                                    (And
% 79.47/79.65                                                      (And
% 79.47/79.65                                                        (And
% 79.47/79.65                                                          (And
% 79.47/79.65                                                            (And
% 79.47/79.65                                                              (And
% 79.47/79.65                                                                (And
% 79.47/79.65                                                                  (And
% 79.47/79.65                                                                    (And
% 79.47/79.65                                                                      (And
% 79.47/79.65                                                                        (And
% 79.47/79.65                                                                          (And
% 79.47/79.65                                                                            (And
% 79.47/79.65                                                                              (And
% 79.47/79.65                                                                                (And
% 79.47/79.65                                                                                  (And
% 79.47/79.65                                                                                    (And
% 79.47/79.65                                                                                      (And
% 79.47/79.65                                                                                        (And
% 79.47/79.65                                                                                          (And
% 79.47/79.65                                                                                            (And
% 79.47/79.65                                                                                              (And
% 79.47/79.65                                                                                                (And
% 79.47/79.65                                                                                                  (Eq (h (op1 e10 e10))
% 79.47/79.65                                                                                                    (op2 (h e10) (h e10)))
% 79.47/79.65                                                                                                  (Eq (h (op1 e10 e11))
% 79.47/79.65                                                                                                    (op2 (h e10)
% 79.47/79.65                                                                                                      (h e11))))
% 79.47/79.65                                                                                                (Eq (h (op1 e10 e12))
% 79.47/79.65                                                                                                  (op2 (h e10) (h e12))))
% 79.47/79.65                                                                                              (Eq (h (op1 e10 e13))
% 79.47/79.65                                                                                                (op2 (h e10) (h e13))))
% 79.47/79.65                                                                                            (Eq (h (op1 e10 e14))
% 79.47/79.65                                                                                              (op2 (h e10) (h e14))))
% 79.47/79.65                                                                                          (Eq (h (op1 e11 e10))
% 79.47/79.65                                                                                            (op2 (h e11) (h e10))))
% 79.47/79.65                                                                                        (Eq (h (op1 e11 e11))
% 79.47/79.65                                                                                          (op2 (h e11) (h e11))))
% 79.47/79.65                                                                                      (Eq (h (op1 e11 e12))
% 79.47/79.65                                                                                        (op2 (h e11) (h e12))))
% 79.47/79.65                                                                                    (Eq (h (op1 e11 e13))
% 79.47/79.65                                                                                      (op2 (h e11) (h e13))))
% 79.47/79.65                                                                                  (Eq (h (op1 e11 e14))
% 79.47/79.65                                                                                    (op2 (h e11) (h e14))))
% 79.47/79.65                                                                                (Eq (h (op1 e12 e10))
% 79.47/79.65                                                                                  (op2 (h e12) (h e10))))
% 79.47/79.65                                                                              (Eq (h (op1 e12 e11))
% 79.47/79.65                                                                                (op2 (h e12) (h e11))))
% 79.47/79.65                                                                            (Eq (h (op1 e12 e12)) (op2 (h e12) (h e12))))
% 79.47/79.65                                                                          (Eq (h (op1 e12 e13)) (op2 (h e12) (h e13))))
% 79.47/79.65                                                                        (Eq (h (op1 e12 e14)) (op2 (h e12) (h e14))))
% 79.47/79.65                                                                      (Eq (h (op1 e13 e10)) (op2 (h e13) (h e10))))
% 79.47/79.65                                                                    (Eq (h (op1 e13 e11)) (op2 (h e13) (h e11))))
% 79.47/79.65                                                                  (Eq (h (op1 e13 e12)) (op2 (h e13) (h e12))))
% 79.47/79.65                                                                (Eq (h (op1 e13 e13)) (op2 (h e13) (h e13))))
% 79.47/79.65                                                              (Eq (h (op1 e13 e14)) (op2 (h e13) (h e14))))
% 79.47/79.65                                                            (Eq (h (op1 e14 e10)) (op2 (h e14) (h e10))))
% 79.47/79.65                                                          (Eq (h (op1 e14 e11)) (op2 (h e14) (h e11))))
% 79.47/79.65                                                        (Eq (h (op1 e14 e12)) (op2 (h e14) (h e12))))
% 79.47/79.65                                                      (Eq (h (op1 e14 e13)) (op2 (h e14) (h e13))))
% 79.47/79.65                                                    (Eq (h (op1 e14 e14)) (op2 (h e14) (h e14))))
% 79.47/79.65                                                  (Eq (j (op2 e20 e20)) (op1 (j e20) (j e20))))
% 79.47/79.65                                                (Eq (j (op2 e20 e21)) (op1 (j e20) (j e21))))
% 79.47/79.67                                              (Eq (j (op2 e20 e22)) (op1 (j e20) (j e22))))
% 79.47/79.67                                            (Eq (j (op2 e20 e23)) (op1 (j e20) (j e23))))
% 79.47/79.67                                          (Eq (j (op2 e20 e24)) (op1 (j e20) (j e24))))
% 79.47/79.67                                        (Eq (j (op2 e21 e20)) (op1 (j e21) (j e20))))
% 79.47/79.67                                      (Eq (j (op2 e21 e21)) (op1 (j e21) (j e21))))
% 79.47/79.67                                    (Eq (j (op2 e21 e22)) (op1 (j e21) (j e22))))
% 79.47/79.67                                  (Eq (j (op2 e21 e23)) (op1 (j e21) (j e23))))
% 79.47/79.67                                (Eq (j (op2 e21 e24)) (op1 (j e21) (j e24))))
% 79.47/79.67                              (Eq (j (op2 e22 e20)) (op1 (j e22) (j e20))))
% 79.47/79.67                            (Eq (j (op2 e22 e21)) (op1 (j e22) (j e21))))
% 79.47/79.67                          (Eq (j (op2 e22 e22)) (op1 (j e22) (j e22))))
% 79.47/79.67                        (Eq (j (op2 e22 e23)) (op1 (j e22) (j e23))))
% 79.47/79.67                      (Eq (j (op2 e22 e24)) (op1 (j e22) (j e24))))
% 79.47/79.67                    (Eq (j (op2 e23 e20)) (op1 (j e23) (j e20))))
% 79.47/79.67                  (Eq (j (op2 e23 e21)) (op1 (j e23) (j e21))))
% 79.47/79.67                (Eq (j (op2 e23 e22)) (op1 (j e23) (j e22))))
% 79.47/79.67              (Eq (j (op2 e23 e23)) (op1 (j e23) (j e23))))
% 79.47/79.67            (Eq (j (op2 e23 e24)) (op1 (j e23) (j e24))))
% 79.47/79.67          (Eq (j (op2 e24 e20)) (op1 (j e24) (j e20))))
% 79.47/79.67        (Eq (j (op2 e24 e21)) (op1 (j e24) (j e21))))
% 79.47/79.67      (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))))
% 79.47/79.67    True
% 79.47/79.67  Clause #4855 (by clausification #[4805]): Eq (Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))) True
% 79.47/79.67  Clause #4857 (by clausification #[4855]): Eq (j (op2 e24 e22)) (op1 (j e24) (j e22))
% 79.47/79.67  Clause #4858 (by forward demodulation #[4857, 201]): Eq (j e20) (op1 (j e24) (j e22))
% 79.47/79.67  Clause #4859 (by forward demodulation #[4858, 2449]): Eq (j e20) (op1 (j e24) e10)
% 79.47/79.67  Clause #4862 (by superposition #[4859, 2633]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Eq (j e20) (op1 e14 e10))))
% 79.47/79.67  Clause #4864 (by superposition #[4859, 2711]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (j e20) (op1 e12 e10))))
% 79.47/79.67  Clause #4865 (by superposition #[4864, 228]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (j e20) e12)))
% 79.47/79.67  Clause #4868 (by superposition #[4865, 902]): Or (Eq (j e24) e14) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e12) e20)))
% 79.47/79.67  Clause #4876 (by superposition #[4868, 377]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Eq (h e14) e24)))
% 79.47/79.67  Clause #4884 (by superposition #[4868, 4859]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Eq (j e20) (op1 e14 e10))))
% 79.47/79.67  Clause #4886 (by superposition #[4876, 377]): Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Eq (h e11) e24)))
% 79.47/79.67  Clause #4893 (by superposition #[4876, 4859]): Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Eq (j e20) (op1 e11 e10))))
% 79.47/79.67  Clause #4926 (by superposition #[4884, 192]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Eq (j e20) e14)))
% 79.47/79.67  Clause #5065 (by superposition #[4893, 261]): Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Eq (j e20) e11)))
% 79.47/79.67  Clause #5069 (by superposition #[5065, 902]): Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Eq (h e11) e20)))
% 79.47/79.67  Clause #5091 (by superposition #[5069, 219]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (j e24) e13)))
% 79.47/79.67  Clause #5105 (by superposition #[5091, 4859]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (j e20) (op1 e13 e10))))
% 79.47/79.67  Clause #5115 (by superposition #[5105, 210]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (j e20) e13)))
% 79.47/79.67  Clause #5127 (by superposition #[5115, 902]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (h e13) e20)))
% 79.47/79.67  Clause #5154 (by superposition #[5127, 4886]): Or (Eq (h e12) e20)
% 79.47/79.67    (Or (Eq (h e14) e24)
% 79.47/79.67      (Or (Eq (h e11) e20) (Or (Eq e20 e24) (Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Eq (h e11) e24))))))
% 79.47/79.67  Clause #5326 (by superposition #[4862, 192]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Eq (j e20) e14)))
% 79.47/79.69  Clause #5329 (by superposition #[5326, 902]): Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Eq (h e14) e20)))
% 79.47/79.69  Clause #5345 (by superposition #[5329, 377]): Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Eq (h e11) e24)))
% 79.47/79.69  Clause #5352 (by superposition #[5329, 4859]): Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Eq (j e20) (op1 e11 e10))))
% 79.47/79.69  Clause #5364 (by superposition #[5345, 219]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (j e24) e13)))
% 79.47/79.69  Clause #5382 (by superposition #[5364, 4859]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (j e20) (op1 e13 e10))))
% 79.47/79.69  Clause #5394 (by superposition #[5352, 261]): Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Eq (j e20) e11)))
% 79.47/79.69  Clause #5398 (by superposition #[5394, 902]): Or (Eq (h e13) e24) (Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Eq (h e11) e20)))
% 79.47/79.69  Clause #5479 (by superposition #[5382, 210]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (j e20) e13)))
% 79.47/79.69  Clause #5482 (by superposition #[5479, 902]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (h e13) e20)))
% 79.47/79.69  Clause #5518 (by superposition #[5482, 5398]): Or (Eq (h e12) e24)
% 79.47/79.69    (Or (Eq (h e14) e20)
% 79.47/79.69      (Or (Eq (h e11) e24) (Or (Eq e20 e24) (Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Eq (h e11) e20))))))
% 79.47/79.69  Clause #6113 (by eliminate duplicate literals #[5518]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Or (Eq e20 e24) (Eq (h e11) e20))))
% 79.47/79.69  Clause #6114 (by forward contextual literal cutting #[6113, 29]): Or (Eq (h e12) e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (h e11) e20)))
% 79.47/79.69  Clause #7424 (by eliminate duplicate literals #[5154]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq e20 e24) (Eq (h e11) e24))))
% 79.47/79.69  Clause #7425 (by forward contextual literal cutting #[7424, 29]): Or (Eq (h e12) e20) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (h e11) e24)))
% 79.47/79.69  Clause #7426 (by superposition #[7425, 273]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (j e20) e12)))
% 79.47/79.69  Clause #7432 (by superposition #[7425, 6114]): Or (Eq (h e14) e24)
% 79.47/79.69    (Or (Eq (h e11) e20)
% 79.47/79.69      (Or (Eq (h e11) e24) (Or (Eq e20 e24) (Or (Eq (h e14) e20) (Or (Eq (h e11) e24) (Eq (h e11) e20))))))
% 79.47/79.69  Clause #7466 (by eliminate duplicate literals #[7432]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Or (Eq e20 e24) (Eq (h e14) e20))))
% 79.47/79.69  Clause #7467 (by forward contextual literal cutting #[7466, 29]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (h e14) e20)))
% 79.47/79.69  Clause #7468 (by superposition #[7467, 149]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (j e20) e14)))
% 79.47/79.69  Clause #7500 (by superposition #[7468, 7426]): Or (Eq (h e14) e24)
% 79.47/79.69    (Or (Eq (h e11) e20)
% 79.47/79.69      (Or (Eq (h e11) e24) (Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq e14 e12))))))
% 79.47/79.69  Clause #7503 (by eliminate duplicate literals #[7500]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq e14 e12)))
% 79.47/79.69  Clause #7504 (by forward contextual literal cutting #[7503, 42]): Or (Eq (h e14) e24) (Or (Eq (h e11) e20) (Eq (h e11) e24))
% 79.47/79.69  Clause #7505 (by superposition #[7504, 149]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (j e24) e14))
% 79.47/79.69  Clause #7515 (by superposition #[7505, 4859]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (j e20) (op1 e14 e10)))
% 79.47/79.69  Clause #7546 (by superposition #[7515, 192]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (j e20) e14))
% 79.47/79.69  Clause #7549 (by superposition #[7546, 902]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq (h e14) e20))
% 79.47/79.69  Clause #7567 (by superposition #[7549, 7504]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Or (Eq e20 e24) (Or (Eq (h e11) e20) (Eq (h e11) e24))))
% 79.47/79.69  Clause #7593 (by eliminate duplicate literals #[7567]): Or (Eq (h e11) e20) (Or (Eq (h e11) e24) (Eq e20 e24))
% 79.47/79.69  Clause #7594 (by forward contextual literal cutting #[7593, 29]): Or (Eq (h e11) e20) (Eq (h e11) e24)
% 79.47/79.69  Clause #7595 (by superposition #[7594, 307]): Or (Eq (h e11) e24) (Eq (j e20) e11)
% 79.47/79.69  Clause #7606 (by superposition #[7595, 4926]): Or (Eq (h e11) e24) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Eq e11 e14))))
% 79.56/79.74  Clause #7623 (by forward contextual literal cutting #[7606, 48]): Or (Eq (h e11) e24) (Or (Eq (j e24) e11) (Or (Eq (h e13) e24) (Eq (h e12) e20)))
% 79.56/79.74  Clause #7624 (by superposition #[7623, 377]): Or (Eq (h e11) e24) (Or (Eq (h e13) e24) (Or (Eq (h e12) e20) (Eq (h e11) e24)))
% 79.56/79.74  Clause #7651 (by eliminate duplicate literals #[7624]): Or (Eq (h e11) e24) (Or (Eq (h e13) e24) (Eq (h e12) e20))
% 79.56/79.74  Clause #7652 (by superposition #[7651, 219]): Or (Eq (h e11) e24) (Or (Eq (h e12) e20) (Eq (j e24) e13))
% 79.56/79.74  Clause #7673 (by superposition #[7652, 4859]): Or (Eq (h e11) e24) (Or (Eq (h e12) e20) (Eq (j e20) (op1 e13 e10)))
% 79.56/79.74  Clause #7703 (by superposition #[7673, 210]): Or (Eq (h e11) e24) (Or (Eq (h e12) e20) (Eq (j e20) e13))
% 79.56/79.74  Clause #7727 (by superposition #[7703, 7595]): Or (Eq (h e11) e24) (Or (Eq (h e12) e20) (Or (Eq (h e11) e24) (Eq e13 e11)))
% 79.56/79.74  Clause #7747 (by eliminate duplicate literals #[7727]): Or (Eq (h e11) e24) (Or (Eq (h e12) e20) (Eq e13 e11))
% 79.56/79.74  Clause #7748 (by forward contextual literal cutting #[7747, 51]): Or (Eq (h e11) e24) (Eq (h e12) e20)
% 79.56/79.74  Clause #7749 (by superposition #[7748, 273]): Or (Eq (h e11) e24) (Eq (j e20) e12)
% 79.56/79.74  Clause #7782 (by superposition #[7749, 7595]): Or (Eq (h e11) e24) (Or (Eq (h e11) e24) (Eq e12 e11))
% 79.56/79.74  Clause #7783 (by eliminate duplicate literals #[7782]): Or (Eq (h e11) e24) (Eq e12 e11)
% 79.56/79.74  Clause #7784 (by forward contextual literal cutting #[7783, 54]): Eq (h e11) e24
% 79.56/79.74  Clause #7785 (by backward demodulation #[7784, 307]): Eq (j e24) e11
% 79.56/79.74  Clause #7894 (by backward demodulation #[7785, 4859]): Eq (j e20) (op1 e11 e10)
% 79.56/79.74  Clause #7950 (by superposition #[7894, 261]): Eq (j e20) e11
% 79.56/79.74  Clause #7952 (by backward demodulation #[7950, 902]): Eq (h e11) e20
% 79.56/79.74  Clause #7961 (by superposition #[7952, 7784]): Eq e20 e24
% 79.56/79.74  Clause #7962 (by forward contextual literal cutting #[7961, 29]): False
% 79.56/79.74  SZS output end Proof for theBenchmark.p
%------------------------------------------------------------------------------